Proposal

Floodplain improvement works consisting of the realignment and reprofiling of a section of Circuit Brook and adjacent land and associated works

As published by the council, reference 25/00606/FULMEI

Application record

Reference
25/00606/FULMEI
Type
Full Application (Major) with EIA
Status
Pending Consideration
Received
14 May 2025
Validated
15 May 2025
Ward
Longdon
Parish
Curborough And Elmhurst

Timeline

Dates from the published record

  1. 14 May 2025

    Received by Lichfield

  2. 15 May 2025

    Validated

    Checked as complete and ready for consideration.

  3. 22 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 14 August 2025, 13 weeks from validation under the statutory target. Extensions of time are common and are agreed case by case.

    Lichfield took a median of 56 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

177 documents on file for this application

  • Appendix 11.3a fiw flood risk assessment Flood Risk Assessment · 09 Sep 2026
  • 260729 333100827 a7.7 la (final issue) north lichfield - llfa meeting note Supporting information · 09 Sep 2026
  • 260508_response to llfa comments (fiw phasing) Supporting information · 09 Sep 2026
  • Figure 8.9 floodplain improvement works (landscape proposal plan) Amended Plans · 30 Jul 2026
  • Appendix 10.8a fiw biodiversity net gain assessment Amended Plans · 30 Jul 2026
  • 260730 333100827 a5 bng metric appendix update covering letter fiw Amended Plans · 30 Jul 2026
  • 260508_response to llfa comments (fiw phasing).pdf Consultation Responses · 10 Jun 2026
  • 260508_response to llfa comments (fiw phasing).pdf Consultation Responses · 10 Jun 2026
  • _ arboricultural officer - ldc Consultation Responses · 07 May 2026
  • _llfa response Consultation Responses · 31 Mar 2026
  • _severn trent water Consultation Responses · 19 Mar 2026
  • _ archaeology officer - scc Consultation Responses · 11 Mar 2026
  • Edp7085_r018-e-floodplain improvement works_ archaeological asse Archaeological Assessment · 19 Feb 2026
  • Edp7085_r019 - flood improvement works bng Biodiversity metric calculation tool · 19 Feb 2026
  • Figure 8.9 floodplain improvement works (landscape proposal plan) Landscaping · 19 Feb 2026
  • Figure 8.8 illustrative long section (curborough brooks development site). Site Layout Plan · 19 Feb 2026
  • Ln-lp-20 rev f floodplain improvement works - landscape proposals plan - dec 25. Landscaping · 19 Feb 2026
  • Appendix 10.1a ecological baseline report. Ecological Survey / Reports · 19 Feb 2026
  • Appendix 10.2a flood improvement works ecology technical note Ecological Survey / Reports · 19 Feb 2026
  • 260219 333100827 a5 p17 es addendum covering letter fiw (draft). Covering Letter · 19 Feb 2026
  • Appendix 10.6a flood improvement works arboricultural impact assessment. Arboricultural Survey / Report · 19 Feb 2026
  • Appendix 10.9 natural england letter Supporting information · 19 Feb 2026
  • Appendix 11.2a sustainable drainage report (curborough brooks development site) Drainage Plans / Report · 19 Feb 2026
  • Appendix 11.2a sustainable drainage report (curborough brooks development site) Drainage Plans / Report · 19 Feb 2026
  • Appendix 11.3a flood risk assessment (floodplain improvement works site) p1 Flood Risk Assessment · 19 Feb 2026
  • Appendix 11.3a flood risk assessment (floodplain improvement works site) p2 Flood Risk Assessment · 19 Feb 2026
  • Appendix 11.4 land at north curborough brooks response to llfa comments. Supporting information · 19 Feb 2026
  • Volume 2 - contents page Supporting information · 19 Feb 2026
  • Volume 1 - contents page Supporting information · 19 Feb 2026
  • Transmittal - 00009 Supporting information · 19 Feb 2026
  • Curborough brooks nts addendum Supporting information · 19 Feb 2026
  • Curborough brooks es addendum 1 Supporting information · 19 Feb 2026
  • 103357-pef-zz-xx-dr-ye-0599-s2-p04 circuit brook diversion earthworks Site Layout Plan · 19 Feb 2026
  • 103357-pef-zz-xx-dr-ye-0596-s2-p06 circuit brook diversion construction details Site Layout Plan · 19 Feb 2026
  • 103357-pef-zz-xx-dr-ye-0589-s2-p13 circuit brook diversion nettex futureproof Site Layout Plan · 19 Feb 2026
