Planning application
Land West Of Watery Lane Lichfield Staffordshire
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Floodplain improvement works consisting of the realignment and reprofiling of a section of Circuit Brook and adjacent land and associated works
As published by the council, reference 25/00606/FULMEI
Application record
- Reference
- 25/00606/FULMEI
- Type
- Full Application (Major) with EIA
- Status
- Pending Consideration
- Received
- 14 May 2025
- Validated
- 15 May 2025
- Ward
- Longdon
- Parish
- Curborough And Elmhurst
Timeline
Dates from the published record
-
14 May 2025
Received by Lichfield
-
15 May 2025
Validated
Checked as complete and ready for consideration.
-
22 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 14 August 2025, 13 weeks from validation under the statutory target. Extensions of time are common and are agreed case by case.
Lichfield took a median of 56 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
177 documents on file for this application
- Appendix 11.3a fiw flood risk assessment
- 260729 333100827 a7.7 la (final issue) north lichfield - llfa meeting note
- 260508_response to llfa comments (fiw phasing)
- Figure 8.9 floodplain improvement works (landscape proposal plan)
- Appendix 10.8a fiw biodiversity net gain assessment
- 260730 333100827 a5 bng metric appendix update covering letter fiw
- 260508_response to llfa comments (fiw phasing).pdf
- 260508_response to llfa comments (fiw phasing).pdf
- _ arboricultural officer - ldc
- _llfa response
- _severn trent water
- _ archaeology officer - scc
- Edp7085_r018-e-floodplain improvement works_ archaeological asse
- Edp7085_r019 - flood improvement works bng
- Figure 8.9 floodplain improvement works (landscape proposal plan)
- Figure 8.8 illustrative long section (curborough brooks development site).
- Ln-lp-20 rev f floodplain improvement works - landscape proposals plan - dec 25.
- Appendix 10.1a ecological baseline report.
- Appendix 10.2a flood improvement works ecology technical note
- 260219 333100827 a5 p17 es addendum covering letter fiw (draft).
- Appendix 10.6a flood improvement works arboricultural impact assessment.
- Appendix 10.9 natural england letter
- Appendix 11.2a sustainable drainage report (curborough brooks development site)
- Appendix 11.2a sustainable drainage report (curborough brooks development site)
- Appendix 11.3a flood risk assessment (floodplain improvement works site) p1
- Appendix 11.3a flood risk assessment (floodplain improvement works site) p2
- Appendix 11.4 land at north curborough brooks response to llfa comments.
- Volume 2 - contents page
- Volume 1 - contents page
- Transmittal - 00009
- Curborough brooks nts addendum
- Curborough brooks es addendum 1
- 103357-pef-zz-xx-dr-ye-0599-s2-p04 circuit brook diversion earthworks
- 103357-pef-zz-xx-dr-ye-0596-s2-p06 circuit brook diversion construction details
- 103357-pef-zz-xx-dr-ye-0589-s2-p13 circuit brook diversion nettex futureproof
- _ flood risk officer - scc
- _ staffordshire highways
- _network rail
- _ flood risk officer - scc
- _environment agency
- _environment agency
- _ conservation officer - ldc
- _national highways
- _staffordshire ramblers
- _ arboricultural officer - ldc
- _ ecology manager - ldc
- _lichfield council
- _staffordshire planning
- Newt officer
- _ staffordshire county council rights of way
- Applicationformredacted
- 333100827 - bm-m-62c - floodplain improvement works site - site location plan-bm
- 333100827 ln-lp-20 revf floodplain improvement works - landscape proposals plan-
- Es figure 1.1 site boundary plan.pdf
- Es figure 1.2 flood mitigation boundary plan.pdf
- Es figure 2.1 cumulative schemes plan.pdf
- Es figure 3.1 land use plan parameter plan.pdf
- Es figure 3.2 access and movement parameter plan.pdf
- Es figure 3.3 building heights parameter plan.pdf
- Es figure 3.4 green infrastructure parameter plan.pdf
- Es figure 3.5 draft concept masterplan.pdf
- Es figure 6.1 study area.pdf
- Es figure 6.2 early years education.pdf
