Planning application
The Terrace 8 Colchester Road Great Totham Maldon Essex CM9 8BZ
Relates to 25/00732/FUL
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Compliance with conditions notification 25/00732/FUL (Change of property from c3 residential to mixed use for acupuncture/general chinese medical centre and c3 (retrospective)) Condition 3 - details of the parking arrangements.
As published by the council, reference 26/05086/DET
Application record
- Reference
- 26/05086/DET
- Status
- Conditions discharged
- Received
- 17 Jul 2026
- Validated
- 21 Jul 2026
- Postcode
- CM9 8BZ
Site history
Applications at this address on the Maldon register
This site has had 3 applications since 2025: 2 approved, 0 refused.
-
25/00733/ADV Granted
The Terrace 8 Colchester Road Great Totham Maldon Essex CM9 8BZ
Installation of 1x non-illuminated painted timber fascia sign to front elevation
-
25/00732/FUL Granted
The Terrace 8 Colchester Road Great Totham Maldon Essex CM9 8BZ
Change of property from c3 residential to mixed use for acupuncture/general chinese medical centre and c3 (retrospective)
Timeline
Dates from the published record
-
17 Jul 2026
Received by Maldon
-
21 Jul 2026
Validated
Checked as complete and ready for consideration.
-
25 Jul 2026
Added to PlanIndex
-
15 Sep 2026
Status changed to Conditions discharged
Previously Pending consideration.
-
Decision
Awaiting decision
Decision expected by 15 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Maldon took a median of 87 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
25/00732/FUL Granted
The Terrace 8 Colchester Road Great Totham Maldon Essex CM9 8BZ
Change of property from c3 residential to mixed use for acupuncture/general chinese medical centre and c3 (retrospective)
What happens while it is decided
This application is with Maldon for determination, against a statutory target of eight weeks. Over the last year Maldon's median decision took 87 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Maldon's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
The Terrace 8 Colchester Road Great Totham Maldon Essex CM9 8BZ
Installation of 1x non-illuminated painted timber fascia sign to front elevation
Granted Advertising -
The Terrace 8 Colchester Road Great Totham Maldon Essex CM9 8BZ
Change of property from c3 residential to mixed use for acupuncture/general chinese medical centre and c3 (retrospective)
Granted Full applications -
Roundbush Farm Colchester Road Great Totham Maldon Essex CM9 8BZ
Compliance with conditions notification 22/00863/LBC (Demolition of a 20th Century conservatory and the construction of new single storey side extension. Internal modifications to the existing kitchen, alterations to 20th Century rear south facade windows and the creation of a new doorway through the east wall of the main house to the new extension.) Condition 4 - Windows and doors
Decided Reserved matters Extension Demolition +1 8 docsSmall domestic -
Roundbush Farm Colchester Road Great Totham Maldon Essex CM9 8BZ
Compliance with conditions notification 22/00862/HOUSE (Demolition of a 20th Century conservatory and the construction of new single storey side extension.) Condition 4 - Windows and doors
Decided Reserved matters Extension Demolition +1 8 docsSmall domestic -
Roundbush Colchester Road Great Totham Maldon Essex CM9 8BZ
Application for non-material amendment following grant of planning permission 24/00169/HOUSE (Two storey front and rear extensions. Demolition of existing garage to facilitate single storey side extension. Alterations to fenestration including changes to roof to principal elevation.) Amendment sought: Align the roof ridge with the top of the chimney stacks to improve the visual balance of the front elevation, apply a consistent roof slope angle across all structures for a more cohesive design, add additional windows and roof lights to the kitchen section (side extension) to improve natural daylight and ventilation, include two new windows in the first-floor bathrooms to further enhance daylight and ventilation, modify the rear window designs to match the enlarged and uniform style consistent with the rest of the property, replace the railing on the first-floor enclosed balcony with glass balustrades for a better aesthetic.
Refused Amendments Extension Loft or dormer +2Small domestic -
Osea Lodge 11B Colchester Road Great Totham Essex CM9 8BZ
Claim for lawful development certificate for a proposed single storey side extension
Granted Lawful development Extension 6 docsSmall domestic