Planning application
Church Of All Saints Crouchmans Farm Road Ulting Maldon Essex CM9 6QU
Works: Trees
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
(TPO 06/23) T1 Ash - Re-application for consent to coppice the tree at 1.5m above ground level, in lieu of the previously approved 4m standing monolith. The entire main stem will be felled and retained in situ at ground level alongside the coppice stool.
As published by the council, reference 26/00526/WTPO
Application record
- Reference
- 26/00526/WTPO
- Status
- Pending consideration
- Received
- 30 Jul 2026
- Validated
- 30 Jul 2026
- Postcode
- CM9 6QU
Timeline
Dates from the published record
-
30 Jul 2026
Received by Maldon
-
8 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 24 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Maldon took a median of 131 days over the applications it decided in the last year.
What happens while it is decided
The process from here
This application is with Maldon for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About this record
Reading the register
This page mirrors an entry on the statutory planning register that Maldon is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.
Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.
Nearby applications
Within 500 metres
-
Oak Trees Crouchmans Farm Road Ulting Essex CM9 6QU
Compliance with conditions notification 19/00253/FUL (Demolition of existing dwelling and garage and construction of new dwelling) - Surface and Foul Water Drainage and Materials
Decided Reserved matters New dwelling Demolition 11 docsDomestic -
Oak Trees Crouchmans Farm Road Ulting Maldon Essex CM9 6QU
77% historically approved · decision due ~23 Oct
Construction of two dwellings to replace existing extant permission for single large detached dwelling
Awaiting decision Full applications New dwelling 25 docsSeveral homes -
Barn At Church Cottages Crouchmans Farm Road Ulting Essex
Conversion of existing Barn / Store to Annexe
Granted Full applications 13 docs -
Ulting Wick Crouchmans Farm Road Ulting Essex CM9 6QX
T1 Ash - Dead & dangerous
Granted Trees 5 docs -
-
The Old Vicarage Crouchmans Farm Road Ulting Maldon Essex CM9 6QX
81% historically approved · decision due ~21 Jul
Compliance with conditions notification 25/01122/LBC (Removal of the existing conservatory and construction of a smaller orangery. Internal and external alterations to the pool room including a new staircase, the replacement of an existing four-panel window with double doors and a two-panel window, and the replacement of an existing stable door with a window.) Condition 6- Replacement of windows and doors
Decided Extension Windows or glazing