Planning application
CLARENDON HOTEL, 8-16 MONTPELIER ROW, LONDON, SE3 0RW
Works: Demolition Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Listed Building Consent for the change of use of the Clarendon Hotel, 8-16 Montpelier Row, SE13 from Hotel (C1) to Specialist Older Persons' Accommodation (C3). External alterations include demolition of existing rear additions, repair and restoration of facades and windows, addition of glazed links between listed building and proposed new development. Internal alterations comprise retention of all heritage fabric identified, removal of non-heritage fabric and partitions, localised demolition of floor plates to enable introduction of lifts, double height space, and new apartment layouts.
As published by the council, reference DC/25/141522
Application record
- Reference
- DC/25/141522
- Type
- Listed Building Consent
- Status
- Registered
- Received
- 19 Sep 2025
- Validated
- 31 Oct 2025
- Ward
- Blackheath
- Postcode
- SE3 0RW
Site history
Applications at this address on the Lewisham register
This site has had 3 applications since 2025.
-
DC/26/145009 Awaiting decision
CLARENDON HOTEL, 8-16 MONTPELIER ROW, LONDON, SE3 0RW
REAR: ONE: Beech Tree ( T4) ( TPO T34 of TPO 1976 ) Height approx. 25+m. FELL to ground level. REASON: For health & safety reasons we request the tree be completely felled due to disease. The tree is in a private car park within the hotel boundry.The tree branches are incredibly fragile & prone to breakage.
-
DC/25/141479 Awaiting decision
CLARENDON HOTEL, 8-16 MONTPELIER ROW, LONDON, SE3 0RW
Change of use of the Clarendon Hotel, 8-16 Montpelier Row, SE3 from Hotel (C1) to Specialist Older Persons' Accommodation (C3), demolition of existing rear additions and construction of Specialist Older Persons' Accommodation (C3) to the rear with associated landscaping, access arrangements and other works incidental to the development.
Timeline
Dates from the published record
-
19 Sep 2025
Received by Lewisham
-
31 Oct 2025
Validated
Checked as complete and ready for consideration.
-
28 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 26 December 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Lewisham took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
DP9 Ltd Agent
Active · incorporated 2004
2,658 applications on PlanIndex · across 36 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
232 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Lewisham for determination, against a statutory target of eight weeks. Over the last year Lewisham decided heritage and listed building applications in a median of 93 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
CLARENDON HOTEL, 8-16 MONTPELIER ROW, LONDON, SE3 0RW
83% historically approved · decision due ~21 Nov
Change of use of the Clarendon Hotel, 8-16 Montpelier Row, SE3 from Hotel (C1) to Specialist Older Persons' Accommodation (C3), demolition of existing rear additions and construction of Specialist Older Persons' Accommodation (C3) to the rear with associated landscaping, access arrangements and other works incidental to the development.
Awaiting decision Full applications Demolition 256 docs -
CLARENDON HOTEL, 8-16 MONTPELIER ROW, LONDON, SE3 0RW
100% historically approved · decision due ~5 Oct
REAR: ONE: Beech Tree ( T4) ( TPO T34 of TPO 1976 ) Height approx. 25+m. FELL to ground level. REASON: For health & safety reasons we request the tree be completely felled due to disease. The tree is in a private car park within the hotel boundry.The tree branches are incredibly fragile & prone to breakage.
Awaiting decision Trees 7 docs -
21 MONTPELIER ROW, LONDON, SE3 0RL
An application submitted under Section 73 of the Town and Country Planning Act 1990 for minor material amendments to the planning permission DC/17/102125 dated 11 August 2017, for the installation of hard landscaping to the front garden area, to facilitate additional parking space at 21 Montpelier Row, SE3, to allow for changes to the material used and increase the bin/bike store area.
Granted Amendments 7 docs -
18 MONTPELIER ROW, LONDON, SE3 0RL
REAR: ONE Olive (T1)(ht.8m) CROWN REDUCE HEIGHT by 3m to ht.5m. Reason: general maintenance REAR: ONE Bay (T2)(ht.8m) FELL. Reason: growing against the boundary wall, multi-stemmed, ongoing growth is causing direct impact and structural pressure to the wall, stems showing signs of decay. Informative A: a replacement tree is encouraged such as hawthorn, elder, hazel, crab apple, magnolia, Amelanchier, Pear, Quince (Cydonia oblonga), holly, Laburnum, strawberry tree, for rear amenity, wildlife, and shade to reduce increasingly high summer temperatures due to climate change. Informative B: please create habitat log piles with arisings for wildlife and biodiversity.
Granted Trees 7 docsSmall domestic -
21 MONTPELIER ROW, LONDON, SE3 0RL
An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non material amendment in connection with the planning permission (DC/17/102125) dated 11 August 2018 for the installation of hard landscaping to the front garden area, to facilitate additional parking space at 21 Montpelier Row SE3 in order to allow:- additional bin store with green roof and the material change from black basalt granite setts to resin bonded surface with granite store border.
Refused Amendments 7 docs -
5 MONTPELIER ROW, LONDON, SE3 0RL
Listed Building Consent for the installation of secondary glazing and draught proofing to sash windows and draught proofing to doors at 5 Montpelier Row SE3.
Granted Heritage and listed buildings Windows or glazing 7 docs
Other heritage and listed building applications
In Lewisham
-
DC/26/143632 Granted
164A LEWISHAM WAY, LONDON, SE4 1UU
Listed Building Consent for internal alterations, installation of 3 replacement casement windows at the rear and all associated works at 164A Lewisham Way SE4.
-
DC/25/140638 Granted
6-66 FORESHORE, LONDON, SE8 3AG
Listed Building Consent for the installation of replacement roof lights, new fire-safe doors, together with the upgrade of fire safety with tanks in basement and ventilation system, together with new sprinkler system and all associated at 6-66 Foreshore SE8.
-
DC/25/140827 Granted
7-69 FORESHORE, LONDON, SE8 3AQ
Listed Building Consent for installation of replacement roof lights, new fire-safe doors, together with the upgrade of fire safety with tanks in basement and ventilation system, together with new sprinkler system and all associated works at 7-69 Foreshore SE8.
-
DC/26/144159 Granted
THE GROVE CENTRE, 2 JEWS WALK, LONDON, SE26 6PL
Listed Building Consent for the installation of a glazed canopy to the ground and first floors between the Grove Centre and Grove Centre Church at 2 Jews Walk SE26.
-
DC/26/144769 Awaiting decision
31 ALBURY STREET, LONDON, SE8 3PT
An application submitted under Section 19 of the Planning (Listed Building and Conservation Areas) Act 1990 to vary the wording of Condition 7 (Historic Building Recording) of the listed building consent (DC/25/141717) dated 16 January 2026 at 31 Albury Street, SE8 to revise the trigger for Condition 7 to allow roof repair works to be undertaken before the submission and approval of the Historic Building Recording at 31 Albury Street SE8. (Re-consultation undertaken as the site address was omitted from the original consultation letter dated 28 July 2026)