Skip to content
PlanIndex Get alerts
Menu

Planning application

80 Greenburn Way Lisburn BT27 4LU

Granted Lisburn and Castlereagh LA05/2022/1022/F Full

Works: Extension Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed two storey extension to side of dwelling

As published by the council, reference LA05/2022/1022/F

Application record

Reference
LA05/2022/1022/F
Type
Full
Status
Determined
Decision
Granted
Received
2 Nov 2022
Validated
2 Nov 2022
Decided
2 Mar 2023
Ward
Magheralave
Postcode
BT27 4LU

Timeline

Dates from the published record

  1. 2 Nov 2022

    Received by Lisburn and Castlereagh

  2. 2 Mar 2023

    Decision issued: Granted

  3. 27 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Caledon

56 applications on PlanIndex · across 6 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 9 Woodland Drive, Lisburn, BT27 4PH

    LA05/2024/0051/F Submitted 11 Jan 2024 127m away

    Proposed single storey extension to side of dwelling.

    Granted Full applications Extension 9 docs
    Small domestic
  • 10 Braemar Crescent, Lisburn, BT27 4LP

    LA05/2024/0609/F Submitted 12 Aug 2024 280m away

    Amendments to first floor layout to include an additional bathroom, en suite and bathroom. The rear wall built up and flat roof added to accommodate amendments to first floor.

    Granted Full applications 7 docs
  • 7 Braemar Crescent, Lisburn, BT27 4LP

    LA05/2026/0222/F Submitted 17 Mar 2026 289m away

    Proposed single storey extension and adaptations for person with disabilities

    Granted Full applications Extension 9 docs
    Small domestic
  • adjacent to 196 Belsize Road Lisburn

    LA05/2022/0765/F Submitted 19 Aug 2022 319m away

    Construction of 5 apartments and associated siteworks

    Granted Full applications New dwelling 20 docs
    Several homes
  • 8 Cloverdale Road, Lisburn, BT27 4LW

    LA05/2026/0005/F Submitted 29 Dec 2025 364m away

    Roofspace conversion with rear dormer

    Granted Full applications Loft or dormer 10 docs
  • 25 Carrisbrook Gardens, Lisburn, BT27 4PN

    LA05/2026/0610/F Submitted 21 Jul 2026 391m away

    Conversion of garage plus extension to provide ancillary accommodation to be used in association with existing dwelling

    Granted Full applications Extension 8 docs
    Domestic

In Lisburn and Castlereagh

  • LA05/2026/0693/F Awaiting decision

    161 Dromore Road, Hillsborough, BT26 6JA

    Alterations to existing Diner (161) and Service Station Shop (163) involving Internal refits to both buildings to accommodate new franchisees. External alterations to both buildings including alterations to existing entrances, formation of a new entrance to No163, addition of feature panelling external wall treatment to both buildings, construction of an access ramp and complimentary steps to No 161.

    31 Aug 2026 Full applications
  • Lands opposite Nos. 41 - 45, 60 - 67 & 72 - 75 Ballantine Gardens, Lisburn, BT27 5FB

    Proposed amendments to planning permission S/2011/0383/F including the conversion of approved first floor domestic storage areas into two apartments, additional parking, bin store and ancillary site works

    10 Dec 2025 Full applications
  • 12 Lurganville Road, Moira, Craigavon, BT67 0PJ

    Proposed new access to existing dwelling at 12A in lieu of shared access (use of shared access to laneway to 12A to cease)

    7 Jul 2026 Full applications
  • 37 Fairfields Manor, Magheralave, Lisburn, BT28 3WA

    Attic conversion with new rear flat roof dormer

    3 Jul 2026 Full applications
  • Land approximately 50 meters south of 240 Comber Rd, Dundonald, Belfast BT16 2BS

    Wastewater Pumping Station (WwPS) including chambers and associated sewers below ground level and a Motor Control Centre (MCC) Kiosk building, telemetry and lighting columns. Other works include associated site and access works.

    10 Apr 2025 Full applications