Planning application
Land To The Rear Of 2A Hollyshaw Lane Whitkirk Leeds LS15 7BD
Works: Extension Loft or dormer Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Variation of condition 2 (Approved Plans) to previously approved Planning Application 25/00528/FU (Two storey house on vacant site to rear of 2a Hollyshaw Lane) for alterations to windows, including alteration of three ground floor side windows, to one window; new rooflight to rear and enlargement of rooflight to front; amendment of dormer window design; enlargement of windows to side and rear; side door to rear extension
As published by the council, reference 26/04905/FU
Application record
- Reference
- 26/04905/FU
- Status
- Current
- Validated
- 2 Sep 2026
- Postcode
- LS15 7BD
Site history
Applications at this address on the Leeds register
This site has had 3 applications since 2025: 2 approved, 0 refused.
-
26/9/00039/MOD Granted
Land To The Rear Of 2A Hollyshaw Lane Whitkirk Leeds LS15 7BD
Two storey house on vacant site to rear of 2a Hollyshaw Lane - NON MATERIAL AMENDMENT TO 25/00528/FU - Roof-integrated solar panels added. Front porch infilled to create internal area; facing brickwork to match existing plinth (below DPC). Side door added to rear single-story bay. Cills raised on 3no. ground floor windows (West elevation). Rear bi-fold door width reduced by 225mm.
-
25/06050/COND Granted
Land To The Rear Of 2A Hollyshaw Lane Whitkirk Leeds LS15 7BD
Consent agreement or approval required by conditions 5 (statement of construction practice), 12 (phase II site investigation), 16 (infiltration drainage), 17 (drainage scheme) and 19 (arboricultural method statement) of planning application 25/00528/FU
Timeline
Dates from the published record
-
2 Sep 2026
Validated
Checked as complete and ready for consideration.
-
10 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 28 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Leeds took a median of 51 days over the applications it decided in the last year.
What happens while it is decided
This application is with Leeds for determination, against a statutory target of eight weeks. Over the last year Leeds's median decision took 51 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Leeds's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
18 Hollyshaw Lane Whitkirk Leeds LS15 7BD
Consent, agreement or approval required by condition 4 to planning application 22/03542/FU
Granted Conditions 6 docs -
8 Carter Mount Whitkirk Leeds LS15 7BJ
83% historically approved · decision due ~1 Oct
Single storey rear extension with flat roof and roof light
Awaiting decision Extension Loft or dormerSmall domestic -
24 Carter Mount Whitkirk Leeds LS15 7BJ
Single storey side infill extension with bris soleil and timber cladding
Granted ExtensionSmall domestic -
12 Hollyshaw Crescent Whitkirk Leeds LS15 7AN
Single storey side and rear extension
Granted Full applications Extension 7 docsSmall domestic -
42 Baronsmead Whitkirk Leeds LS15 7AR
Single storey extension to the side and rear
Granted Full applications Extension 8 docsSmall domestic -
2A Hollyshaw Lane Whitkirk Leeds LS15 7BD
Two storey extensions to the front; single storey extension to the rear, with veranda over; alterations and an increase in height of the roof; rendering to the elevations of the dwelling and replacement doors and windows
Granted Full applications Extension Windows or glazing 15 docsSmall domestic