Planning application
Land opposite 41 & 43 Pinehill Road, Lisburn
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge of Conditions 1 and 2 of Planning Application LA05/2016/1140/F (Appeal Reference 2019/A0060) (1) No other development shall take place until the site access and visibility splays as shown on approved drawing numbered PCA1, stamped received by the Commission on 15 October 2019 are carried out in full. The visibility splays shall be permanently retained thereafter. (2) The access gradient to the dwelling hereby permitted shall not excess 8% (1 in 12.5) over the first 5m outside the road boundary. Where the vehicular access crosses the verge, the gradient shall be between 4% (1 in 25) maximum and 2.5% (1 in 40) minimum and shall be formed so that there is no abrupt changes of slope along the verge
As published by the council, reference LA05/2026/0296/DC
Application record
- Reference
- LA05/2026/0296/DC
- Type
- Discharge of Condition
- Status
- Under Consideration
- Decision
- Granted As published: Condition Discharged
- Received
- 17 Apr 2026
- Validated
- 17 Apr 2026
- Ward
- Drumbo
Timeline
Dates from the published record
-
17 Apr 2026
Received by Lisburn and Castlereagh
-
29 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Lisburn and Castlereagh granted permission, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
19 Pinehill Road, Drumbo, Lisburn, BT27 5TU
97% historically approved · decision due ~3 Nov
Rear dormer extension and alterations to existing dwelling
Awaiting decision Full applications Extension Loft or dormer 10 docsDomestic
Other condition discharge and variation applications
In Lisburn and Castlereagh
-
LA05/2025/0763/DC Granted
New build site is located approximately 40m west of 34 Rock Road (provisionally designated as No.35).
Request for Discharge of Conditions 2 and 3 listed within Approval of Reserved Matters application no. LA05/2023/0277/RM as works have now been carried out. Scaled site plan and photographs have been provided as part of this application.
-
LA05/2026/0423/DC Granted
Lands approx 160m east of 39 Fairfield’s Glen, BT28 3SE, lands approx 114m south east of 50-58 (even no’s) Fairfield’s Glen
Discharge of condition 2 of planning approval LA05/2025/0635/F- details of previous approval and evidence of sight lines installed
-
LA05/2026/0765/DC Awaiting decision
Lands approximately 500 metres west of 37 Colinglen Road, Dunmurry, Belfast, BT17 0LP
Discharge of Condition 9 of LA05/2023/0149/F: Bat Mitigation and Monitoring Plan (BMMP)
-
LA05/2026/0770/DC Awaiting decision
Lands 300m to the south east of 206 Millmount Road Dundonald BT16 1UT and 1-8 Millmount Chase Dundonald BT16 1WL
Conditions 23 and 26: Verification Report (Plots 21,22,24,25,26).
-
LA05/2026/0744/DC Awaiting decision
Existing Millars Lane Wastewater Pumping Station (WwPS) at Millars Lane, Dundonald
(4) No site works of any nature or development shall take place until a programme of archaeological work has been prepared by a qualified archaeologist, submitted by the applicant and approved in writing by Lisburn and Castlereagh City Council in consultation with Historic Environment Division, Department for Communities. The POW shall provide for: • The identification and evaluation of archaeological remains within the site; • Mitigation of the impacts of development through licensed excavation recording or by preservation of remains in-situ; • Post-excavation analysis sufficient to prepare an archaeological report, to publication standard if necessary; and • Preparation of the digital, documentary and material archive for deposition.