Skip to content
PlanIndex Get alerts
Menu

Planning application

Mcculla (Ireland) Ltd, Unit 5 Blaris Industrial Estate, Altona Road, Lisburn, BT27 5QB

Awaiting decision Lisburn and Castlereagh LA05/2026/0639/F Full

Works: Extension

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Proposed increase in eaves height and extension of existing cold store to include marshalling area and forklift charging, recladding of existing building, proposed refrigeration plant and fencing

As published by the council, reference LA05/2026/0639/F

Application record

Reference
LA05/2026/0639/F
Type
Full
Status
Consultation Open
Received
24 Jul 2026
Validated
6 Aug 2026
Ward
Blaris
Postcode
BT27 5QB

Timeline

Dates from the published record

  1. 24 Jul 2026

    Received by Lisburn and Castlereagh

  2. 6 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 14 Aug 2026

    Added to PlanIndex

  4. 27 Aug 2026

    Status changed to Consultation Open

    Previously Valid.

  5. Decision

    Awaiting decision

    Decision expected by 1 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Lisburn and Castlereagh took a median of 93 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

26 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Lisburn and Castlereagh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Unit 5 Altona Road, Blaris Industrial Estate, Lisburn, BT27 5QB

    LA05/2024/0368/F Submitted 2 May 2024 55m away

    Proposed extension to existing cold storage unit (comprising increase in ridge and eaves height from previously approved LA05/2020/1045/F) and ridge and eaves height increase to part of existing cold storage unit

    Granted Full applications Extension 25 docs
  • 110 Hillsborough Old Road, Lisburn, BT27 5QE

    LA05/2026/0472/F Submitted 29 May 2026 137m away

    Single storey extension to side and front porch

    Granted Full applications Extension 8 docs
    Small domestic
  • Lands adjacent to and north west of 11 Edgehill Park, Lisburn

    LA05/2024/0664/NMC Submitted 13 Sep 2024 252m away

    Sunroom added and gable bay window omitted on Site 8 (House Type A1)

    Refused Amendments Windows or glazing 8 docs
    Several homes
  • Lands adjacent to and north west of 11 Edgehill Park, Lisburn

    LA05/2024/0519/DC Submitted 5 Jul 2024 252m away

    Validation Report to Discharge Conditions 10 and 17 of Planning approval: LA05/2020/0429/F

    Decided Conditions 9 docs
  • 49-51 Hillsborough Old Road, Lisburn, BT27 5EW

    LA05/2023/0763/DC Submitted 22 Sep 2023 265m away

    Discharge of Condition 21 relating to planning approval LA05/2021/0067/F- submission of a Construction Method Statement

    Decided Conditions 8 docs
  • Unit 4, 24 Altona Road, Lisburn, BT27 5QB

    LA05/2025/0105/F Submitted 27 Jan 2025 408m away

    Change of use from warehouse and ancillary offices to recreational use complete with swimming pool and ancillary accommodation. Internal alterations to layout, external facade to remain unaltered.

    Granted Full applications 34 docs

In Lisburn and Castlereagh

  • LA05/2026/0693/F Awaiting decision

    161 Dromore Road, Hillsborough, BT26 6JA

    Alterations to existing Diner (161) and Service Station Shop (163) involving Internal refits to both buildings to accommodate new franchisees. External alterations to both buildings including alterations to existing entrances, formation of a new entrance to No163, addition of feature panelling external wall treatment to both buildings, construction of an access ramp and complimentary steps to No 161.

    31 Aug 2026 Full applications
  • Lands opposite Nos. 41 - 45, 60 - 67 & 72 - 75 Ballantine Gardens, Lisburn, BT27 5FB

    Proposed amendments to planning permission S/2011/0383/F including the conversion of approved first floor domestic storage areas into two apartments, additional parking, bin store and ancillary site works

    10 Dec 2025 Full applications
  • 12 Lurganville Road, Moira, Craigavon, BT67 0PJ

    Proposed new access to existing dwelling at 12A in lieu of shared access (use of shared access to laneway to 12A to cease)

    7 Jul 2026 Full applications
  • 37 Fairfields Manor, Magheralave, Lisburn, BT28 3WA

    Attic conversion with new rear flat roof dormer

    3 Jul 2026 Full applications
  • Land approximately 50 meters south of 240 Comber Rd, Dundonald, Belfast BT16 2BS

    Wastewater Pumping Station (WwPS) including chambers and associated sewers below ground level and a Motor Control Centre (MCC) Kiosk building, telemetry and lighting columns. Other works include associated site and access works.

    10 Apr 2025 Full applications