Skip to content
PlanIndex Get alerts
Menu

Planning application

Unit 3 The Old Ironworks Fullbridge Maldon Essex CM9 4LE

Granted Maldon 23/00584/ADV Advert Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

1No. externally illuminated fascia and 1No. externally illuminated projector.

As published by the council, reference 23/00584/ADV

Application record

Reference
23/00584/ADV
Type
Advert Application
Status
Application approved
Decision
Granted As published: Approved
Received
9 Jun 2023
Validated
9 Jun 2023
Decided
22 Aug 2023
Ward
Maldon North
Parish
Maldon North
Decision by
Delegated
Postcode
CM9 4LE

Site history

Applications at this address on the Maldon register

This site has had 4 applications since 2022: 4 approved, 0 refused.

  • 23/00706/LBC Granted

    Unit 3 The Old Ironworks Fullbridge Maldon Essex CM9 4LE

    Addition 1No. externally illuminated fascia and 1No. externally illuminated projector.

    Decided 15 Sep 2023 Heritage and listed buildings
  • 23/00416/FUL Granted

    Unit 3 The Old Ironworks Fullbridge Maldon Essex CM9 4LE

    Split of Ground Floor Unit 3 to create 2. No commercial units. Relates to approved application 22/01170/LBC.

    Decided 23 Jun 2023 Full applications
  • 22/01170/LBC Granted

    Unit 3 The Old Ironworks Fullbridge Maldon Essex CM9 4LE

    Split of ground floor unit 3 to create 2no. commercial units, including removal of partitioning and insertion of new partitioning and doors to facilitate split.

    Decided 9 Jan 2023 Heritage and listed buildings

Timeline

Dates from the published record

  1. 9 Jun 2023

    Received by Maldon

  2. 22 Aug 2023

    Decision issued: Approved

  3. 21 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Maldon granted permission on 22 August 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About advertisement consent applications

Advertisement consent is judged on two things only: amenity and public safety, not competition or other planning considerations. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Unit 3 The Old Ironworks Fullbridge Maldon Essex CM9 4LE

    23/00706/LBC Submitted 17 Jul 2023 50 yards away

    Addition 1No. externally illuminated fascia and 1No. externally illuminated projector.

    Granted Heritage and listed buildings 12 docs
  • Unit 3 The Old Ironworks Fullbridge Maldon Essex CM9 4LE

    22/01170/LBC Submitted 14 Nov 2022 50 yards away

    Split of ground floor unit 3 to create 2no. commercial units, including removal of partitioning and insertion of new partitioning and doors to facilitate split.

    Granted Heritage and listed buildings 9 docs
  • Unit 3 The Old Ironworks Fullbridge Maldon Essex CM9 4LE

    23/00416/FUL Submitted 14 Apr 2023 50 yards away

    Split of Ground Floor Unit 3 to create 2. No commercial units. Relates to approved application 22/01170/LBC.

    Granted Full applications 8 docs
  • The Old Ironworks Fullbridge Maldon Essex

    23/00841/LBC Submitted 30 Aug 2023 50 yards away

    Retrospective application for erection of internal stud walls to form 2no. changing rooms with showers, office and store room within a Grade II Listed Building

    Granted Heritage and listed buildings 14 docs
  • Unit 3A The Old Ironworks Fullbridge Maldon Essex CM9 4LE

    23/01099/LBC Submitted 20 Oct 2023 50 yards away

    Replacement of existing timber external entrance doors, widening of brickwork opening and installation of new timber shop front and adjustment of external ramp to suit

    Granted Heritage and listed buildings Windows or glazing 13 docs
  • Unit 3A The Old Ironworks Fullbridge Maldon Essex CM9 4LE

    23/01107/FUL Submitted 20 Oct 2023 50 yards away

    Replacement of existing timber external entrance doors, widening of brickwork opening and installation of new timber shop front and adjustment of external ramp to suit

    Granted Full applications Windows or glazing 12 docs

In Maldon

  • 26/00748/ADV Awaiting decision

    Dough And Co 8 High Street Maldon Essex CM9 5PJ

    Installation of sign above entrance door and reinstatement of timber canopy. Redecoration of existing walls and windows including installation of half frosted windows with graphics to ground floor windows. Air conditioning unit to rear elevation.

    Received 27 Oct, published by the council 3 Nov 2026 Advertising
  • 26/00578/ADV Refused

    Barclays 18 High Street Burnham-On-Crouch Essex CM0 8AA

    Retrospective advertisement consent for 2No. fascia signs with externally illuminated light, 6No. window vinyls, 1No. door vinyl and 1No. non-illuminated panel sign.

    Received 21 Aug, published by the council 8 Sep 2026 Advertising
  • 26/00707/ADV Awaiting decision

    The Terrace 8 Colchester Road Great Totham Maldon Essex CM9 8BZ

    Installation of one internally illuminated fascia sign to front elevation

    Received 9 Oct, published by the council 28 Oct 2026 Advertising
  • 26/00498/ADV Granted

    Manythings 165 Station Road Burnham-On-Crouch Essex CM0 8HJ

    Retrospective application for replacement fascia signage and hanging sign for use as a Travel Agency for East-of-England Co-Op.

    Received 23 Jul, published by the council 8 Aug 2026 Advertising
  • 25/01089/ADV Granted

    Carlton Jewellers 2 The Kings Head Centre 38 High Street Maldon Essex CM9 5PN

    Advertisement consent for the replacement of existing shop signage

    Received 9 Dec, published by the council 23 Jul 2026 Advertising