  • _ flood risk officer - scc Consultation Responses · 26 Nov 2025
  • _ staffordshire highways Consultation Responses · 27 Aug 2025
  • _network rail Consultation Responses · 14 Jul 2025
  • _ flood risk officer - scc Consultation Responses · 20 Jun 2025
  • _environment agency Consultation Responses · 20 Jun 2025
  • _environment agency Consultation Responses · 20 Jun 2025
  • _ conservation officer - ldc Consultation Responses · 11 Jun 2025
  • _national highways Consultation Responses · 10 Jun 2025
  • _staffordshire ramblers Consultation Responses · 10 Jun 2025
  • _ arboricultural officer - ldc Consultation Responses · 09 Jun 2025
  • _ ecology manager - ldc Consultation Responses · 09 Jun 2025
  • _lichfield council Consultation Responses · 06 Jun 2025
  • _staffordshire planning Consultation Responses · 02 Jun 2025
  • Newt officer Consultation Responses · 28 May 2025
  • _ staffordshire county council rights of way Consultation Responses · 22 May 2025
  • Applicationformredacted Application Form · 15 May 2025
  • 333100827 - bm-m-62c - floodplain improvement works site - site location plan-bm Location / Block / Site Plan · 15 May 2025
  • 333100827 ln-lp-20 revf floodplain improvement works - landscape proposals plan- Block Plan · 15 May 2025
  • Es figure 1.1 site boundary plan.pdf Environmental Report · 15 May 2025
  • Es figure 1.2 flood mitigation boundary plan.pdf Environmental Report · 15 May 2025
  • Es figure 2.1 cumulative schemes plan.pdf Environmental Report · 15 May 2025
  • Es figure 3.1 land use plan parameter plan.pdf Environmental Report · 15 May 2025
  • Es figure 3.2 access and movement parameter plan.pdf Environmental Report · 15 May 2025
  • Es figure 3.3 building heights parameter plan.pdf Environmental Report · 15 May 2025
  • Es figure 3.4 green infrastructure parameter plan.pdf Environmental Report · 15 May 2025
  • Es figure 3.5 draft concept masterplan.pdf Environmental Report · 15 May 2025
  • Es figure 6.1 study area.pdf Environmental Report · 15 May 2025
  • Es figure 6.2 early years education.pdf Environmental Report · 15 May 2025
  • Es figure 6.3 primary schools.pdf Environmental Report · 15 May 2025
  • Es figure 6.4 secondary schools.pdf Environmental Report · 15 May 2025
  • Es figure 6.5 gp provision.pdf Environmental Report · 15 May 2025
  • Es figure 6.6 open space.pdf Environmental Report · 15 May 2025
  • Es figure 8.1 site context plan.pdf Environmental Report · 15 May 2025
  • Es figure 8.2 topography plan.pdf Environmental Report · 15 May 2025
  • Es figure 8.3 landscape character plan.pdf Environmental Report · 15 May 2025
  • Es figure 8.4 site appraisal plan.pdf Environmental Report · 15 May 2025
  • Es figure 8.5 visual appraisal plan.pdf Environmental Report · 15 May 2025
  • Es figure 8.6 opps and cons plan.pdf Environmental Report · 15 May 2025
  • Es figure 8.7 illustrative masterplan.pdf Environmental Report · 15 May 2025
  • Es figure 12.1 site location.pdf Environmental Report · 15 May 2025
  • Es figure 12.2 site local highway network.pdf Environmental Report · 15 May 2025
  • Es figure 12.3 link id layout plan.pdf Environmental Report · 15 May 2025
  • Es figure 12.4 local prow network.pdf Environmental Report · 15 May 2025
  • Es figure 12.5 local cycle routes.pdf Environmental Report · 15 May 2025
  • Es figure 12.6 key destinations.pdf Environmental Report · 15 May 2025
  • Es figure 12.7 bus routes surrounding the site.pdf Environmental Report · 15 May 2025
  • Es figure 12.8 collision data plan.pdf Environmental Report · 15 May 2025
  • Es figure 14.1 sound survey locations.pdf Environmental Report · 15 May 2025
  • Es figure 15.1 site context.pdf Environmental Report · 15 May 2025
  • Es figure 15.2 study area.pdf Environmental Report · 15 May 2025
  • Es figure 15.3 existing receptors.pdf Environmental Report · 15 May 2025
  • Es figure 15.4 internal receptors.pdf Environmental Report · 15 May 2025
  • Es figure 15.5 monitoring.pdf Environmental Report · 15 May 2025
  • Es figure 15.6 site sensitivity.pdf Environmental Report · 15 May 2025
  • Es figure 15.7 trackout sensitivity.pdf Environmental Report · 15 May 2025