- Es figure 6.3 primary schools.pdf
- Es figure 6.4 secondary schools.pdf
- Es figure 6.5 gp provision.pdf
- Es figure 6.6 open space.pdf
- Es figure 8.1 site context plan.pdf
- Es figure 8.2 topography plan.pdf
- Es figure 8.3 landscape character plan.pdf
- Es figure 8.4 site appraisal plan.pdf
- Es figure 8.5 visual appraisal plan.pdf
- Es figure 8.6 opps and cons plan.pdf
- Es figure 8.7 illustrative masterplan.pdf
- Es figure 12.1 site location.pdf
- Es figure 12.2 site local highway network.pdf
- Es figure 12.3 link id layout plan.pdf
- Es figure 12.4 local prow network.pdf
- Es figure 12.5 local cycle routes.pdf
- Es figure 12.6 key destinations.pdf
- Es figure 12.7 bus routes surrounding the site.pdf
- Es figure 12.8 collision data plan.pdf
- Es figure 14.1 sound survey locations.pdf
- Es figure 15.1 site context.pdf
- Es figure 15.2 study area.pdf
- Es figure 15.3 existing receptors.pdf
- Es figure 15.4 internal receptors.pdf
- Es figure 15.5 monitoring.pdf
- Es figure 15.6 site sensitivity.pdf
- Es figure 15.7 trackout sensitivity.pdf
- Es chapter 06 population and human health.pdf
- Es chapter 07 built heritage.pdf
- Es chapter 09 agricultural land.pdf
- Es chapter 10 biodiversity.pdf
- Es chapter 11 water resources and flood risk.pdf
- Es chapter 12 transport and access.pdf
- Es chapter 13 climate change.pdf
- Es chapter 14 noise and vibration.pdf
- Es chapter 15 air quality.pdf
- Es chapter 16 lighting.pdf
- Es chapter 17 summary and residual effects.pdf
- Es appendices 15.1 - 15.6 air quality appendices land at north lichfield.pdf
- Es appendix 1.1 location of information witthin the es.pdf
- Es appendix 1.2 statement of expertise.pdf
- Es appendix 2.1 eia scoping opinion.pdf
- Es appendix 7.1 built heritage.pdf
- Es appendix 8.1 lvia methodology.pdf
- Es appendix 8.2 landscape effects table.pdf
- Es appendix 8.3 site appraisal photos.pdf
- Es appendix 8.4 site context photos.pdf
- Es appendix 8.5 visual effects.pdf
- Es appendix 10.1 - edp 12 - edp7085_d015d_uncontrolled(1.10).pdf
- Es appendix 10.2 fiw ecology technical note.pdf
- Es appendix 10.3 shadow habitat regulations assessment.pdf
- Es appendix 10.4 technical note_cannock chase sac.pdf
- Es appendix 10.5 arboricultural impact assessment.pdf
- Es appendix 10.6 floodplain improvement works_ arboricultural impa.pdf
- Es appendix 10.7 biodiversity net gain.pdf
- Es appendix 10.8 fiw bng assessment.pdf
- Es appendix 11.1 curborough brooks flood risk assessment .pdf
- Es appendix 11.3 fiw flood risk assessment.pdf
- Es appendix 12.2 framework travel plan.pdf
- Es appendix 13.1 relevant policies, guidance & legislation.pdf
- Es appendix 13.2 curborough traffic flow data.pdf
- Es appendix 13.3 construction emissions factor toolkit assessment.pdf
- Es appendix 13.4 operational emissions factor toolkit assessment.pdf
- Es appendix 13.5 mean annual temperature anomaly.pdf
- Es appendix 13.6 mean annual precipitation anomaly.pdf
- Es appendix 13.7 maximum summer temperature anomaly.pdf
- Es appendix 13.8 summer precipitation anomaly.pdf
- Es appendix 13.9 minimum winter temperature anomaly.pdf
- Es appendix 13.10 winter precipitation anomaly.pdf
- Es appendix 14.1 glossary.pdf
- Es appendix 14.2 legislation, policy and guidance.pdf
- Es appendix 14.3 sound survey results.pdf
- Es appendix 14.4 construction noise assessment.pdf
- Es appendix 14.5 operational noise assessment.pdf
- Es appendix 14.6 site suitability assessment.pdf
- Es appendix 16.1 lighting impact assessment.pdf
- Es curborough brooks es volume 2 contents page.pdf
- Es chapter 05 construction methodology and programme.pdf
- Es figure 13.1 ukcp 18 25km grid square where the site is located.pdf
- 250501 333100827 a5 p11 fiw covering letter (final).pdf
- 333100827 ln-lp-20 revf floodplain improvement works - landscape proposals plan-
- 333100827 - bm-m-62c - floodplain improvement works site - site location plan-bm
- 333100827 - bm-m-25c - composite site location plan-bm-m-25.pdf
- 103357-pef-zz-xx-dr-ye-0596-s2-p01 circuit brook diversion construction details.
