Proposal
Full planning permission for the construction of approximately 2.2km twin guideways mass passenger transit (MPT) system comprising track bed between Luton Airport Parkway Station and Luton Airport Central Terminal together with related structures/engineering operations including new service roads, storm retention tanks, a viaduct along the railway, a bridge over the A1081 (Airport Way) road, slab in a cut or on embankment, a trough and a tunnel; a new two storey MPT station adjacent to Luton Airport Parkway Station to include ancillary retail (A1) outlets and a new Central Terminal MPT Station; five temporary construction compounds; and Outline planning permission for an over-bridge link and extended station concourse from the existing Luton Airport Parkway Station to the new two storey MPT Luton Parkway Station (all matters reserved). Discharge of conditions 17 (verification Report) and 18 (contamination not previously identified, remediation strategy) of planning permission 17/00283/FUL dated 30th June 2017.
As published by the council, reference 21/01354/DOC
Application record
- Reference
- 21/01354/DOC
- Type
- Discharge of Multiple Conditions
- Status
- Awaiting decision
- Received
- 30 Sep 2021
- Validated
- 30 Sep 2021
- Ward
- VAUXHALL
- Decision by
- Delegated Decision
- Postcode
- LU2 0SX
Site history
Applications at this address on the Luton register
This site has had 3 applications since 2021: 2 approved, 0 refused.
-
22/00839/AMEND Granted
MPT Parkway Station Luton Bedfordshire LU2 0SX
Full planning permission for the construction of approximately 2.2km twin guideways mass passenger transit (MPT) system comprising track bed between Luton Airport Parkway Station and Luton Airport Central Terminal together with related structures/engineering operations including new service roads, storm retention tanks, a viaduct along the railway, a bridge over the A1081 (Airport Way) road, slab in a cut or on embankment, a trough and a tunnel; a new two storey MPT station adjacent to Luton Airport Parkway Station to include ancillary retail (A1) outlets and a new Central Terminal MPT Station; five temporary construction compounds; and Outline planning permission for an over-bridge link and extended station concourse from the existing Luton Airport Parkway Station to the new two storey MPT Luton Parkway Station (all matters reserved). Non-Material amendment of planning permission 17/00283/FUL dated 30 June 2017. (New office and relocate bin store and new gate)
-
21/01153/AMEND Granted
MPT Parkway Station Luton Bedfordshire LU2 0SX
Full planning permission for the construction of approximately 2.2km twin guideways mass passenger transit (MPT) system comprising track bed between Luton Airport Parkway Station and Luton Airport Central Terminal together with related structures/engineering operations including new service roads, storm retention tanks, a viaduct along the railway, a bridge over the A1081 (Airport Way) road, slab in a cut or on embankment, a trough and a tunnel; a new two storey MPT station adjacent to Luton Airport Parkway Station to include ancillary retail (A1) outlets and a new Central Terminal MPT Station; five temporary construction compounds; and Outline planning permission for an over-bridge link and extended station concourse from the existing Luton Airport Parkway Station to the new two storey MPT Luton Parkway Station (all matters reserved). Non - Material Amendment of planning permission 17/00283/FUL dated 7th July 2017. (This application is to retain as permanent, a modification to the taxi way as shown on drawings C12768-RPS-TWY-TU-DR-C-4122 Rev P2, and AGT/AGL/LTN/221 rev A).