  • Es chapter 06 population and human health.pdf Environmental Report · 15 May 2025
  • Es chapter 07 built heritage.pdf Environmental Report · 15 May 2025
  • Es chapter 09 agricultural land.pdf Environmental Report · 15 May 2025
  • Es chapter 10 biodiversity.pdf Environmental Report · 15 May 2025
  • Es chapter 11 water resources and flood risk.pdf Environmental Report · 15 May 2025
  • Es chapter 12 transport and access.pdf Environmental Report · 15 May 2025
  • Es chapter 13 climate change.pdf Environmental Report · 15 May 2025
  • Es chapter 14 noise and vibration.pdf Environmental Report · 15 May 2025
  • Es chapter 15 air quality.pdf Environmental Report · 15 May 2025
  • Es chapter 16 lighting.pdf Environmental Report · 15 May 2025
  • Es chapter 17 summary and residual effects.pdf Environmental Report · 15 May 2025
  • Es appendices 15.1 - 15.6 air quality appendices land at north lichfield.pdf Environmental Report · 15 May 2025
  • Es appendix 1.1 location of information witthin the es.pdf Environmental Report · 15 May 2025
  • Es appendix 1.2 statement of expertise.pdf Environmental Report · 15 May 2025
  • Es appendix 2.1 eia scoping opinion.pdf Environmental Report · 15 May 2025
  • Es appendix 7.1 built heritage.pdf Environmental Report · 15 May 2025
  • Es appendix 8.1 lvia methodology.pdf Environmental Report · 15 May 2025
  • Es appendix 8.2 landscape effects table.pdf Environmental Report · 15 May 2025
  • Es appendix 8.3 site appraisal photos.pdf Environmental Report · 15 May 2025
  • Es appendix 8.4 site context photos.pdf Environmental Report · 15 May 2025
  • Es appendix 8.5 visual effects.pdf Environmental Report · 15 May 2025
  • Es appendix 10.1 - edp 12 - edp7085_d015d_uncontrolled(1.10).pdf Environmental Report · 15 May 2025
  • Es appendix 10.2 fiw ecology technical note.pdf Environmental Report · 15 May 2025
  • Es appendix 10.3 shadow habitat regulations assessment.pdf Environmental Report · 15 May 2025
  • Es appendix 10.4 technical note_cannock chase sac.pdf Environmental Report · 15 May 2025
  • Es appendix 10.5 arboricultural impact assessment.pdf Environmental Report · 15 May 2025
  • Es appendix 10.6 floodplain improvement works_ arboricultural impa.pdf Environmental Report · 15 May 2025
  • Es appendix 10.7 biodiversity net gain.pdf Environmental Report · 15 May 2025
  • Es appendix 10.8 fiw bng assessment.pdf Environmental Report · 15 May 2025
  • Es appendix 11.1 curborough brooks flood risk assessment .pdf Environmental Report · 15 May 2025
  • Es appendix 11.3 fiw flood risk assessment.pdf Environmental Report · 15 May 2025
  • Es appendix 12.2 framework travel plan.pdf Environmental Report · 15 May 2025
  • Es appendix 13.1 relevant policies, guidance & legislation.pdf Environmental Report · 15 May 2025
  • Es appendix 13.2 curborough traffic flow data.pdf Environmental Report · 15 May 2025
  • Es appendix 13.3 construction emissions factor toolkit assessment.pdf Environmental Report · 15 May 2025
  • Es appendix 13.4 operational emissions factor toolkit assessment.pdf Environmental Report · 15 May 2025
  • Es appendix 13.5 mean annual temperature anomaly.pdf Environmental Report · 15 May 2025
  • Es appendix 13.6 mean annual precipitation anomaly.pdf Environmental Report · 15 May 2025
  • Es appendix 13.7 maximum summer temperature anomaly.pdf Environmental Report · 15 May 2025
  • Es appendix 13.8 summer precipitation anomaly.pdf Environmental Report · 15 May 2025
  • Es appendix 13.9 minimum winter temperature anomaly.pdf Environmental Report · 15 May 2025
  • Es appendix 13.10 winter precipitation anomaly.pdf Environmental Report · 15 May 2025
  • Es appendix 14.1 glossary.pdf Environmental Report · 15 May 2025
  • Es appendix 14.2 legislation, policy and guidance.pdf Environmental Report · 15 May 2025
  • Es appendix 14.3 sound survey results.pdf Environmental Report · 15 May 2025
  • Es appendix 14.4 construction noise assessment.pdf Environmental Report · 15 May 2025
  • Es appendix 14.5 operational noise assessment.pdf Environmental Report · 15 May 2025
  • Es appendix 14.6 site suitability assessment.pdf Environmental Report · 15 May 2025
