Planning application
8 Newarke Close, Newarke Point
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Construction of single storey detached building ancillary to the student accommodation within existing car park; removal of smoking shelter and cycle store; installation of 32 bay cycle store, installation of bin store; alteration of car park resulting in the loss of 9 spaces; associated landscaping to student accommodation (Sui Generis)
As published by the council, reference 20260933
Application record
- Reference
- 20260933
- Type
- Operational development - full application
- Status
- Pending decision
- Received
- 19 Jun 2026
- Validated
- 30 Jun 2026
- Ward
- Castle
- Decision by
- Delegated
Site history
Applications at this address on the Leicester register
This site has had 2 applications since 2026: 1 approved, 0 refused.
-
20260594 Granted
8 Newarke Close, Newarke Point
Installation of guard rail system at roof level of student accommodation (sui generis)
Timeline
Dates from the published record
-
19 Jun 2026
Received by Leicester
-
30 Jun 2026
Validated
Checked as complete and ready for consideration.
-
22 Jul 2026
Added to PlanIndex
-
27 Aug 2026
Status changed to Pending Decision
Previously Pending decision.
-
3 Sep 2026
Status changed to Pending decision
Previously Pending Decision.
-
9 Sep 2026
Status changed to Pending Decision
Previously Pending decision.
-
8 Oct 2026
Status changed to Pending decision
Previously Pending Decision.
-
Decision
Awaiting decision
Decision expected by 25 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Leicester took a median of 56 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Leicester for determination, against a statutory target of eight weeks. Over the last year Leicester decided full applications in a median of 61 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
8 Newarke Close, Newarke Point
Installation of guard rail system at roof level of student accommodation (sui generis)
Granted Full applications 19 docs -
61 Mill Lane
Installation of one double sided non illuminated free standing sign (Class D1)
Granted Advertising 6 docs -
The Gateway, De Montfort University, Portland Building
Installation of one non-illuminated sign to front of building (Class D1)
Granted Advertising 6 docs -
The Gateway, De Montfort University, Hugh Aston Building
Installation of shopfront to cafe (Class A3)
Granted Full applications Windows or glazing 18 docs -
The Gateway, De Montfort University, Hugh Aston Building
Installation of four non-illuminated vinyl signs to cafe (Class A3)
Granted Advertising 18 docs -
Mill Lane, Kimberlin Library De Montfort University
Notification of installation of solar panels to roof of building (Class F1)
Granted 5 docs
Other full applications
In Leicester
-
20251275 Granted
176-180 Loughborough Road
Demolition of part of rear; change of use from former police station (Sui Generis) to 6 flats (4x1bed) (2x2bed)(Class C3); construction of first floor extension at rear; alterations to roof at front; associated car parking; bin and cycle storage; boundary treatment; alterations (Amendments received)
-
20261147 Granted
3 Romway Avenue
Construction of single storey extension at front and rear; first floor extension at side; increase in height of existing two-storey side extension; construction of hipped roof over existing two storey side extension; alterations to dwellinghouse (Class C3)
-
20261109 Granted
65 Stoughton Drive North
Construction of single storey extension at rear; alterations to dwellinghouse (Class C3)
-
20261018 Granted
37 Ashfield Road
Construction of single storey extension at rear with raised patio; alterations to the house (Class C3)
-
20261183 Granted
12 Bunten Green
Construction of single storey extension to rear of dwellinghouse (Class C3)