Skip to content
PlanIndex Get alerts
Menu

Planning application

Power Court Luton Bedfordshire

Awaiting decision Luton 26/00395/DOC Discharge of Multiple Conditions

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Hybrid application for a mixed-use development comprising: Full details for a new stadium, with ancillary stadium-related facilities including spectator and media facilities, conference rooms, food and beverage facilities and commercial space, community facilities, works to the River Lea, associated access, highways, utilities, public realm including flexible open space for various uses and events, hard and soft landscaping, coach and car parking facilities and other associated works. Outline application for a music venue and hotel and associated works, with interim use of the podium for the music venue as a fan zone and all matters reserved except for siting (EIA Development). Discharge of conditions 60 (Surface water drainage ), 63 (Interim and temporary drainage measures) and 64 (Construction phase surface water management plan) of Planning Permission 24/01075/HYBEIA dated 23rd December 2025.

As published by the council, reference 26/00395/DOC

Application record

Reference
26/00395/DOC
Type
Discharge of Multiple Conditions
Status
Awaiting decision
Received
16 Apr 2026
Validated
16 Apr 2026
Ward
SOUTH
Decision by
Delegated Decision

Site history

Applications at this address on the Luton register

This site has had 8 applications since 2026: 4 approved, 0 refused.

  • 26/00882/DOC Awaiting decision

    Power Court Luton Bedfordshire

    Hybrid application for a mixed-use development comprising: Full details for a new stadium, with ancillary stadium-related facilities including spectator and media facilities, conference rooms, food and beverage facilities and commercial space, community facilities, works to the River Lea, associated access, highways, utilities, public realm including flexible open space for various uses and events, hard and soft landscaping, coach and car parking facilities and other associated works. Outline application for a music venue and hotel and associated works, with interim use of the podium for the music venue as a fan zone and all matters reserved except for siting (EIA Development). Discharge of condition 65 (Detailed Hydraulic Modelling) and 68 (Detailed design surface water flow path) of Planning permission 24/01075/HYBEIA dated 23 December 2025.

    Submitted 19 Aug 2026 Conditions
  • 26/00611/REM Decided

    Power Court Luton Bedfordshire

    Outline proposals, with all matters reserved except for access, for a mixed-use development comprising: residential floorspace; appropriate town centre uses including a health centre, retail, community uses, food and drinking establishments; car and cycle parking; and associated access, highways, utilities, public realm, landscaping, riverworks and associated ancillary works and structures. Approval of all Reserved Matters for Phase 3 of planning permission 20/01587/OUTEIA

    Submitted 9 Jun 2026 Reserved matters
  • 26/00610/DOC Decided

    Power Court Luton Bedfordshire

    Outline proposals, with all matters reserved except for access, for a mixed-use development comprising: residential floorspace; appropriate town centre uses including a health centre, retail, community uses, food and drinking establishments; car and cycle parking; and associated access, highways, utilities, public realm, landscaping, riverworks and associated ancillary works and structures. Discharge of condition 3 (Masterplan) of Planning permission 20/01587/OUTEIA dated 1 September 2022.

    Submitted 9 Jun 2026 Conditions
  • 26/00482/REM Granted

    Power Court Luton Bedfordshire

    Outline proposals, with all matters reserved except for access, for a mixed-use development comprising: residential floorspace; appropriate town centre uses including a health centre, retail, community uses, food and drinking establishments; car and cycle parking; and associated access, highways, utilities, public realm, landscaping, riverworks and associated ancillary works and structures - Approval of Reserved Matters relating to all Matters Reserved relating to Access, Appearance, Landscaping, Layout and Scale in respect of Phase 2, following outline approval of Application No. 20/01587/OUTEIA dated 1st September 2022.

    Decided 4 Aug 2026 Reserved matters
  • 26/00483/DOC Granted

    Power Court Luton Bedfordshire

    Outline proposals, with all matters reserved except for access, for a mixed-use development comprising: residential floorspace; appropriate town centre uses including a health centre, retail, community uses, food and drinking establishments; car and cycle parking; and associated access, highways, utilities, public realm, landscaping, riverworks and associated ancillary works and structures. Discharge of condition 3 (Masterplan) of Planning permission 20/01587/OUTEIA dated 1 September 2022.

    Decided 30 Jul 2026 Conditions
  • 26/00394/DOC Granted

    Power Court Luton Bedfordshire

    Hybrid application for a mixed-use development comprising: Full details for a new stadium, with ancillary stadium-related facilities including spectator and media facilities, conference rooms, food and beverage facilities and commercial space, community facilities, works to the River Lea, associated access, highways, utilities, public realm including flexible open space for various uses and events, hard and soft landscaping, coach and car parking facilities and other associated works. Outline application for a music venue and hotel and associated works, with interim use of the podium for the music venue as a fan zone and all matters reserved except for siting (EIA Development). Discharge of conditions 28 (Materials), 30 (Hard and soft landscaping), 31 (Landscape management plan), 32 (Landscape Implementation) and 51 (Public realm works) of Planning Permission 24/01075/HYBEIA dated 23rd December 2025.

