Skip to content
PlanIndex Get alerts
Menu

Planning application

LA05/2026/0013/DC

47 Kesh Road, Lisburn, BT27 5RR

Awaiting decision Lisburn and Castlereagh Discharge of Condition

Proposal

Discharge of condition 2 previously approved under LA05/2025/0149/F

As published by the council, reference LA05/2026/0013/DC

Timeline

Dates from the published record

  1. 6 Jan 2026

    Received by Lisburn and Castlereagh

  2. 29 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Lisburn and Castlereagh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • 47 Kesh Road, Lisburn, BT27 5RR

    Section 54 application to modify Condition 2 of planning approval LA05/2025/0149/F: Original text for this condition: The construction of the dwelling hereby permitted, including the clearing of topsoil, shall not commence until the existing building, coloured green on the approved plan 01 date published to the Planning Register on 17th November 2025 demolished, all rubble and foundations have been removed and the site restored in accordance with the details on the approved plans. Proposed amended text for this condition: Within one month of the date of occupation of the dwelling hereby permitted, the existing building, coloured green on the approved plan 01, date published to the Planning Register on 17th November 2025, shall be demolished, along with all rubble and foundations removed and the site restored in accordance with the details on the approved plans.

    28 Jan 2026 0m away Full applications
  • 1 Kings Oak Manor, Lisburn, BT27 5SS

    Proposed replacement single storey Sun Room to the rear of existing dwelling, freestanding aluminium framed pergola, enhanced landscaping along with associated ancillary works.

    12 Feb 2026 334m away Full applications
  • Site 4 Royal Meadows, Kesh Road, Lisburn

    Proposed single storey detached double garage

    31 Jul 2025 412m away Full applications
  • LA05/2026/0028/F Awaiting decision

    18 Cockhill Road, Lisburn, BT27 5RS

    Retention of mobile building as driver welfare hut

    8 Jan 2026 456m away Full applications

In Lisburn and Castlereagh

  • LA05/2026/0605/DC Awaiting decision

    Land at and to the north of 360 Saintfield Road (including 350, 352 Saintfield Road) Castlereagh, Belfast. (Zoning MCH 03/08 and MCH 03/10)

    Discharge of condition 24: development shall not begin until drainage works have been carried out to the satisfaction of the Council in agreement with NI Water. Provision of a Drainage Assessment and Drainage Layout

    23 Jul 2026 Conditions
  • LA05/2026/0604/DC Awaiting decision

    Land at and to the north of 360 Saintfield Road (including 350, 352 Saintfield Road) Castlereagh, Belfast. (Zoning MCH 03/08 and MCH 03/10)

    Discharge of condition 13 of Y/2009/0407/F. No development shall take place until measures have been agreed in writing with the Council to protect those trees to be retained within the site from damage during construction works. The agreed measures shall be put in place before the commencement of development and retained throughout the construction period. Provided: tree protection fencing details and plan showing location; photographs of measures erected on site.

    23 Jul 2026 Conditions
  • LA05/2026/0603/DC Awaiting decision

    Lands north of Ballymaconaghy Road including No's 14 & 22-24 Ballymaconaghy Road, Knockbreckan, Belfast, BT8 6SB

    Submission of Post Installation Play Area Inspection Report to demonstrate that the play park, as approved under LA05/2025/0052/DC, has been subsequently installed in line with the requirements of Condition 26 of LA05/2022/1170/F

    21 Jul 2026 Conditions
  • 126 Hillsborough Road, Lisburn, BT28 1JZ

    Discharge of condition 25 of planning approval LA05/2022/0018/F Prior to works commencing on site, all existing trees shown on Layout Plan, drawing no.25a, as being retained shall be protected in accordance with British Standard 5837:2012 Trees in relation to design, demolition and construction – Recommendations. No retained tree shall be cut down, uprooted or destroyed, or have its roots damaged within the crown spread nor shall arboricultural work or tree surgery take place on any retained tree other than in accordance with the approved plans and particulars, without the written approval of the Planning Authority

    15 May 2026 Conditions
  • LA05/2026/0591/DC Awaiting decision

    Lands north of Ballymaconaghy Road including No's 14 & 22-24 Ballymaconaghy Road Knockbreckan, Belfast, BT8 6SB

    Discharge of condition 15 previously approved under LA05/2022/1170/F

    15 Jul 2026 Conditions