Skip to content
PlanIndex Get alerts
Menu

Planning application

25 Carrisbrook Gardens, Lisburn, BT27 4PN

Granted Lisburn and Castlereagh LA05/2026/0610/F Full

Works: Extension Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Conversion of garage plus extension to provide ancillary accommodation to be used in association with existing dwelling

As published by the council, reference LA05/2026/0610/F

Application record

Reference
LA05/2026/0610/F
Type
Full
Status
Site Inspection Complete
Decision
Permitted
Received
21 Jul 2026
Validated
27 Jul 2026
Ward
Magheralave
Postcode
BT27 4PN

Timeline

Dates from the published record

  1. 21 Jul 2026

    Received by Lisburn and Castlereagh

  2. 27 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 7 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 8 Cloverdale Road, Lisburn, BT27 4LW

    LA05/2026/0005/F Submitted 29 Dec 2025 151m away

    Roofspace conversion with rear dormer

    Granted Full applications Loft or dormer 10 docs
  • 16 Carrisbrook Gardens, Lisburn, BT27 4PN

    LA05/2023/0352/F Submitted 1 Mar 2023 185m away

    Proposed balcony over existing flat roof to include privacy screen between neighboring property

    Refused Full applications 13 docs
  • 115 Moss Road, Lambeg, Lisburn, BT27 4NY

    LA05/2025/0369/F Submitted 22 May 2025 285m away

    Retrospective change of use application from hairdressers to cafe

    Granted Full applications 10 docs
  • 7 Braemar Crescent, Lisburn, BT27 4LP

    LA05/2026/0222/F Submitted 17 Mar 2026 329m away

    Proposed single storey extension and adaptations for person with disabilities

    Granted Full applications Extension 9 docs
    Small domestic
  • 9 Woodland Drive, Lisburn, BT27 4PH

    LA05/2024/0051/F Submitted 11 Jan 2024 337m away

    Proposed single storey extension to side of dwelling.

    Granted Full applications Extension 9 docs
    Small domestic
  • 10 Braemar Crescent, Lisburn, BT27 4LP

    LA05/2024/0609/F Submitted 12 Aug 2024 356m away

    Amendments to first floor layout to include an additional bathroom, en suite and bathroom. The rear wall built up and flat roof added to accommodate amendments to first floor.

    Granted Full applications 7 docs

In Lisburn and Castlereagh

  • LA05/2026/0693/F Awaiting decision

    161 Dromore Road, Hillsborough, BT26 6JA

    Alterations to existing Diner (161) and Service Station Shop (163) involving Internal refits to both buildings to accommodate new franchisees. External alterations to both buildings including alterations to existing entrances, formation of a new entrance to No163, addition of feature panelling external wall treatment to both buildings, construction of an access ramp and complimentary steps to No 161.

    31 Aug 2026 Full applications
  • Lands opposite Nos. 41 - 45, 60 - 67 & 72 - 75 Ballantine Gardens, Lisburn, BT27 5FB

    Proposed amendments to planning permission S/2011/0383/F including the conversion of approved first floor domestic storage areas into two apartments, additional parking, bin store and ancillary site works

    10 Dec 2025 Full applications
  • 12 Lurganville Road, Moira, Craigavon, BT67 0PJ

    Proposed new access to existing dwelling at 12A in lieu of shared access (use of shared access to laneway to 12A to cease)

    7 Jul 2026 Full applications
  • 37 Fairfields Manor, Magheralave, Lisburn, BT28 3WA

    Attic conversion with new rear flat roof dormer

    3 Jul 2026 Full applications
  • Land approximately 50 meters south of 240 Comber Rd, Dundonald, Belfast BT16 2BS

    Wastewater Pumping Station (WwPS) including chambers and associated sewers below ground level and a Motor Control Centre (MCC) Kiosk building, telemetry and lighting columns. Other works include associated site and access works.

    10 Apr 2025 Full applications