Planning application
19 Spital Road Maldon Essex CM9 6DY
Works: Extension Roofing Demolition Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Demolition of existing single storey rear & side extension & construction of new single storey rear & two storey side extension on same footprint as existing extension. Removal of existing roof tiles & remaining chimney & replaced by external blue/black slates to match existing building.
As published by the council, reference 21/00668/FUL
Application record
- Reference
- 21/00668/FUL
- Type
- Full Application
- Status
- Application approved
- Decision
- Approved
- Received
- 15 Jun 2021
- Validated
- 6 Jul 2021
- Decided
- 31 Aug 2021
- Ward
- Maldon North
- Parish
- Maldon North
- Decision by
- Delegated
- Postcode
- CM9 6DY
Timeline
Dates from the published record
-
15 Jun 2021
Received by Maldon
-
6 Jul 2021
Validated
Checked as complete and ready for consideration.
-
31 Aug 2021
Decision issued: Approved
-
30 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
21 Mount Pleasant Maldon Essex CM9 6EQ
(TPO 05/24) T1 - Norway Maple - Crown reduction by 3.33m and crown thin by 20%.
Granted Trees 11 docs -
16 Spital Road Maldon Essex CM9 6EB
81% historically approved · decision due ~10 Jul
Single storey rear extension.
Decided ExtensionSmall domestic -
18 Spital Road Maldon Essex CM9 6EB
Single storey rear extension and internal alterations.
Granted Householder Extension 12 docsSmall domestic -
20 Spital Road Maldon Essex CM9 6EB
Proposed single storey rear and side extension. Alterations to fenestration including the addition of roof lights.
Granted Householder Extension Loft or dormer +1 12 docsSmall domestic -
St Peters Court Spital Road Maldon Essex CM9 6LF
Proposed replacement Outbuilding within Sensory Garden of St Peters Court Nursing Home and Replacement of Fence with new Brick wall.
Granted Full applicationsSmall domestic -
St Peters Court Spital Road Maldon Essex CM9 6LF
Removal of condition 23/00495/FUL (Refurbishment and first floor extension to Nursing Home, including 12 no. new bedrooms, alterations to car park and associated landscaping) Condition 2 - Plans
Granted Amendments Extension 19 docs
Other full applications applications
In Maldon
-
25/00972/FUL Granted
Agricultural Building At Oak Nursery Hackmans Lane Purleigh Essex
Demolition of existing glasshouses and erection of new dwelling and associated parking area
-
26/00314/FUL Granted
69 East Street Tollesbury Maldon Essex CM9 8QE
Proposed change of use from an office to a children residential home C2 to accommodate 3 children and a live in carer.
-
26/00565/FUL Awaiting decision
Cobbs Farm Maldon Road Goldhanger Maldon Essex CM9 8BQ
Construction of an additional livestock building for the housing of pigs at Cobbs Farm, and the construction of relating ancillary works.
-
25/00997/FUL Refused
Land Adjacent To Oak Corner Cottage Southend Road Woodham Mortimer Essex
Erection of a new self-build dwelling and associated works
-
25/00809/FUL Refused
Land At Oxley House Tiptree Colchester Essex
New barn building for apiculture associated with adjoining meadowland