Skip to content
PlanIndex Get alerts
Menu

Planning application

16 The Rise Kirkstall Leeds LS5 3EP

Awaiting decision Leeds 26/03868/FU Full Planning Application

Works: Loft or dormer Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Conversion of second-storey to form habitable space including dormer windows to rear; new rooflight to front

As published by the council, reference 26/03868/FU

Application record

Reference
26/03868/FU
Type
Full Planning Application
Status
Current
Received
28 Jul 2026
Validated
28 Jul 2026
Ward
Kirkstall
Decision by
Delegated Decision
Postcode
LS5 3EP

Timeline

Dates from the published record

  1. 28 Jul 2026

    Received by Leeds

  2. 6 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 22 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Leeds took a median of 52 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Leeds for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 10A The Rise Kirkstall Leeds LS5 3EP

    25/06120/FU Submitted 28 Nov 2025 27m away

    Part retrospective application for a raised decking area and steps to rear, and erection of screen fence

    Granted Full applications 10 docs
    Small domestic
  • 66 Morris Lane Kirkstall Leeds LS5 3EN

    26/02078/FU Submitted 27 Apr 2026 55m away

    Extension to roof to replace hip with gable, dormer to rear; single-storey rear extension; new rooflights to front

    Refused Full applications Extension Loft or dormer 15 docs
    Small domestic
  • 9 Abbey Gorse Kirkstall Leeds LS5 3DD

    23/01015/TR Submitted 17 Feb 2023 95m away

    T1 Oak - Evenly thin the crown by approximately 15% and remove any dead/dangerous branches.

    Withdrawn Trees 6 docs
  • 72 Morris Lane Kirkstall Leeds LS5 3EN

    09/00287/COND Submitted 26 Jan 2009 105m away

    Consent, agreement or approval required by condition 2 of Planning Application 07/04087/FU

    Granted Conditions
  • 29 Woodbridge Gardens Headingley Leeds LS6 3LW

    25/06846/FU Submitted 15 Jan 2026 124m away

    Part two, part single storey side extension

    Granted Full applications Extension 11 docs
    Small domestic
  • 15 Abbey Gorse Kirkstall Leeds LS5 3DD

    23/00423/FU Submitted 26 Jan 2023 133m away

    Single storey extension to front with terrace above, conversion of garage into habitable space, new hardstanding to front

    Granted Full applications Extension 7 docs
    Small domestic

In Leeds

  • 26/02683/FU Granted

    Burton Grange Burton Crescent Headingley Leeds LS6 4DN

    Variation of condition 1 (Approved plans) to previously approved Planning Application 26/00918/FU for the addition of two windows to the North West facing elevation (Elevation 02)

    20 May 2026 Full applications
  • 25/00110/FU Granted

    Land Rear Of 31 Back Lane New Farnley Leeds LS12 5HN

    Demolition of existing barn and replaced with a single dwelling (C3) using the same footprint and massing.

    16 Jan 2025 Full applications
  • 26/04708/FU Awaiting decision

    Howley Beck Cottage 201 Scotchman Lane Morley Leeds LS27 0PA

    Demolition of existing side extensions; construction of part single-storey, part two-storey side and rear extension; conversion of integrated garage to form habitable space; new raised terrace and steps to side

    4 Sep 2026 Full applications
  • 26/04774/FU Awaiting decision

    Former Allotments Off Bruntcliffe Road Morley Leeds LS27 0QQ

    Variation of condtion 2 (approved plans) to approved planning application 26/00905/FU (Variation of condition 2 (Approved Plans) to previously approved application 24/06291/FU (Erection of 45 residential dwellings with associated access and landscaping) to allow updated house types plans to reflect the new developer) for alterations to approved house types and rewording of supporting CEMP document to align with Plan for routes of access to site

    4 Sep 2026 Full applications
  • 26/04771/FU Awaiting decision

    61 - 69 Town Street Horsforth Leeds LS18 5BP

    Alterations associated with fit out of cafe unit, including new louvred grilles, wall mounted condensers to the rear

    3 Sep 2026 Full applications