Planning application

Education Authority Dundonald Headquarters, Grahams Bridge Road, Belfast, BT16 2HS

Granted Lisburn and Castlereagh LA05/2025/0410/F Full

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed 1nr single story modular building to provide 2nr Special Educational Needs (SEN) classrooms and ancillary spaces including soft play areas, fencing and gates. Proposed 1nr single story modular hall building for use as a school assembly, dining and multi-purpose hall. Retention of existing 1nr single story modular building to provide 2nr Special Educational Needs (SEN) classrooms and ancillary spaces including soft play areas, fencing and gates.

As published by the council, reference LA05/2025/0410/F

Application record

Reference
LA05/2025/0410/F
Type
Full
Status
Site Inspection Complete
Decision
Permitted
Received
29 May 2025
Validated
9 Jun 2025
Ward
Graham's Bridge
Postcode
BT16 2HS

Timeline

Dates from the published record

  1. 29 May 2025

    Received by Lisburn and Castlereagh

  2. 9 Jun 2025

    Validated

    Checked as complete and ready for consideration.

  3. 7 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

23 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 57 Ardnoe Avenue, Dundonald, Belfast, BT16 2LU

    LA05/2026/0204/F Submitted 18 Mar 2026 206m away

    Addition of a two-storey side extension

    Granted Full applications Extension 9 docs
  • 2 Grahamsbridge Park, Belfast, BT16 2DE

    LA05/2024/0536/F Submitted 15 Jul 2024 218m away

    Demolition of existing garage. Addition of a single-storey side extension for disabled access. Widening the driveway. (Updated rear elevation)

    Granted Full applications Extension Demolition 15 docs
    Small domestic
  • 3 Ardara Avenue, Dundonald, BT16 2BZ

    LA05/2025/0819/F Submitted 13 Nov 2025 234m away

    Removal of existing single storey flat roof extension and garage. Addition of single storey pitched roof extension and office/ storage to replace existing garage

    Granted Full applications Extension 22 docs
    Small domestic
  • Land between numbers 1 & 2 and 4 & 5 Grahamsbridge Mews, Dundonald

    LA05/2025/0225/F Submitted 2 Mar 2025 287m away

    Erection of two semi-detached three bedroom dwellings with in-curtilage parking and associated private gardens.

    Withdrawn Full applications 20 docs
  • Land approximately 50 meters south of 240 Comber Rd, Dundonald, Belfast BT16 2BS

    LA05/2025/0270/F Submitted 10 Apr 2025 370m away

    Wastewater Pumping Station (WwPS) including chambers and associated sewers below ground level and a Motor Control Centre (MCC) Kiosk building, telemetry and lighting columns. Other works include associated site and access works.

    Granted Full applications 40 docs
  • 7 Church Road, Belfast, BT16 2LN

    LA05/2024/0356/F Submitted 1 May 2024 439m away

    Change of use from hairdressers to bakery (retrospective)

    Granted Full applications 17 docs

In Lisburn and Castlereagh

  • LA05/2026/0693/F Awaiting decision

    161 Dromore Road, Hillsborough, BT26 6JA

    Alterations to existing Diner (161) and Service Station Shop (163) involving Internal refits to both buildings to accommodate new franchisees. External alterations to both buildings including alterations to existing entrances, formation of a new entrance to No163, addition of feature panelling external wall treatment to both buildings, construction of an access ramp and complimentary steps to No 161.

    31 Aug 2026 Full applications
  • Lands opposite Nos. 41 - 45, 60 - 67 & 72 - 75 Ballantine Gardens, Lisburn, BT27 5FB

    Proposed amendments to planning permission S/2011/0383/F including the conversion of approved first floor domestic storage areas into two apartments, additional parking, bin store and ancillary site works

    10 Dec 2025 Full applications
  • 12 Lurganville Road, Moira, Craigavon, BT67 0PJ

    Proposed new access to existing dwelling at 12A in lieu of shared access (use of shared access to laneway to 12A to cease)

    7 Jul 2026 Full applications
  • 37 Fairfields Manor, Magheralave, Lisburn, BT28 3WA

    Attic conversion with new rear flat roof dormer

    3 Jul 2026 Full applications
  • Land approximately 50 meters south of 240 Comber Rd, Dundonald, Belfast BT16 2BS

    Wastewater Pumping Station (WwPS) including chambers and associated sewers below ground level and a Motor Control Centre (MCC) Kiosk building, telemetry and lighting columns. Other works include associated site and access works.

    10 Apr 2025 Full applications