Skip to content
PlanIndex Get alerts
Menu

Planning application

Full Gospel Church Eastwood Road New Moston Manchester M40 3TF

Granted Manchester 106606/FO/2014/N1 Full Application Consent

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of single storey rear and side extensions (wrap around) to the existing church to provide additional accommodation

As published by the council, reference 106606/FO/2014/N1

Application record

Reference
106606/FO/2014/N1
Type
Full Application Consent
Status
Permitted
Decision
Granted As published: Approved
Received
13 Aug 2014
Validated
13 Aug 2014
Decided
10 Oct 2014
Ward
Moston Ward (2004)
Decision by
Delegated Decision
Postcode
M40 3TF

Site history

Applications at this address on the Manchester register

This site has had 2 applications since 2014: 2 approved, 0 refused.

  • Full Gospel Church Eastwood Road New Moston Manchester M40 3TF

    Variation of planning condition 2 (specified plans) attached to approved planning permission 106606/FO/2014/N1 to allow for elevational alterations in the front of the approved right hand side side extension so that an approved window shall become an emergency exit door

    Decided 24 Apr 2015 Amendments

Timeline

Dates from the published record

  1. 13 Aug 2014

    Received by Manchester

  2. 10 Oct 2014

    Decision issued: Approved

  3. 24 Nov 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Goldcrest Design Services Ltd. Agent, a design practice registered in Warrington

Active · incorporated 2000 · Warrington

82 applications on PlanIndex · across 9 councils · 94% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

6 documents on file for this application

A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

Working a patch? Trade sends you every new job in your area each morning. 14 days free.

What this grant of permission means

Manchester granted permission on 10 October 2014, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Full Gospel Church Eastwood Road New Moston Manchester M40 3TF

    108205/JO/2015/N1 Submitted 27 Feb 2015 50 yards away

    Variation of planning condition 2 (specified plans) attached to approved planning permission 106606/FO/2014/N1 to allow for elevational alterations in the front of the approved right hand side side extension so that an approved window shall become an emergency exit door

    Granted Amendments Extension Windows or glazing 8 docs
  • 73 Belgrave Road Moston Manchester M40 3SS

    104867/FH/2014/N1 Submitted 14 Feb 2014 100 yards away

    Erection of rear extension to side of existing outrigger to form additional living accommodation

    Granted Householder Extension 5 docs
    Domestic
  • Bakehouse Rear Of 11 Eastwood Road Manchester M40 3TF

    121965/FO/2018 Submitted 12 Jun 2019 100 yards away

    Change of use of existing building (Class B1) to form two bedroom dwellinghouse (Class C3) including elevational alterations

    Withdrawn Full applications 12 docs
    Domestic
  • Land To The Rear Of 126 Moston Lane East And 1-3 Bannatyne Close Off Eastwood Road Moston Manchester M40 3TF

    104930/FO/2014/N1 Submitted 26 Feb 2014 100 yards away

    Erection of one single storey unit to form 2 individual storage units, following demolition of existing building.

    Withdrawn Full applications Demolition 4 docs
    Small domestic
  • 19 Parkfield Road North Manchester M40 3TB

    126847/LP/2020 Submitted 5 May 2020 100 yards away

    Certificate of Lawful Proposed Development for the erection of a single storey side extension

    Granted Lawful development Extension 7 docs
    Small domestic
  • Old Bake House 13 Eastwood Road Manchester M40 3TF

    144543/P3MAP/2025 Submitted 17 Nov 2025 100 yards away

    Prior approval for change of use from existing cafe Class E to class C3(a) residential including alterations to existing building including addition of 1no. double window and addition of 1no. roof light.

    Refused Prior approval Loft or dormer Windows or glazing 9 docs

In Manchester

  • PLA-2026-001843 Granted

    Flat 75 Chepstow House 16-20 Chepstow Street Manchester M1 5JF

    Installation of 4 skylights.

    Received 29 Sep, published by the council 10 Oct 2026 Full applications
  • PLA-2026-000242 Withdrawn

    Land to the north of 4 and 6 Mansfield Avenue Manchester M9 6RJ

    Erection of 2 semi-detached family dwellinghouses (Use Class C3(a)) with associated, landscaping and boundary treatment and parking spaces.

    Received 2 Jul, published by the council 20 Jul 2026 Full applications
  • PLA-2026-000622 Granted

    Sainsburys's Heaton Park Retail Park Heaton Park Road Manchester M9 0QS

    Installation of a We Buy Any Car customer pod (sui generis use) with associated allocated car parking and PV panels to the roof of the sales pod

    Received 25 Aug, published by the council 20 Jul 2026 Full applications
  • 145548/FO/2026 Refused

    Land Adjacent To 4 Neswick Walk Manchester M23 0HY

    Erection of two-storey detached dwellinghouse incorporationg rear roof dormer (Class C3) with associated landscaping.

    Received 10 Apr, published by the council 20 Jul 2026 Full applications
  • PLA-2026-001186 Granted

    St Pauls RC High School Firbank Road Manchester M23 2YS

    Installation of modular classroom building.

    Received 9 Sep, published by the council 18 Sep 2026 Full applications