Skip to content
PlanIndex Get alerts
Menu

Planning application

Land East Of Gleamingwood Drive Lordswood Kent

Awaiting decision Maidstone 26/503121/FULL Full applications

Works: New dwelling Windows or glazing Major scheme

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Section 73 - Application for minor material amendment to approved plans condition 1 (to allow alterations to elevations, windows and doors, changes to the layout of plots 17 to 89, and removal of the remaining unbuilt carports) pursuant to 18/505455/REM for - Approval of Reserved Matters for Access, Appearance, Landscaping, Layout, and Scale, pursuant of 15/503359/OUT - Outline application with all matters reserved for residential development (approx 89 dwellings) plus open space, biomass plant and access road (plus emergency access).

As published by the council, reference 26/503121/FULL

Application record

Reference
26/503121/FULL
Category
Full applications
Status
Awaiting decision
Validated
25 Aug 2026
Ward
Boxley Downs
Parish
Boxley
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 25 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  2. 3 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 20 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Maidstone took a median of 56 days over the applications it decided in the last year.

Cases linked to this one on the register

  • Application: 18/505455/REM (Decided)

Who's behind it

Company information only, from the register and Companies House

Tetlow King Planning Ltd Agent, a planning consultancy registered in Staple Hill

Active · incorporated 1987 · Staple Hill

39 applications on PlanIndex · across 24 councils · 74% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Palm Developments Ltd Applicant, a developer registered in Rochester

Active · incorporated 1995 · Rochester

2 applications on PlanIndex · across 2 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

19 documents on file for this application

  • ApplicationFormRedacted Application Details · 25 Aug 2026
  • Plot 21 & 22 Floor Plans and Elevations Plan / Drawing · 21 Aug 2026
  • Plot 50 & 51 Floor Plans and Elevations Plan / Drawing · 12 Aug 2026
  • Plot 81 & 89 Floor Plans and Elevations Plan / Drawing · 12 Aug 2026
  • Plot 23 & 24 Floor Plans and Elevations Plan / Drawing · 12 Aug 2026
  • Plots 27 & 28 Floor Plans and Elevations Plan / Drawing · 12 Aug 2026
  • Plot 29 & 30, 31 & 32, 33 & 34, 35 & 36 Floor Plans and Elevations Plan / Drawing · 12 Aug 2026
  • Plot 40 & 41 Floor Plans and Elevations Plan / Drawing · 12 Aug 2026
  • Plot 42 & 43 Floor Plans and Elevations Plan / Drawing · 12 Aug 2026
  • Plot 48 & 49 Floor Plans and Elevations Plan / Drawing · 12 Aug 2026
  • Plots 52 & 53 Floor Plans and Elevations Plan / Drawing · 12 Aug 2026
  • Plots 54 & 55 Floor Plans and Elevations Plan / Drawing · 12 Aug 2026
  • Plot 68 & 69 Floor Plans and Elevations Plan / Drawing · 12 Aug 2026
  • Plots 72 & 73 Floor Plans and Elevations Plan / Drawing · 12 Aug 2026
  • Plot 80 Floor Plans and Elevations Plan / Drawing · 12 Aug 2026
  • Plot 83 Floor Plans and Elevations Plan / Drawing · 12 Aug 2026
  • Proposed Site Location Plan Plan / Drawing · 12 Aug 2026
  • Variation of Condition Supporting Documents · 12 Aug 2026
  • CIL Form 1 Section 106 / CIL Document · 12 Aug 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Maidstone for determination, against a statutory target of eight weeks. Over the last year Maidstone decided full applications in a median of 56 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Maidstone

  • 26/500859/FULL Decided

    Vine Farm Barn Waterman Quarters Headcorn Kent TN27 9JJ

    Erection of two single storey side extensions and front porch.

    15 Sep 2026 Full applications
  • 26/503465/FULL Awaiting decision

    Mote Hall Church Lane Bearsted Kent ME14 4EE

    Refurbishment and replacement of windows and external doors to southwest and southeast elevations. Removal of existing soil vent pipe and associated drainage services along the front elevation and replacement of boundary fence.

    Full applications
  • 26/503493/FULL Awaiting decision

    Land At Mullions Place Linton Hill Linton Kent ME17 4AP

    Change of use of land to tree storage yard in association with Arboriculture business, including construction of access road, concrete slab and security fence and gates (resubmission of 25/503670/FULL).

    Full applications
  • 26/503401/FULL Awaiting decision

    Land Adjacent To Montague Cottage Chartway Street Sutton Valence Kent ME17 3JA

    Demolition of shed and erection of a 4 bedroom dwelling house with the provision of 3no. parking spaces, 3no. cycle spaces, a dropped kerb and associated hard and soft landscaping.

    Full applications
  • 26/503405/FULL Awaiting decision

    The Orchards North Pole Road Teston Kent ME18 5FB

    Change Of Use Of Agricultural Storage Barn Into A Holiday Let Unit

    Full applications