Planning application
London Road, Leicester Railway Station, Midland Main Line
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Approval of details reserved by Condition 3 (Phasing Strategy) attached to planning permission 20240594
As published by the council, reference 20261222
Application record
- Reference
- 20261222
- Type
- Application to discharge conditions
- Status
- Pending decision
- Received
- 13 Aug 2026
- Validated
- 15 Aug 2026
- Ward
- Castle
- Decision by
- Delegated
Site history
Applications at this address on the Leicester register
This site has had 3 applications since 2024: 2 approved, 0 refused.
-
20240594 Granted
London Road, Leicester Railway Station, Midland Main Line
Redevelopment of Leicester Railway Station to include new entrance to ticket hall; pedestrian ramp; erection of a canopy, pedestrianisation and regrading of Station Street to create public realm; relocation of Grade II listed gate piers; relocation of Thomas Cook statue; replacement cycle storage; soft and hard landscaping, lighting and CCTV; relocation of taxi rank, pick up/drop off point, reduced mobility parking bays; refurbishment works to porte cochere; provision of heating and cooling units; services and boundary treatment and other associated works.
-
20240595 Granted
London Road, Leicester Railway Station, Midland Main Line
Internal and external alterations to Grade II listed building and relocation of Grade II listed gate piers.
Timeline
Dates from the published record
-
13 Aug 2026
Received by Leicester
-
15 Aug 2026
Validated
Checked as complete and ready for consideration.
-
9 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 10 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Leicester took a median of 56 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Leicester for determination, against a statutory target of eight weeks. Over the last year Leicester decided condition discharge and variation applications in a median of 49 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
London Road, Leicester Railway Station, Midland Main Line
Redevelopment of Leicester Railway Station to include new entrance to ticket hall; pedestrian ramp; erection of a canopy, pedestrianisation and regrading of Station Street to create public realm; relocation of Grade II listed gate piers; relocation of Thomas Cook statue; replacement cycle storage; soft and hard landscaping, lighting and CCTV; relocation of taxi rank, pick up/drop off point, reduced mobility parking bays; refurbishment works to porte cochere; provision of heating and cooling units; services and boundary treatment and other associated works.
Granted Full applications 64 docs -
London Road, Leicester Railway Station, Midland Main Line
Internal and external alterations to Grade II listed building and relocation of Grade II listed gate piers.
Granted Heritage and listed buildings 58 docs -
Midland Main Line Leicester Railway Station London Road
Internal and external alterations to Grade II listed building
Withdrawn Heritage and listed buildings 4 docs -
1 Waterloo Way, Peat House
Change of use of fourth floor from office (Class E) to education (Class F1)
Granted Full applications 10 docs -
31 Waterloo Way, Arnhem House
81% historically approved · decision due ~24 Jun
Construction of housing for electrical transformer in the car park; installation of three cycle shelters; conversion of ground floor parking spaces to form extension providing co-working and gym space; alterations to building (Class E)
Awaiting decision Full applications Extension 14 docs -
30 East Street, St Johns House
Approval of details reserved by Conditions 16 (bat and bird boxes),18 (Biodiversity gain plan),19 (Habitat monitoring and management plan), 20 (Arboricultural method statement) attached to planning permission 20250833
Granted Conditions 8 docs
Other condition discharge and variation applications
In Leicester
-
20260695 Granted
Infirmary Square, Leicester Royal Infirmary, Balmoral Building
Approval of details reserved by condition 7 (Sample Panel drawings and Materials) attached to planning permission 20250422 (amended plans received on 02/07/2026)
-
20261345 Awaiting decision
Northgate Street, Soar Lane, Leicester Waterside Leicester
Approval of details reserved by Condition 15 (EMP) attached to planning permission 20231899
-
20261072 Granted
30 Almond Road
Approval of details reserved by BNG condition attached to planning permission 20260387
-
20261313 Awaiting decision
211 Scraptoft Lane
Approval of details reserved by Condition 4 (revised bat survey times) attached to planning permission 20242020
-
20261311 Awaiting decision
Marwood Road, Stocking Farm Neighbourhood Centre
Approval of details reserved by Condition 14 (Land contamination) attached to planning permission 20221514