Planning application
7 Church Road, Belfast, BT16 2LN
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Change of use from hairdressers to bakery (retrospective)
As published by the council, reference LA05/2024/0356/F
Application record
- Reference
- LA05/2024/0356/F
- Type
- Full
- Status
- Determined
- Decision
- Granted
- Received
- 1 May 2024
- Validated
- 7 May 2024
- Decided
- 23 Dec 2024
- Ward
- Graham's Bridge
- Postcode
- BT16 2LN
Timeline
Dates from the published record
-
1 May 2024
Received by Lisburn and Castlereagh
-
7 May 2024
Validated
Checked as complete and ready for consideration.
-
23 Dec 2024
Decision issued: Granted
-
3 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Belfast
2 applications on PlanIndex · across 2 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Dundonald Alterations, 5 Church Road, Belfast, BT16 2LN
Retrospective change of use from clothing alterations to pizza takeaway shop
Granted Full applications 13 docs -
-
LAND TO REAR OF 1011 Upper Newtownards Road, Belfast, BT16 1RN
ROOF FINISH CHANGE FROM CONCRETE TILE TO SLATE AND INSTALLATION ON PV PANELS.
Granted Amendments 7 docs -
Public Footpath 13m north east of No. 919 Upper Newtownards Road, Dundonald, Belfast BT16 1RQ
98% historically approved · decision due ~26 Jun
Proposed digital unit on rear of telephone kiosk
Awaiting decision Advertising 9 docs -
Public Footpath 9m north east of No. 919 Upper Newtownards Road, Dundonald, Belfast BT16 1RQ
98% historically approved · decision due ~26 Jun
Proposed Telephone Kiosk on public Footpath
Awaiting decision Full applications 17 docs -
919-923 Upper Newtownards Road, Belfast, BT16 1RQ
Refurbishment of the restaurant to include the redecoration of elevations, reconfiguration of the roof line with the construction of extensions to incorporate a new entrance, formation of new access door and glazing. Replacement drive thru booths with new cladding and associates works to the site.
Granted Full applications Extension Windows or glazing 16 docs
Other full applications applications
In Lisburn and Castlereagh
-
LA05/2026/0693/F Awaiting decision
161 Dromore Road, Hillsborough, BT26 6JA
Alterations to existing Diner (161) and Service Station Shop (163) involving Internal refits to both buildings to accommodate new franchisees. External alterations to both buildings including alterations to existing entrances, formation of a new entrance to No163, addition of feature panelling external wall treatment to both buildings, construction of an access ramp and complimentary steps to No 161.
-
LA05/2025/0903/F Granted
Lands opposite Nos. 41 - 45, 60 - 67 & 72 - 75 Ballantine Gardens, Lisburn, BT27 5FB
Proposed amendments to planning permission S/2011/0383/F including the conversion of approved first floor domestic storage areas into two apartments, additional parking, bin store and ancillary site works
-
LA05/2026/0576/F Granted
12 Lurganville Road, Moira, Craigavon, BT67 0PJ
Proposed new access to existing dwelling at 12A in lieu of shared access (use of shared access to laneway to 12A to cease)
-
LA05/2026/0571/F Granted
37 Fairfields Manor, Magheralave, Lisburn, BT28 3WA
Attic conversion with new rear flat roof dormer
-
LA05/2025/0270/F Granted
Land approximately 50 meters south of 240 Comber Rd, Dundonald, Belfast BT16 2BS
Wastewater Pumping Station (WwPS) including chambers and associated sewers below ground level and a Motor Control Centre (MCC) Kiosk building, telemetry and lighting columns. Other works include associated site and access works.