Skip to content
PlanIndex Get alerts
Menu

Planning application

63 Alderton Bank Moortown Leeds LS17 5LP

Awaiting decision Leeds 26/05141/DHH

Works: Extension Roofing Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

6.00m single storey rear extension, 4.90m to ridge height and 2.50m to eaves

As published by the council, reference 26/05141/DHH

Application record

Reference
26/05141/DHH
Status
Current
Received
14 Sep 2026
Validated
14 Sep 2026
Ward
Alwoodley
Decision by
Delegated Decision
Postcode
LS17 5LP

Comment by 7 October 2026

The council is taking comments on this application until then. Have your say on Leeds's portal.

Site history

Applications at this address on the Leeds register

This site has had 2 applications since 2026: 1 approved, 0 refused.

  • 26/02871/FU Granted

    63 Alderton Bank Moortown Leeds LS17 5LP

    Demolition of outbuilding; construction of single storey rear and side extension; replacement of door with two new ground floor windows to side; landscaping alterations to rear.

    Decided 14 Jul 2026

Timeline

Dates from the published record

  1. 14 Sep 2026

    Received by Leeds

  2. 16 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 9 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Leeds took a median of 51 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

2 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Leeds for determination, against a statutory target of eight weeks. Over the last year Leeds's median decision took 51 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Leeds's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • 63 Alderton Bank Moortown Leeds LS17 5LP

    26/02871/FU Submitted 20 May 2026 0m away

    Demolition of outbuilding; construction of single storey rear and side extension; replacement of door with two new ground floor windows to side; landscaping alterations to rear.

    Granted Extension Demolition +1
    Small domestic
  • 46 Alderton Bank Moortown Leeds LS17 5LG

    26/00853/FU Submitted 23 Feb 2026 202m away

    Part two storey part single storey rear extension, including to link to existing garage; new window to side at first floor

    Granted Full applications Extension Windows or glazing 7 docs
    Small domestic
  • 46 Alderton Bank Moortown Leeds LS17 5LG

    26/02257/FU Submitted 21 Apr 2026 202m away

    Variation of condition 2 (Approved Plans) to previously approved Planning Application 26/00853/FU (Part two storey part single storey rear extension, including to link to existing garage; new window to side at first floor) to amend the approved plans by increasing the ground and first floor rear extension

    Refused Full applications Extension Windows or glazing 7 docs
    Small domestic
  • 36 Tynwald Road Moortown Leeds LS17 5ED

    26/03866/FU Submitted 8 Jul 2026 237m away

    First floor side extension

    Granted Extension
  • 29 Scotland Wood Road Moortown Leeds LS17 5LR

    26/03200/FU Submitted 1 Jul 2026 262m away

    Part two storey, part single storey side/rear extension; porch to front; new boundary wall to front; removal of garage to rear; replaced with new garage to rear boundary wall

    Refused Extension 10 docs
    Small domestic
  • 10 Pennyfield Close Meanwood Leeds LS6 4NZ

    23/00876/TR Submitted 10 Feb 2023 273m away

    T1 Field Maple: To draw back by approximately 3m to as close to the boundary line as possible whilst working within BS3998 best practice for tree pruning. The reason for the work is to reduce the overhang of the tree into the garden.

    Granted Trees 5 docs