- 103357-pef-zz-xx-dr-ye-0589-s2-p08_circuit brook diversion option 2b.pdf
- 103357-pef-zz-xx-dr-ye-0549-s2-p02_circuit brook diversion earthworks flat sprea
- 250430 - edp7085_r019 - flood improvement works bng.xlsx
- 250429 333100827 a5 p9b floodplain improvement works planning statement (final d
- 250417 - edp7085_r018-d-floodplain improvement works_ archaeological asse.pdf
- 250416 - 103357-pef-z00-wld-rp-ye-000201-s2-p02_cir hmtn_bound.pdf
- 250414 13890-crh-xx-xx-rp-lq-0003_dts_floodplain improvement-p02_optimized.pdf
- 250414 - 13890-crh-xx-xx-rp-lq-0004_cemp_floodplain_improvement-p02.pdf
- Es non-technical summary_part3.pdf
- Es non-technical summary_part2.pdf
- Es non-technical summary_part1.pdf
- Es appendix 2.1 eia scoping report_part6.pdf
- Es appendix 2.1 eia scoping report_part5.pdf
- Es appendix 2.1 eia scoping report_part4.pdf
- Es appendix 2.1 eia scoping report_part3.pdf
- Es appendix 2.1 eia scoping report_part2.pdf
- Es appendix 2.1 eia scoping report_part1.pdf
- Es appendix 12.1 103357-pef-z00-cbn-rp-tp-000001_s2_p5 - transport assessment pa
- Es appendix 12.1 103357-pef-z00-cbn-rp-tp-000001_s2_p5 - transport assessment pa
- Es appendix 12.1 103357-pef-z00-cbn-rp-tp-000001_s2_p5 - transport assessment pa
- Es appendix 11.2 103357-pef-z01-cbw-rp-cd-000021-s2-p03 - sustainable drainage r
- Es appendix 11.2 103357-pef-z01-cbw-rp-cd-000021-s2-p03 - sustainable drainage r
- Esappendix 11.2 103357-pef-z01-cbw-rp-cd-000021-s2-p03 - sustainable drainage re
- Es appendix 11.2 103357-pef-z01-cbw-rp-cd-000021-s2-p03 - sustainable drainage r
- Es chapter 08 landscape and visual.pdf
- Es chapter 04 alternatives and design evolution.pdf
- Es chapter 03 the site and development.pdf
- Es chapter 02 eia methodology.pdf
- Es chapter 01 introduction.pdf
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Lichfield for determination, against a statutory target of thirteen weeks. Over the last year Lichfield decided full applications in a median of 69 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Nettex Pharma Watery Lane Lichfield Staffordshire WS13 7SE
Installation of air handling unit on east elevation and erection of 2.4 metre high acoustic fencing around the perimeter of the air handling unit
Granted Full applications 23 docs -
6 Worcester Close Lichfield Staffordshire WS13 7SP
Erection of no2 storey side extension
Granted Householder Extension 6 docsDomestic -
15 Gloucester Close Lichfield Staffordshire WS13 7SS
Erection of single storey rear and first floor side extension
Granted Householder Extension 11 docsSmall domestic -
15 Worcester Close Lichfield Staffordshire WS13 7SP
Erection of single storey side extension (amended scheme)
Granted Householder Extension 19 docsSmall domestic -
20 Worcester Close Lichfield Staffordshire WS13 7SP
Single storey front and side extension incl. garage conversion and relocation of garden wall
Granted Householder Extension 13 docsSmall domestic -
8 Truro Close Lichfield Staffordshire WS13 7SR
Installation of air source heat pump
Granted Householder 10 docsDomestic
Other full applications
In Lichfield
-
26/01300/FUL Awaiting decision
18A Market Street Lichfield Staffordshire WS13 6LH
Alterations to shopfront (Sch1)
-
26/01294/FUL Awaiting decision
31 Smarts Avenue Shenstone Woodend Lichfield Staffordshire WS14 0PB
Erection of a pair of semi-detached dwellings, with associated parking (Sch1)
-
26/01273/FUL Awaiting decision
Brookhay Cottage Broad Lane Huddlesford Lichfield Staffordshire WS13 8QH
Demolition of existing dwelling and erection of replacement dwelling (Sch1)
-
26/01255/FUL Awaiting decision
10, 26, 27, 28, 33, 36 And 37 Beech Gardens Lichfield Staffordshire WS14 9EB
Installation of an External Wall Insulation (EWI) system to seven dwellings (Sch1)
-
26/01259/FUL Awaiting decision
Le Reve 26 Bird Street Lichfield Staffordshire WS13 6PR
Repair, restoration and enhancement of shopfront, including repainting, installation of a lantern and retractable awnings and associated works (Sch1)