Planning application
Greenheys Building Manchester Science Park Pencroft Way Manchester M15 6JJ
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of secure cycle parking facility to accommodate up to 100no. bicycles in association with the removal of 6no. existing covered cycle hoops, creation of 1no. new car parking space
As published by the council, reference 114886/FO/2016
Application record
- Reference
- 114886/FO/2016
- Type
- Full Application Consent
- Status
- Permitted
- Decision
- Granted As published: Approved
- Received
- 22 Dec 2016
- Validated
- 22 Dec 2016
- Decided
- 16 Feb 2017
- Ward
- Hulme Ward (2004)
- Decision by
- Delegated Decision
- Postcode
- M15 6JJ
Timeline
Dates from the published record
-
22 Dec 2016
Received by Manchester
-
16 Feb 2017
Decision issued: Approved
-
28 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Deloitte LLP Agent
868 applications on PlanIndex · across 22 councils · 99% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Manchester granted permission on 16 February 2017, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Greenheys Business Centre Pencroft Way Manchester M15 6JJ
Discharge of Condition 3c (Materials) attached to planning permission 141721/JO/2024 as amended by 139307/NMC/2024.
Granted Conditions 7 docs -
Enterprise House Pencroft Way Manchester M15 6JJ
Discharge of Conditions 11 (Plant Noise), 14b (Labour agreement construction), 18 (Lighting), and 32 (Noise Use) attached to Planning Permission 136934/FO/2023.
Granted Conditions 9 docs -
Greenheys Business Centre, Pencroft Way, Manchester, M15 6JJ
Discharge Of Conditions 8 (SUDS Verification),15 (Local Labour Use), 27 (Service Management), 30 (ASHP Details), 35 (PV details) , 38 (Car Park Management) and 40 (Hours Terrace) attached to planning permission 138222/JO/2023.
Granted Conditions 13 docs -
Enterprise House Pencroft Way Manchester M15 6JJ
Installation of 1 no. illuminated high level building sign together with 2no. non-illuminated free-standing directional signs.
Granted Advertising 14 docs -
Base Greenheys Lane Manchester M15 6LR
Advertisement consent to display an Entrance Sign (internally illuminated), Traffic Directional Sign and Gateway Totem Sign (internally illuminated).
Granted Advertising 8 docs -
Base Greenheys Lane Science Park Manchester M15 6LR
Non Material Amendment to vary condition 2f (Specified Plans and Drawings) attached to application ref no 137779/FO/2023 in order to update the Operational Management Strategy.
Granted Amendments 6 docs
Other full applications
In Manchester
-
PLA-2026-001348 Granted
PICCADILLY GARDENS PICCADILLY MANCHESTER M1 1LS
City Council Development - Redevelopment and reconfiguration of Piccadilly Gardens comprising works to the public realm including public open space and use of space for events, together with decommissioning and removal of the existing fountain; creation of play space, lawn area, hard and soft landscaping; lighting; and drainage and other associated infrastructure; and a severable plot for a future ancillary structure with associated interim landscaping.
-
PLA-2026-001374 Awaiting decision
Land bounded by Victoria Point, Longsight Primary Sub-Station, West Grove, Upper West Grove, Carmoor Road and Hathersage Road Manchester M13 0EH
Refurbishment and extension of Octagon House and the erection of buildings of up to 11 storeys in height to accommodate a mix of uses comprising Purpose Built Student Accommodation bedrooms (205 studios and 35 apartments accommodating 250 bedrooms) (Sui Generis Use Class); Key Worker accommodation (Sui Generis Use Class) (211 units); Residential units (16 no) (Use Class C3); 2,568 sq m of healthcare use (including the retention of an existing healthcare facility on site) (Use Class Ee); and 394 sq m of commercial or community uses (Use Classes Ea, Eb, Eciii, Ee, Ef, F1e, F2b, F2c) with associated site access, car and cycle parking and landscaping."
-
PLA-2026-001170 Granted
Winters Buildings 30 St Ann Street Manchester M2 7LF
Change of use of second, third, and fourth floors from commercial use (Use Class E), to create 5no residential apartments (Class C3), other associated external works including creation of roof terrace, residential entrance, works to roof and windows, replacement of rainwater goods, and associated works with retention of basement, ground, and first floors in Class E use.
-
PLA-2026-000092 Refused
132-134 Burton Road, Manchester M20 1JQ
Installation of external plant equipment and cage with removable access gate.
-
PLA-2026-001237 Awaiting decision
4 Hucklow Avenue Manchester M23 2YX
Creation of driveway, associated boundary treatment and erection of a retaining wall.