Planning application
EARL PUMPING STATION, CHILTON GROVE, LONDON, SE8
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 submission for Approval ? Formal Application under EARPS3 ? Addendum to the Remediation Strategy
As published by the council, reference DC/21/121485
Application record
- Reference
- DC/21/121485
- Type
- Thames Tunnel Application
- Status
- Decided
- Decision
- Granted
- Received
- 23 Apr 2021
- Validated
- 23 Apr 2021
- Decided
- 9 Jun 2021
- Decision by
- Delegated
Site history
Applications at this address on the Lewisham register
This site has had 8 applications since 2019: 7 approved, 0 refused.
-
DC/19/114972 Granted
EARL PUMPING STATION, CHILTON GROVE, LONDON, SE8
Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 formal application for the partial discharge Schedule 3 Requirement EARPS 3, Part 1(b) - Contaminated Land (Remediation Strategy) for the Earl Pumping Station (EARPS) worksite.
-
DC/19/114590 Decided
EARL PUMPING STATION, CHILTON GROVE, LONDON, SE8
Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 formal Application to partially discharge Schedule 3 EARPS 8 ? Specification of Accesses (Yeoman Street & Croft Street Construction) ? Formal Application for the Earl Pumping Station worksite
-
DC/19/114404 Granted
EARL PUMPING STATION, CHILTON GROVE, LONDON, SE8
Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (as amended) for approval of a variation to Code of Construction Practice Part B and the partial discharge of Schedule 3 Requirement EARPS 1.
-
DC/19/114380 Granted
EARL PUMPING STATION, CHILTON GROVE, LONDON, SE8
Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 formal Application - Partial discharge of Schedule 3 Requirement EARPS 6 ? Worksite Specific Traffic Management Plan (Phase 3 works) - Earl Pumping Station worksite.
-
DC/19/114383 Granted
EARL PUMPING STATION, CHILTON GROVE, LONDON, SE8
Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 formal application to partially discharge Schedule 3 Requirement PW6 CoCP Part A Section 5 ? Worksite Specific Construction Logistics Plan (Phase 3 works) for the Earl Pumping Station worksite.
-
DC/19/114359 Granted
EARL PUMPING STATION, CHILTON GROVE, LONDON, SE8
Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 formal application to partially discharge Schedule 3 EARPS 8 ? Specification of Accesses (Yeoman Street & Croft Street Construction) amendment for the Earl Pumping Station worksite.
-
DC/19/113455 Granted
EARL PUMPING STATION, CHILTON GROVE, LONDON, SE8
Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 formal Application to partially discharge Schedule 3 Requirement PW6 CoCP Part A ? Air Quality Management Plan at Earl Pumping Station, Chilton Grove.
Timeline
Dates from the published record
-
23 Apr 2021
Received by Lewisham
-
9 Jun 2021
Decision issued: Granted
-
28 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Lewisham granted permission on 9 June 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Lewisham's portal will say. Our guide explains the common types.