  • Es appendix 16.1 lighting impact assessment.pdf Environmental Report · 15 May 2025
  • Es curborough brooks es volume 2 contents page.pdf Environmental Report · 15 May 2025
  • Es chapter 05 construction methodology and programme.pdf Environmental Report · 15 May 2025
  • Es figure 13.1 ukcp 18 25km grid square where the site is located.pdf Environmental Report · 15 May 2025
  • 250501 333100827 a5 p11 fiw covering letter (final).pdf Covering Letter · 15 May 2025
  • 333100827 ln-lp-20 revf floodplain improvement works - landscape proposals plan- Proposed Plans / Elevations · 15 May 2025
  • 333100827 - bm-m-62c - floodplain improvement works site - site location plan-bm Location / Site Plan · 15 May 2025
  • 333100827 - bm-m-25c - composite site location plan-bm-m-25.pdf Location / Site Plan · 15 May 2025
  • 103357-pef-zz-xx-dr-ye-0596-s2-p01 circuit brook diversion construction details. Proposed Plans / Elevations · 15 May 2025
  • 103357-pef-zz-xx-dr-ye-0589-s2-p08_circuit brook diversion option 2b.pdf Proposed Plans / Elevations · 15 May 2025
  • 103357-pef-zz-xx-dr-ye-0549-s2-p02_circuit brook diversion earthworks flat sprea Proposed Plans / Elevations · 15 May 2025
  • 250430 - edp7085_r019 - flood improvement works bng.xlsx Proposed Plans / Elevations · 15 May 2025
  • 250429 333100827 a5 p9b floodplain improvement works planning statement (final d Planning Statement · 15 May 2025
  • 250417 - edp7085_r018-d-floodplain improvement works_ archaeological asse.pdf Archaeological Assessment · 15 May 2025
  • 250416 - 103357-pef-z00-wld-rp-ye-000201-s2-p02_cir hmtn_bound.pdf Proposed Plans / Elevations · 15 May 2025
  • 250414 13890-crh-xx-xx-rp-lq-0003_dts_floodplain improvement-p02_optimized.pdf Proposed Plans / Elevations · 15 May 2025
  • 250414 - 13890-crh-xx-xx-rp-lq-0004_cemp_floodplain_improvement-p02.pdf Proposed Plans / Elevations · 15 May 2025
  • Es non-technical summary_part3.pdf Environmental Statement · 15 May 2025
  • Es non-technical summary_part2.pdf Environmental Statement · 15 May 2025
  • Es non-technical summary_part1.pdf Environmental Statement · 15 May 2025
  • Es appendix 2.1 eia scoping report_part6.pdf Environmental Statement · 15 May 2025
  • Es appendix 2.1 eia scoping report_part5.pdf Environmental Statement · 15 May 2025
  • Es appendix 2.1 eia scoping report_part4.pdf Environmental Statement · 15 May 2025
  • Es appendix 2.1 eia scoping report_part3.pdf Environmental Statement · 15 May 2025
  • Es appendix 2.1 eia scoping report_part2.pdf Environmental Statement · 15 May 2025
  • Es appendix 2.1 eia scoping report_part1.pdf Environmental Statement · 15 May 2025
  • Es appendix 12.1 103357-pef-z00-cbn-rp-tp-000001_s2_p5 - transport assessment pa Environmental Statement · 15 May 2025
  • Es appendix 12.1 103357-pef-z00-cbn-rp-tp-000001_s2_p5 - transport assessment pa Environmental Statement · 15 May 2025
  • Es appendix 12.1 103357-pef-z00-cbn-rp-tp-000001_s2_p5 - transport assessment pa Environmental Statement · 15 May 2025
  • Es appendix 11.2 103357-pef-z01-cbw-rp-cd-000021-s2-p03 - sustainable drainage r Environmental Statement · 15 May 2025
  • Es appendix 11.2 103357-pef-z01-cbw-rp-cd-000021-s2-p03 - sustainable drainage r Environmental Statement · 15 May 2025
  • Esappendix 11.2 103357-pef-z01-cbw-rp-cd-000021-s2-p03 - sustainable drainage re Environmental Statement · 15 May 2025
  • Es appendix 11.2 103357-pef-z01-cbw-rp-cd-000021-s2-p03 - sustainable drainage r Environmental Statement · 15 May 2025
  • Es chapter 08 landscape and visual.pdf Environmental Statement · 15 May 2025
  • Es chapter 04 alternatives and design evolution.pdf Environmental Statement · 15 May 2025
  • Es chapter 03 the site and development.pdf Environmental Statement · 15 May 2025
  • Es chapter 02 eia methodology.pdf Environmental Statement · 15 May 2025
  • Es chapter 01 introduction.pdf Environmental Statement · 15 May 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Lichfield for determination, against a statutory target of thirteen weeks. Over the last year Lichfield decided full applications in a median of 69 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Lichfield

