Planning application
21-24 PARAGON PLACE AND,21-24 RYCULFF SQUARE, LONDON, SE3 0SP
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
The installation of replacement pitched roof, cast iron rainwater goods - gutters / down pipes, t...
As published by the council, reference DC/26/144422
Application record
- Reference
- DC/26/144422
- Status
- Registered
- Received
- 19 Jun 2026
- Validated
- 7 Jul 2026
- Postcode
- SE3 0SP
Timeline
Dates from the published record
-
19 Jun 2026
Received by Lewisham
-
7 Jul 2026
Validated
Checked as complete and ready for consideration.
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 1 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Lewisham took a median of 54 days over the applications it decided in the last year.
What happens while it is decided
This application is with Lewisham for determination, against a statutory target of eight weeks. Over the last year Lewisham's median decision took 54 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Lewisham's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
28--30 PARAGON PLACE AND 25-28 RYCLUFF SQUARE, LONDON, SE3 0SP
87% historically approved · decision due ~1 Sep
The installation of replacement pitched roof, cast iron rainwater goods - gutters / down pipes, t...
Awaiting decision -
18 AND 20 PARAGON PLACE AND,17-20 RYCULFF SQUARE, LONDON, SE3 0SP
87% historically approved · decision due ~1 Sep
The installation of replacement pitched roof, cast iron rainwater goods - gutters / down pipes, t...
Awaiting decision -
BLOCK, 25-43 PARAGON PLACE, LONDON, SE3 0SP
83% historically approved · decision due ~1 Sep
The installation of replacement pitched roof, cast iron rainwater goods - gutters / down pipes, together with the repair & redecorate the existing overhanging soffit and all associated works to flats at 25 - 43 Paragon Place SE3.
Awaiting decision Full applications New dwelling 8 docs -
6 PARAGON PLACE, LONDON, SE3 0SP
FRONT: ONE Robinia tree (T1) Ht: 7m - CROWN LIFT lower canopy to 2.5m from ground level & remove major deadwood. REAR: ONE Elaeagnus tree (T2) CROWN REDUCE - HEIGHT by 1m from 4m to 3m & LATERALS by 1m from 6m to 5m on all compass points ONE Laurel tree (T3) CROWN REDUCE - HEIGHT by 1m from 5m to 4m & LATERALS by 3m from 9m to 6m on all compass points ONE Holm Oak tree (T4) CROWN REDUCE - HEIGHT by 1m from 4m to 3m & LATERALS by 1m from 3m to 2m ONE Tamarisk tree (T5) CROWN REDUCE - HEIGHT & LATERALS by 1m from 5m to 4m and shape accordingly ensuring a clearance from the property of at least 1.5 metres. Reason for work ? General maintenance Informative A: The sensitive management of the trees are greatly appreciated for landscape amenity, wildlife, wellbeing, and urban forest canopy for environmental benefits to mitigate the effects of climate change. Informative B: Wherever possible, please create habitat log piles in the garden from cut branches for wildlife and biodiversity
Granted Trees 7 docs -
63A PARAGON PLACE, LONDON, SE3 0SP
The alteration and conversion of the existing 2 flats at 63 Paragon Place, SE3 and the construction of a part single/part two storey extension to the rear, together with alterations to the front and side elevations, to provide a three bedroom house with integral garage.
Granted Full applications New dwelling Extension 11 docsSeveral homes -
PARAGON PLACE, 11-23 PARAGON PLACE, LONDON, SE3 0SP
83% historically approved · decision due ~1 Sep
The installation of replacement pitched roof, cast iron rainwater goods - gutters / down pipes, together with the repair & redecorate the existing overhanging soffit, and new roof and roof tiles to the existing garage blocks and all associated works to flats at 11-23 Paragon Place SE3.
Awaiting decision Full applications New dwelling Roofing 9 docs