Planning application
140 Royle Green Road Manchester M22 4LD
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Prior notification of proposed larger home extension for single storey rear extension with a rearward projection of 4m, maximum eaves height of 2m and total roof height of 2.9m
As published by the council, reference 119371/PDE/2018
Application record
- Reference
- 119371/PDE/2018
- Type
- General Permitted Development-Extensions
- Status
- Decided
- Decision
- Conditional extension - GPD
- Received
- 13 Mar 2018
- Validated
- 13 Mar 2018
- Decided
- 9 Apr 2018
- Ward
- Northenden Ward (2004)
- Decision by
- Delegated Decision
- Postcode
- M22 4LD
Timeline
Dates from the published record
-
13 Mar 2018
Received by Manchester
-
9 Apr 2018
Decision issued: Conditional extension - GPD
-
30 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
Manchester has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Leltex House Longley Lane Manchester M22 4SY
Erection of a first floor extension to provide additional storage space
Granted Full applications Extension 14 docs -
Vacant Land North Of Longley Lane And Opposite The Junction With Sharston Road Manchester
Proposed construction of 4No. dwelling houses and a private shared surface driveway with access from Longley Lane.
Granted Full applications 24 docsSeveral homes -
Cardinal Global Logistics Ltd. Sharston Industrial Estate Harling Road Manchester M22 4UX
Listed Building Consent for the undertaking of elevational repairs
Granted Heritage and listed buildings 16 docs -
Lee Court Longley Lane Manchester M22 4HZ
Construction of a two storey passenger lift to the rear of the building
Granted Full applications 5 docs -
Electrium Sales Ltd Sharston Road Manchester M22 4RA
Application to discharge condition 28 (waste management) attached to planning permission 143771/FO/2025.
Granted Conditions 5 docs -
Electrium Sales Ltd Wylex Works Sharston Road Manchester M22 4RA
Application to discharge condition no. 8 (drainage) attached to planning permission 143771/FO/2025.
Granted Conditions 4 docs
Other prior approval applications
In Manchester
-
NOT-2026-001023 Granted
38 Overdale Road Manchester M22 4PX
Prior-notification of proposed larger home extension projecting 4m to the rear with a maximum height of 3.6m and a height at eaves of 2.8m.
-
NOT-2026-001230 Decided
25 Brookburn Road Manchester M21 8FF
Prior-notification of proposed larger home extension projecting 5.5m to the rear with a maximum height of 3m and a height at eaves of 2.5m.
-
NOT-2026-000996 Granted
3 Lanreath Walk Manchester M8 8WF
Prior notification of proposed larger home extension projecting 4m to the rear with a maximum height of 3m and a height at eaves of 2.7m.
-
NOT-2026-000987 Granted
23 Beechwood Avenue Manchester M21 8UA
Prior notification of proposed larger home extension projecting 3.4m to the rear with a maximum height of 4m and a height at eaves of 3m.
-
NOT-2026-000886 Granted
Footpath on South Side of Butler Street / Woodward Street Junction, North of 126 Butler Street Manchester M4 7JJ
Prior approval for the siting of a 20m high telecommunications mast, associated antennas, cabinets and ancillary development for a period of 3 years.