Skip to content
PlanIndex Get alerts
Menu

Planning application

27 Mundon Road Maldon Essex CM9 5JT

Granted Maldon 22/00346/FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey detached granny annexe

As published by the council, reference 22/00346/FUL

Application record

Reference
22/00346/FUL
Type
Full Application
Status
Application approved
Decision
Approved
Received
18 Feb 2022
Validated
15 Mar 2022
Decided
1 Mar 2023
Ward
Maldon East
Parish
Maldon East
Decision by
Central Area Committee
Postcode
CM9 5JT

Timeline

Dates from the published record

  1. 18 Feb 2022

    Received by Maldon

  2. 15 Mar 2022

    Validated

    Checked as complete and ready for consideration.

  3. 1 Mar 2023

    Decision issued: Approved

  4. 9 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 27 Mundon Road Maldon Essex CM9 5JT

    22/00672/HOUSE Submitted 25 May 2022 0m away

    Single storey rear extension.

    Refused Householder Extension 11 docs
    Small domestic
  • 17 Mundon Road Maldon Essex CM9 5JT

    24/00528/HOUSE Submitted 1 Jul 2024 52m away

    Demolition of single storey projection and conservatory to the rear and replace with a single storey extension.

    Granted Householder Extension Demolition 18 docs
    Small domestic
  • 12 Longfellow Road Maldon Essex CM9 6BD

    21/00583/HOUSE Submitted 26 May 2021 112m away

    Single storey side and rear extension

    Granted Householder Extension 11 docs
    Small domestic
  • 132 Mill Road Maldon Essex CM9 5JA

    21/00429/COUPA Submitted 13 Apr 2021 168m away

    Change of use from A1 to A3

    Refused Prior approval 13 docs
  • 212 Wantz Road Maldon Essex CM9 5DG

    24/00470/HOUSE Submitted 3 Jun 2024 176m away

    Proposed rear extension

    Granted Householder Extension 8 docs
    Domestic
  • 10A Cross Road Maldon Essex CM9 5EE

    25/01073/HOUSE Submitted 4 Dec 2025 178m away

    Single storey rear and first floor rear extension with addition of rooflights.

    Granted Householder Extension Loft or dormer
    Small domestic

In Maldon

  • 25/00972/FUL Granted

    Agricultural Building At Oak Nursery Hackmans Lane Purleigh Essex

    Demolition of existing glasshouses and erection of new dwelling and associated parking area

    28 Oct 2025 Full applications
  • 26/00314/FUL Granted

    69 East Street Tollesbury Maldon Essex CM9 8QE

    Proposed change of use from an office to a children residential home C2 to accommodate 3 children and a live in carer.

    7 May 2026 Full applications
  • 26/00565/FUL Awaiting decision

    Cobbs Farm Maldon Road Goldhanger Maldon Essex CM9 8BQ

    Construction of an additional livestock building for the housing of pigs at Cobbs Farm, and the construction of relating ancillary works.

    14 Aug 2026 Full applications
  • 25/00997/FUL Refused

    Land Adjacent To Oak Corner Cottage Southend Road Woodham Mortimer Essex

    Erection of a new self-build dwelling and associated works

    7 Nov 2025 Full applications
  • 25/00809/FUL Refused

    Land At Oxley House Tiptree Colchester Essex

    New barn building for apiculture associated with adjoining meadowland

    8 Sep 2025 Full applications