Timeline
Dates from the published record
-
30 Sep 2021
Received by Luton
-
9 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 25 November 2021, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Luton took a median of 73 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
- Application: 17/00283/FUL (PER - Application Permitted)
Documents
Plans, drawings, consultee responses and the officer's report
21 documents on file for this application
- Environment Agency
- ENVIRONMENTAL PROTECTION
- APPLICATION FORM
- C12768-VFK-ELS-XX-CRP-W-0002-C01-PART 1 - REMEDIATION VERIFICATION REPORT
- C12768-VFK-ELS-XX-CRP-W-0002-C01-PART 2 - REMEDIATION VERIFICATION REPORT
- C12768-VFK-ELS-XX-CRP-W-0002-C01-PART 3 - REMEDIATION VERIFICATION REPORT
- C12768-VFK-ELS-XX-CRP-W-0002-C01-PART 4 - REMEDIATION VERIFICATION REPORT
- C12768-VFK-ELS-XX-CRP-W-0002-C01-PART 5 - REMEDIATION VERIFICATION REPORT
- C12768-VFK-ELS-XX-CRP-W-0002-C01-PART 6 - REMEDIATION VERIFICATION REPORT
- C12768-VFK-ELS-XX-CRP-W-0002-C01-PART 7 - REMEDIATION VERIFICATION REPORT
- C12768-VFK-ELS-XX-CRP-W-0002-C01-PART 8 - REMEDIATION VERIFICATION REPORT
- C12768-VFK-ELS-XX-CRP-W-0002-C01-PART 9 - REMEDIATION VERIFICATION REPORT
- C12768-VFK-ELS-XX-CRP-W-0002-C01-PART 10 - REMEDIATION VERIFICATION REPORT
- C12768-VFK-ELS-XX-CRP-W-0002-C01-PART 11 - REMEDIATION VERIFICATION REPORT
- C12768-VFK-ELS-XX-CRP-W-0002-C01-PART 12 - REMEDIATION VERIFICATION REPORT
- C12768-VFK-ELS-XX-CRP-W-0002-C01-PART 13 - REMEDIATION VERIFICATION REPORT
- C12768-VFK-ELS-XX-CRP-W-0002-C01-PART 14 - REMEDIATION VERIFICATION REPORT
- C12768-VFK-ELS-XX-CRP-W-0002-C01-PART 15 - REMEDIATION VERIFICATION REPORT
- C12768-VFK-ELS-XX-CRP-W-0002-C01-PART 16 - REMEDIATION VERIFICATION REPORT
- C12768-VFK-ELS-XX-CRP-W-0002-C01-PART 17 - REMEDIATION VERIFICATION REPORT
- C12768-VFK-ELS-XX-CRP-W-0002-C01-PART 18 - REMEDIATION VERIFICATION REPORT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Luton for determination, against a statutory target of eight weeks. Over the last year Luton decided condition discharge and variation applications in a median of 70 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
MPT Parkway Station Luton Bedfordshire LU2 0SX
Full planning permission for the construction of approximately 2.2km twin guideways mass passenger transit (MPT) system comprising track bed between Luton Airport Parkway Station and Luton Airport Central Terminal together with related structures/engineering operations including new service roads, storm retention tanks, a viaduct along the railway, a bridge over the A1081 (Airport Way) road, slab in a cut or on embankment, a trough and a tunnel; a new two storey MPT station adjacent to Luton Airport Parkway Station to include ancillary retail (A1) outlets and a new Central Terminal MPT Station; five temporary construction compounds; and Outline planning permission for an over-bridge link and extended station concourse from the existing Luton Airport Parkway Station to the new two storey MPT Luton Parkway Station (all matters reserved). Non-Material amendment of planning permission 17/00283/FUL dated 30 June 2017. (New office and relocate bin store and new gate)
Granted Amendments 15 docs -
MPT Parkway Station Luton Bedfordshire LU2 0SX
Full planning permission for the construction of approximately 2.2km twin guideways mass passenger transit (MPT) system comprising track bed between Luton Airport Parkway Station and Luton Airport Central Terminal together with related structures/engineering operations including new service roads, storm retention tanks, a viaduct along the railway, a bridge over the A1081 (Airport Way) road, slab in a cut or on embankment, a trough and a tunnel; a new two storey MPT station adjacent to Luton Airport Parkway Station to include ancillary retail (A1) outlets and a new Central Terminal MPT Station; five temporary construction compounds; and Outline planning permission for an over-bridge link and extended station concourse from the existing Luton Airport Parkway Station to the new two storey MPT Luton Parkway Station (all matters reserved). Non - Material Amendment of planning permission 17/00283/FUL dated 7th July 2017. (This application is to retain as permanent, a modification to the taxi way as shown on drawings C12768-RPS-TWY-TU-DR-C-4122 Rev P2, and AGT/AGL/LTN/221 rev A).