    Decided 20 Jul 2026 Conditions
  • 26/00393/AMEND Granted

    Power Court Luton Bedfordshire

    Hybrid application for a mixed-use development comprising: Full details for a new stadium, with ancillary stadium-related facilities including spectator and media facilities, conference rooms, food and beverage facilities and commercial space, community facilities, works to the River Lea, associated access, highways, utilities, public realm including flexible open space for various uses and events, hard and soft landscaping, coach and car parking facilities and other associated works. Outline application for a music venue and hotel and associated works, with interim use of the podium for the music venue as a fan zone and all matters reserved except for siting (EIA Development). Non material amendment of planning permission 24/01075/HYBEIA dated 23rd December 2025. (amend wording of conditions 19, 28, 30, 33, 34, 37, 59, 60, 61 and 65.)

    Decided 16 Jul 2026 Amendments

Timeline

Dates from the published record

  1. 16 Apr 2026

    Received by Luton

  2. 23 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 11 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Luton took a median of 73 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

2020 Developments (Luton) Ltd Applicant, a developer registered in Luton

Active · incorporated 2015 · Luton

6 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

  • SUDS - Lead Local Flood Authority comments Comment - Consultee · 28 May 2026
  • ENVIRONMENTAL PROTECTION Comment - Consultee · 11 May 2026
  • APPLICATION FORM Application Form · 16 Apr 2026
  • LTFC-AKT-WS-RP-CE-000001 STAGE 4BWEST STAND DRAINAGE DESIGN STATEMENT Current Docs · 16 Apr 2026
  • DC02 METHOD STATEMENT FOR GROUNDWORKS Current Docs · 16 Apr 2026
  • DC01 CONSTRUCTION PHASE SURFACE WATER MANAGEMENT PLAN Current Docs · 16 Apr 2026
  • 2076-01-CIV-XX-XX-D-C-30010 PROPOSED DRAINAGE LAYOUT STADIUM AND HOTEL DRAINAGE Current Docs · 16 Apr 2026
  • DC03 COVERING LETTER Current Docs · 16 Apr 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Luton for determination, against a statutory target of eight weeks. Over the last year Luton decided condition discharge and variation applications in a median of 70 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

In Luton

  • 26/01072/DOC Awaiting decision

    27 - 29 Hillborough Road Luton LU1 5EY

    Erection of a two bedroom attached dwelling house. Discharge of conditions 3 (Construction Method Statement), 5 (Habitat Management and Monitoring Plan), 6 (Materials), 7 (Surfacing and Drainage of Hardstanding), 8 (Hard and Soft Landscaping) and 9 (Boundary Treatment) of Planning permission 26/00036/FUL dated 10 September 2026.

    Received 19 Oct, published by the council 23 Oct 2026 Conditions
  • 26/01068/DOC Awaiting decision

    20 Barton Road Luton LU3 2BB

    Remodelling and refurbishment of existing dwelling and erection of two storey front and rear extension and additional 2nd floor in roof space to form front/rear dormer with side rooflights to facilitate loft conversion. Discharge of condition 3 (External Materials) of Planning permission 25/00726/FULHH dated 17 September 2025.

    Received 16 Oct, published by the council 23 Oct 2026 Conditions
  • 26/01066/DOC Awaiting decision

    2-4 Seymour Avenue Luton LU1 3NR

    Demolition of existing dwelling No. 4 Seymour Avenue and existing garage block to the west of the site and the erection of two and half storey building to provide 3 flats (2 x 2 bed and 1 x1 bed) with associated amenity space and surface parking area. Discharge of conditions 12 (Contamination) and 13 (Verification Report) of Planning permission 25/00548/FUL dated 21 November 2025.

    Received 16 Oct, published by the council 23 Oct 2026 Conditions
  • 26/01049/DOC Awaiting decision

    I B C Vehicles Ltd Kimpton Road Luton LU2 0JX

    Outline Planning Application for demolition of the existing buildings and redevelopment for a mix of new industrial, storage and distribution uses (Classes E(g)(iii), B2 and B8) and cafe (Class E). To include access from Kimpton Road and Vauxhall Way, servicing, parking, landscaping and associated works. Discharge of condition 14 (Remediation Strategy) and 16 (Verification Report) of Planning permission 26/00064/OUTEIA dated 6 October 2026.

    Received 13 Oct, published by the council 21 Oct 2026 Conditions
  • 26/01050/DOC Awaiting decision

    I B C Vehicles Ltd Kimpton Road Luton LU2 0JX

    Outline Planning Application for demolition of the existing buildings and redevelopment for a mix of new industrial, storage and distribution uses (Classes E(g)(iii), B2 and B8) and cafe (Class E). To include access from Kimpton Road and Vauxhall Way, servicing, parking, landscaping and associated works. Discharge of condition 8 (Contamination) and 13 (Substance Storage Strategy Report) of Planning permission 26/00064/OUTEIA dated 6 October 2026.

    Received 13 Oct, published by the council 21 Oct 2026 Conditions