Skip to content
PlanIndex Get alerts
Menu

Planning application

LA05/2026/0020/DC

Lands at 160 Moira Road, Lisburn.

Decided Lisburn and Castlereagh Discharge of Condition

Proposal

Discharge of Condition 26 of planning permission LA05/2024/0734/F- submission of a Vibration Impact Assessment

As published by the council, reference LA05/2026/0020/DC

Timeline

Dates from the published record

  1. 7 Jan 2026

    Received by Lisburn and Castlereagh

  2. 29 Apr 2026

    Decision issued: Condition Discharged

  3. 29 Jul 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • Lands at 160 Moira Road, Lisburn.

    Discharge of condition 13 previously approved application under LA05/2024/07345/F

    15 Apr 2026 0m away Conditions
  • Lands at 160 Moira Road, Lisburn.

    Discharge of Conditions 24 and 25 of planning application LA05/2024/0734/F: Remediation Validation Report prepared by RSK

    13 May 2026 0m away Conditions
  • Lands at 160 Moira Road, Lisburn

    Discharge of Condition 3.2- Commencement of development- Planning obligation under Section 76 of the Planning Act (Northern Ireland) 2011 relating to planning application LA05/2022/0830/F- re lands at Moira Road, Lisburn

    9 Sep 2025 0m away Conditions
  • Lands at 160 Moira Road, Lisburn.

    Discharge of Condition 9 of Planning Permission LA05/2024/0734/F- Submission of Landscape Phasing Plan

    7 Jan 2026 0m away Conditions
  • LA05/2026/0231/NMC Awaiting decision

    Lands at 160 Moira Road, Lisburn.

    Minor alterations to the elevational treatment, fenestration and internal configuration of Apartment Block D and to the elevational treatment and fenestration of House Types D1 and D2 and the 6no. industrial/employment units approved under planning permission LA05/2024/0734/F. Minor amendments to approved internal boundary treatments

    25 Mar 2026 0m away Amendments
  • LA05/2026/0305/F Awaiting decision

    Lands at 160 Moira Road, Lisburn

    Change of use from 3 no wifi hubs at ground floor of block B granted planning permission under planning reference LA05/2022/0830/F, to 4 no live/work units (use class C1) including minor elevational changes and associated site works at lands at 160 Moira Road, Lisburn

    2 Apr 2026 36m away Full applications

In Lisburn and Castlereagh

  • LA05/2026/0605/DC Awaiting decision

    Land at and to the north of 360 Saintfield Road (including 350, 352 Saintfield Road) Castlereagh, Belfast. (Zoning MCH 03/08 and MCH 03/10)

    Discharge of condition 24: development shall not begin until drainage works have been carried out to the satisfaction of the Council in agreement with NI Water. Provision of a Drainage Assessment and Drainage Layout

    23 Jul 2026 Conditions
  • LA05/2026/0604/DC Awaiting decision

    Land at and to the north of 360 Saintfield Road (including 350, 352 Saintfield Road) Castlereagh, Belfast. (Zoning MCH 03/08 and MCH 03/10)

    Discharge of condition 13 of Y/2009/0407/F. No development shall take place until measures have been agreed in writing with the Council to protect those trees to be retained within the site from damage during construction works. The agreed measures shall be put in place before the commencement of development and retained throughout the construction period. Provided: tree protection fencing details and plan showing location; photographs of measures erected on site.

    23 Jul 2026 Conditions
  • LA05/2026/0603/DC Awaiting decision

    Lands north of Ballymaconaghy Road including No's 14 & 22-24 Ballymaconaghy Road, Knockbreckan, Belfast, BT8 6SB

    Submission of Post Installation Play Area Inspection Report to demonstrate that the play park, as approved under LA05/2025/0052/DC, has been subsequently installed in line with the requirements of Condition 26 of LA05/2022/1170/F

    21 Jul 2026 Conditions
  • 126 Hillsborough Road, Lisburn, BT28 1JZ

    Discharge of condition 25 of planning approval LA05/2022/0018/F Prior to works commencing on site, all existing trees shown on Layout Plan, drawing no.25a, as being retained shall be protected in accordance with British Standard 5837:2012 Trees in relation to design, demolition and construction – Recommendations. No retained tree shall be cut down, uprooted or destroyed, or have its roots damaged within the crown spread nor shall arboricultural work or tree surgery take place on any retained tree other than in accordance with the approved plans and particulars, without the written approval of the Planning Authority

    15 May 2026 Conditions
  • LA05/2026/0591/DC Awaiting decision

    Lands north of Ballymaconaghy Road including No's 14 & 22-24 Ballymaconaghy Road Knockbreckan, Belfast, BT8 6SB

    Discharge of condition 15 previously approved under LA05/2022/1170/F

    15 Jul 2026 Conditions