  • 26/01300/FUL Awaiting decision

    18A Market Street Lichfield Staffordshire WS13 6LH

    Alterations to shopfront (Sch1)

    Received 27 Oct, published by the council 28 Oct 2026 Full applications
  • 26/01294/FUL Awaiting decision

    31 Smarts Avenue Shenstone Woodend Lichfield Staffordshire WS14 0PB

    Erection of a pair of semi-detached dwellings, with associated parking (Sch1)

    Received 23 Oct, published by the council 28 Oct 2026 Full applications
  • 26/01273/FUL Awaiting decision

    Brookhay Cottage Broad Lane Huddlesford Lichfield Staffordshire WS13 8QH

    Demolition of existing dwelling and erection of replacement dwelling (Sch1)

    Received 20 Oct, published by the council 22 Oct 2026 Full applications
  • 26/01255/FUL Awaiting decision

    10, 26, 27, 28, 33, 36 And 37 Beech Gardens Lichfield Staffordshire WS14 9EB

    Installation of an External Wall Insulation (EWI) system to seven dwellings (Sch1)

    Received 15 Oct, published by the council 26 Oct 2026 Full applications
  • 26/01259/FUL Awaiting decision

    Le Reve 26 Bird Street Lichfield Staffordshire WS13 6PR

    Repair, restoration and enhancement of shopfront, including repainting, installation of a lantern and retractable awnings and associated works (Sch1)

    Received 15 Oct, published by the council 27 Oct 2026 Full applications