Skip to content
PlanIndex Get alerts
Menu

Planning application

LA05/2026/0236/F

Lands adjacent and south of No. 17 Ferguson Drive, Lisburn, BT28 2EX

Granted Lisburn and Castlereagh Full

Proposal

Proposed erection of a temporary (3 years) storage/ light assembly building associated with adjacent and established business

As published by the council, reference LA05/2026/0236/F

Timeline

Dates from the published record

  1. 23 Mar 2026

    Received by Lisburn and Castlereagh

  2. 24 Mar 2026

    Validated

    Checked as complete and ready for consideration.

  3. 29 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • LA05/2026/0057/NMC Awaiting decision

    Land east of Knockmore Road, south of nos. 68-80 Addison Park and nos. 8-10 Knockmore Road and North of Flush Park, Lisburn

    Non Material Change to planning approval S/2014/0884/F: Platform 1 (new development side) to move 15m towards Lisburn (needed to futureproof any works to reopen the Antrim to Knockmore Junction branch line); Extension of platforms (island platform and single platform) on Lisburn side by approximately 5m (212m to 217m) to comply with recommended train stopping distances; Revision to bus layout to provide drop off closer to the footbridge and platform access, improving the customer experience and passenger flow; Pedestrian access steps from Knockmore Road, repositioned further north to tie in with revisions to bus layout; Wider platforms, required for compliance with fire evacuation standards – approved single platform is 3.1m and proposed 3.5m; approved island platform is 6m and proposed is 8.25m at each end, tapering to 7m; Wider access steps, required for fire evacuation; Removal of office space on footbridge - no longer required; Connection to the access ramp to Moira Road development, approved as part of adjacent planning permission ref. LA05/2022/0830/F; Perimeter fencing (towards north-east of car park), approved and conditioned as temporary noise attenuation but proposing to make this permanent; Revised track layout geometry and platform locations to comply with standards associated with line speed, fire evacuation and future proof Antrim to Knockmore branch line development; and Canopies – amended in line with fire requirements (width has increased and location on single platform to as to retain 3.5m width)

    21 Jan 2026 185m away Amendments
  • LA05/2026/0482/DC Awaiting decision

    Land east of Knockmore Road, south of nos. 68-80 Addison Park and nos. 8-10 Knockmore Road and North of Flush Park, Lisburn

    Submisison of main works CMEP and Noise and Vibration Assessment for formal discharge. Documents have been reviewed and signed off through PAD process, no further changes have been made. Programme remains as per version submitted and agreed under planning ref. LA05/2025/0254/DC.

    3 Jun 2026 200m away Conditions
  • Coca-Cola HBC Northern Ireland Ltd 12 Lissue Road, Lisburn, BT28 2SZ

    Retention of 2 Projecting signs

    9 Dec 2025 272m away Advertising
  • 172 Moira Road, Lisburn, BT28 1JA

    Single storey extension to the rear of the existing dwelling

    14 Jan 2026 367m away Full applications
  • 1 Hulls Avenue, Lisburn, BT28 2WZ

    Single storey extension to rear curtilage of existing property to include bedroom, bathroom and lobby. Existing first floor window to be altered to suit proposed roof

    27 May 2026 404m away Full applications
  • Coca-Cola HBC Northern Ireland Limited, 12 Lissue Road, Lisburn, BT28 2SZ

    Erection of single and two storey production and storage area extension to east elevation, including associated alterations to hardstandings

    16 Apr 2026 443m away Full applications

In Lisburn and Castlereagh

  • LA05/2026/0606/F Awaiting decision

    69 Wellington Park Drive, Lisburn, BT67 0UP

    Proposed rear/side extension to form family room

    24 Jul 2026 Full applications
  • 9 Islandkelly Park, Lisburn, BT28 3HB

    2 storey side extension and alteration to front garden to allow for parking (Amended plans)

    19 Mar 2026 Full applications
  • 52 Laverys Bridge Road, Craigavon, BT67 0PQ

    Erection of detached garage, conversion of existing garage to living accommodation and sun lounge extension to dwelling. (Renewal of extant permission)

    3 Mar 2026 Full applications
  • LA05/2026/0343/F Withdrawn

    Public Footpath approximately 80m south east of 1 Thornhill Manor, Dunmurry

    Proposed installation of telephone kiosk on public footpath

    29 Apr 2026 Full applications
  • LA05/2026/0598/F Awaiting decision

    13 Richmond Court, Lisburn, BT27 4QU

    Internal alterations and loft conversion which includes dormer extension to rear.

    20 Jul 2026 Full applications