Skip to content
PlanIndex Get alerts
Menu

Planning application

1 Oakfield Road Manchester M20 6XA

Granted Manchester 119878/NMC/2018 Non-Material Change Application

Works: Loft or dormer Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Non-material amendment to planning permission 108974/FH/2015/S2 to allow for omission of door in east elevation and replacement with window, reduction to the number of rooflights from 6no. to 3no. and installation of 3no. photovotaic panels

As published by the council, reference 119878/NMC/2018

Application record

Reference
119878/NMC/2018
Type
Non-Material Change Application
Status
Decided
Decision
Granted As published: Approved
Received
17 Apr 2018
Validated
17 Apr 2018
Decided
15 May 2018
Ward
Didsbury West Ward
Decision by
Delegated Decision
Postcode
M20 6XA

Site history

Applications at this address on the Manchester register

This site has had 2 applications since 2018: 2 approved, 0 refused.

  • CDN/18/0810 Granted

    1 Oakfield Road Manchester M20 6XA

    Application to discharge condition nos. 2 (materials) and 6 (landscaping) attached to planning permission 108974/FH/2015/S2

    Decided 18 Dec 2018 Conditions

Timeline

Dates from the published record

  1. 17 Apr 2018

    Received by Manchester

  2. 15 May 2018

    Decision issued: Approved

  3. 30 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Walker Simpson Architects Agent, an architecture practice registered in Altrincham

Active · incorporated 1999 · Altrincham

41 applications on PlanIndex · across 7 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Manchester granted permission on 15 May 2018, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 1 Oakfield Road Didsbury Manchester M20 6XA

    108974/FH/2015/S2 Submitted 22 May 2015 50 yards away

    Erection of single-storey out-building to form ancillary living accommodation following the demolition of existing single-storey timber garage

    Granted Householder Demolition 9 docs
    Small domestic
  • 1 Oakfield Road Manchester M20 6XA

    CDN/18/0810 Submitted 31 Oct 2018 50 yards away

    Application to discharge condition nos. 2 (materials) and 6 (landscaping) attached to planning permission 108974/FH/2015/S2

    Granted Conditions 3 docs
  • 30 Pine Road Manchester M20 6UZ

    115214/TCA/2017 Submitted 6 Feb 2017 50 yards away

    Works to tree - proposed pruning works to (T1) Beech and crown reduction by 2m to (T2) Eucalyptus

    Granted Trees 5 docs
  • 30 Pine Road Manchester M20 6UZ

    121038/FH/2018 Submitted 21 Aug 2018 50 yards away

    Removal of existing lean- to roof to side, and installation of raised, pitched roof together with elevational alterations

    Granted Householder 12 docs
    Domestic
  • The Bungalow 1A Oakfield Road Manchester M20 6XA

    124073/FO/2019 Submitted 1 Jul 2019 50 yards away

    Erection of front canopy together with external elevational alterations including the raising of the garage roof and installation of roof lantern in association with internal adaptations and improvements

    Granted Full applications Windows or glazing 5 docs
  • The Bungalow 1A Oakfield Road Didsbury Manchester M20 6XA

    112485/TCA/2016/S2 Submitted 13 Jun 2016 50 yards away

    Works to trees - proposed pruning works to Ash to reduce to height of an Ash tree (works to be carried out on bi annual basis to maintain height) and reduction of canopy along within curtilage of 1 Oakfield Rd, pruning of a blossom/fruit tree to the front of the property and removal of a self seeded Sycamore adjacent to common boundary.

    Granted Trees 2 docs

In Manchester

  • PLA-2026-000033 Withdrawn

    Churchgate House 56 Oxford Street Manchester M1 6EU

    Variation of conditions 2 (Specified Plans), 6 (Kitchenette Works), and 11 (Works not permitted) attached to Listed building consent 140376/LO/2024.

    Received 27 Apr, published by the council 20 Jul 2026 Amendments
  • OTH-2026-001904 Awaiting decision

    88-90 Carmoor Road Manchester M13 0FB

    Non Material Amendment to planning permission reference 135576/FO/2022 to allow layout change and elevational alterations.

    Received 7 Oct, published by the council 10 Oct 2026 Amendments
  • OTH-2026-001890 Awaiting decision

    61 Factory Lane Manchester M9 8GR

    Non Material Change to planning permission PLA-2026-001147 to allow alteration to the hexagonal bay to a rectangular bay.

    Received 7 Oct, published by the council 10 Oct 2026 Amendments
  • OTH-2026-001879 Awaiting decision

    Norfolk House Norfolk Street Manchester M2 1DH

    Non-material Amendment to Condition 2 (Plans and Documents) attached to planning permission 144411/FO/2025 to facilitate external alterations.

    Received 6 Oct, published by the council 10 Oct 2026 Amendments
  • PLA-2026-001126 Granted

    466-468 Moss Lane East Manchester M14 4PJ

    Variation of Condition 2 (Specified plans) attached to Planning Permission 143607/JO/2025 to allow for the replacement of additional internal walls.

    Received 23 Jul, published by the council 17 Aug 2026 Amendments