Planning application
41 King Street, Pilot House
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Non material amendment to planning permission 20222176 (Elevation Changes) (amended plans received 5/12/2024)
As published by the council, reference 20241672
Application record
- Reference
- 20241672
- Type
- Non-Material Change to Planning Permission
- Status
- Determined
- Decision
- Granted As published: Conditional approval
- Received
- 18 Sep 2024
- Validated
- 19 Sep 2024
- Decided
- 9 Dec 2024
- Ward
- Castle
- Decision by
- Delegated
Site history
Applications at this address on the Leicester register
This site has had 3 applications since 2020: 3 approved, 0 refused.
-
20240393 Granted
41 King Street, Pilot House
Variation of condition 18 (approved plans condition) attached to planning permission 20222176 (Change of use of mixed use Pilot House site (Sui Generis), including refurbishment of most buildings for office use (with ancillary cafe) (Class E); use of existing parking area to the south of the site (Duke St Depot) for servicing and vehicle parking; removal of small Duke St loading bay and construction of an atrium space; new pedestrian accesses to King Street and Duke Street; associated landscaping; alterations) to provide substation access from Duke Street Elevation; alterations (amended plans received 11/11/2024)
-
20200102 Granted
41 King Street, Pilot House
Change of use of north-east section of Pilot House from mixed use (Sui Generis) to offices (Class B1)
Timeline
Dates from the published record
-
18 Sep 2024
Received by Leicester
-
19 Sep 2024
Validated
Checked as complete and ready for consideration.
-
9 Dec 2024
Decision issued: Conditional approval
-
18 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Leicester granted permission on 9 December 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
41 King Street, Pilot House
Variation of condition 18 (approved plans condition) attached to planning permission 20222176 (Change of use of mixed use Pilot House site (Sui Generis), including refurbishment of most buildings for office use (with ancillary cafe) (Class E); use of existing parking area to the south of the site (Duke St Depot) for servicing and vehicle parking; removal of small Duke St loading bay and construction of an atrium space; new pedestrian accesses to King Street and Duke Street; associated landscaping; alterations) to provide substation access from Duke Street Elevation; alterations (amended plans received 11/11/2024)
Granted Full applications 15 docs -
41 King Street, Pilot House
Change of use of north-east section of Pilot House from mixed use (Sui Generis) to offices (Class B1)
Granted Other 10 docs -
36 King Street, Kings Head
Discharge of Condition 2 (materials & specifications) of planning permission 20210398
Granted Conditions 2 docs -
36 King Street, the King's Head
Construction of covered area; alterations to side of public house (Class A4) (amended plans received 8/05/2020)
Granted Full applications 15 docs -
24 - 36 King Street, car park
Change of use from private car park (sui generis) to public car park (sui generis); construction of boundary wall; hard standing (amended plan received 01/10/2024)
Granted Full applications 21 docsSmall domestic -
4-6 New Street
Approval of details reserved by condition 2 (damp), 3 (fire escape doors), 4 (fire prevention barrier), 5 (infilled openings to flat 1), 6 (suspended ceiling and roof lantern), 7 (secondary glazing), 8 (stud walls) attached to planning permission 20241984
Granted Conditions Windows or glazing 17 docs
Other amendment applications
In Leicester
-
20261453 Awaiting decision
Heacham Drive, Land to South
Non material amendment to planning permission to 20250928 (Sample panels - condition 20)
-
20261290 Granted
Ashton Green, Leicester Road, Beaumont Leys Lane, Thurcaston Road, Leicester
Non material amendment to planning permission 20250506 (improvements to the proposed elevations and the substitution of the proposed new bricktypes)
-
20261240 Granted
Infirmary Square, Leicester Royal Infirmary, Balmoral Building
Non material amendment to planning permission 20250422 (alterations to elevations)
-
20261280 Awaiting decision
104 & 106 Shanklin Drive
Non material amendment to planning permission 20230802 (to increase ridge height of gable end and extend dormer extension)
-
20261003 Granted
257 Belgrave Gate
Non-material amendment to planning permission 20242080 (Demolition of the existing buildings and the construction of a self-storage facility (Use Class B8), with associated landscaping, parking and servicing areas) to amend the landscaping scheme