Granted Amendments 7 docs -
Holiday Inn London-Luton Airport Airport Way Luton LU2 9LF
96% historically approved · decision due ~5 May
Erection of a four storey extension to the existing hotel building, external facade alterations, and other associated works at Airport Way. Discharge of condition 3 (Construction Environmental Management Plan) and 5 (Materials) of Planning permission 25/00185/FUL dated 17th December 2025.
Decided Conditions Extension 17 docs -
Preservation House Airport Way Luton LU2 9NP
Display of an internally illuminated fascia sign
Granted Advertising 9 docs -
Prudence Place & Charlottes Court Proctor Way Luton LU2 9PE
Erection of a third floor and external alterations to Charlottes Court along with the erection of a two storey front extension with dormer and external alterations to Prudence Place to provide an additional 2 x two bed flats. Discharge of condition 5 (Construction & Environmental Method Statement) of planning permission 20/01401/FUL dated 17th December 2020. Resubmission
Granted Conditions New dwelling Extension +1 4 docs -
Prudence Place & Charlottes Court Proctor Way Luton LU2 9PE
Erection of a third floor and external alterations to Charlottes Court along with the erection of a two storey front extension with dormer and external alterations to Prudence Place to provide an additional 2 x two bed flats. Discharge of condition 5 (Construction & Environmental Method Statement) of planning permission 20/01401/FUL dated 17th December 2020
Refused Conditions New dwelling Extension +1 5 docs
Other condition discharge and variation applications
In Luton
-
26/01072/DOC Awaiting decision
27 - 29 Hillborough Road Luton LU1 5EY
Erection of a two bedroom attached dwelling house. Discharge of conditions 3 (Construction Method Statement), 5 (Habitat Management and Monitoring Plan), 6 (Materials), 7 (Surfacing and Drainage of Hardstanding), 8 (Hard and Soft Landscaping) and 9 (Boundary Treatment) of Planning permission 26/00036/FUL dated 10 September 2026.
-
26/01068/DOC Awaiting decision
20 Barton Road Luton LU3 2BB
Remodelling and refurbishment of existing dwelling and erection of two storey front and rear extension and additional 2nd floor in roof space to form front/rear dormer with side rooflights to facilitate loft conversion. Discharge of condition 3 (External Materials) of Planning permission 25/00726/FULHH dated 17 September 2025.
-
26/01066/DOC Awaiting decision
2-4 Seymour Avenue Luton LU1 3NR
Demolition of existing dwelling No. 4 Seymour Avenue and existing garage block to the west of the site and the erection of two and half storey building to provide 3 flats (2 x 2 bed and 1 x1 bed) with associated amenity space and surface parking area. Discharge of conditions 12 (Contamination) and 13 (Verification Report) of Planning permission 25/00548/FUL dated 21 November 2025.
-
26/01049/DOC Awaiting decision
I B C Vehicles Ltd Kimpton Road Luton LU2 0JX
Outline Planning Application for demolition of the existing buildings and redevelopment for a mix of new industrial, storage and distribution uses (Classes E(g)(iii), B2 and B8) and cafe (Class E). To include access from Kimpton Road and Vauxhall Way, servicing, parking, landscaping and associated works. Discharge of condition 14 (Remediation Strategy) and 16 (Verification Report) of Planning permission 26/00064/OUTEIA dated 6 October 2026.
-
26/01050/DOC Awaiting decision
I B C Vehicles Ltd Kimpton Road Luton LU2 0JX
Outline Planning Application for demolition of the existing buildings and redevelopment for a mix of new industrial, storage and distribution uses (Classes E(g)(iii), B2 and B8) and cafe (Class E). To include access from Kimpton Road and Vauxhall Way, servicing, parking, landscaping and associated works. Discharge of condition 8 (Contamination) and 13 (Substance Storage Strategy Report) of Planning permission 26/00064/OUTEIA dated 6 October 2026.