Planning application

41 King Street, Pilot House

Granted Leicester 20240393 Operational development - full application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Variation of condition 18 (approved plans condition) attached to planning permission 20222176 (Change of use of mixed use Pilot House site (Sui Generis), including refurbishment of most buildings for office use (with ancillary cafe) (Class E); use of existing parking area to the south of the site (Duke St Depot) for servicing and vehicle parking; removal of small Duke St loading bay and construction of an atrium space; new pedestrian accesses to King Street and Duke Street; associated landscaping; alterations) to provide substation access from Duke Street Elevation; alterations (amended plans received 11/11/2024)

As published by the council, reference 20240393

Application record

Reference
20240393
Type
Operational development - full application
Status
Determined
Decision
Granted As published: Conditional approval
Received
27 Feb 2024
Validated
3 Apr 2024
Decided
24 Jan 2025
Ward
Castle
Decision by
Delegated

Site history

Applications at this address on the Leicester register

This site has had 3 applications since 2020: 3 approved, 0 refused.

  • 20241672 Granted

    41 King Street, Pilot House

    Non material amendment to planning permission 20222176 (Elevation Changes) (amended plans received 5/12/2024)

    Decided 9 Dec 2024 Amendments
  • 20200102 Granted

    41 King Street, Pilot House

    Change of use of north-east section of Pilot House from mixed use (Sui Generis) to offices (Class B1)

    Decided 19 Feb 2020 Other

Timeline

Dates from the published record

  1. 27 Feb 2024

    Received by Leicester

  2. 3 Apr 2024

    Validated

    Checked as complete and ready for consideration.

  3. 24 Jan 2025

    Decision issued: Conditional approval

  4. 9 Oct 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Leicester granted permission on 24 January 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 41 King Street, Pilot House

    20241672 Submitted 18 Sep 2024 50 yards away

    Non material amendment to planning permission 20222176 (Elevation Changes) (amended plans received 5/12/2024)

    Granted Amendments 11 docs
  • 41 King Street, Pilot House

    20200102 Submitted 17 Jan 2020 50 yards away

    Change of use of north-east section of Pilot House from mixed use (Sui Generis) to offices (Class B1)

    Granted Other 10 docs
  • 36 King Street, Kings Head

    20212656 Submitted 22 Oct 2021 50 yards away

    Discharge of Condition 2 (materials & specifications) of planning permission 20210398

    Granted Conditions 2 docs
  • 36 King Street, the King's Head

    20192299 Submitted 29 Nov 2019 50 yards away

    Construction of covered area; alterations to side of public house (Class A4) (amended plans received 8/05/2020)

    Granted Full applications 15 docs
  • 24 - 36 King Street, car park

    20241167 Submitted 28 Jun 2024 50 yards away

    Change of use from private car park (sui generis) to public car park (sui generis); construction of boundary wall; hard standing (amended plan received 01/10/2024)

    Granted Full applications 21 docs
    Small domestic
  • 4-6 New Street

    20260699 Submitted 19 May 2026 50 yards away

    Approval of details reserved by condition 2 (damp), 3 (fire escape doors), 4 (fire prevention barrier), 5 (infilled openings to flat 1), 6 (suspended ceiling and roof lantern), 7 (secondary glazing), 8 (stud walls) attached to planning permission 20241984

    Granted Conditions Windows or glazing 17 docs

In Leicester

  • 20251275 Granted

    176-180 Loughborough Road

    Demolition of part of rear; change of use from former police station (Sui Generis) to 6 flats (4x1bed) (2x2bed)(Class C3); construction of first floor extension at rear; alterations to roof at front; associated car parking; bin and cycle storage; boundary treatment; alterations (Amendments received)

    Received 1 Aug, published by the council 22 Jul 2026 Full applications
  • 20261147 Granted

    3 Romway Avenue

    Construction of single storey extension at front and rear; first floor extension at side; increase in height of existing two-storey side extension; construction of hipped roof over existing two storey side extension; alterations to dwellinghouse (Class C3)

    Received 3 Aug, published by the council 27 Aug 2026 Full applications
  • 20261109 Granted

    65 Stoughton Drive North

    Construction of single storey extension at rear; alterations to dwellinghouse (Class C3)

    Received 24 Jul, published by the council 14 Aug 2026 Full applications
  • 20261018 Granted

    37 Ashfield Road

    Construction of single storey extension at rear with raised patio; alterations to the house (Class C3)

    Received 6 Jul, published by the council 14 Aug 2026 Full applications
  • 20261183 Granted

    12 Bunten Green

    Construction of single storey extension to rear of dwellinghouse (Class C3)

    Received 7 Aug, published by the council 9 Sep 2026 Full applications