Planning application
Hough Side Road Pudsey
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Relocation of an existing storm overflow and the construction of an Integrated Constructed Wetland, a new outfall to the Pudsey Beck, new access tracks, and associated ancillary works
As published by the council, reference 25/00607/FU
Application record
- Reference
- 25/00607/FU
- Type
- Full Planning Application
- Status
- Decided
- Decision
- Approved
- Received
- 3 Feb 2025
- Validated
- 3 Feb 2025
- Decided
- 20 Aug 2026
- Ward
- Pudsey
- Decision by
- Delegated Decision
Site history
Applications at this address on the Leeds register
This site has had 4 applications since 2025: 1 approved, 0 refused.
-
26/04996/COND Awaiting decision
Hough Side Road Pudsey
Consent, agreement or approval required by condition 21 (Phase II Report) to planning application 25/00607/FU Remediation Options Appraisal and Remediation Strategy July 2026
-
26/04994/COND Awaiting decision
Hough Side Road Pudsey
Consent, agreement or approval required by condition 8 (Significant Habitat Management and Monitoring Plan) and the biodiversity net gain condition to planning application 25/00607/FU
-
26/04995/COND Awaiting decision
Hough Side Road Pudsey
Consent, agreement or approval required by condition 3 (Construction Environmental Management Plan) to planning application 25/00607/FU
Timeline
Dates from the published record
-
3 Feb 2025
Received by Leeds
-
22 Jul 2026
Added to PlanIndex
-
20 Aug 2026
Decision issued: Approved
Related applications
Cases linked to this one on the register
3 later applications on the register refer to this one:
-
26/04996/COND Awaiting decision
Hough Side Road Pudsey
Consent, agreement or approval required by condition 21 (Phase II Report) to planning application 25/00607/FU Remediation Options Appraisal and Remediation Strategy July 2026
-
26/04994/COND Awaiting decision
Hough Side Road Pudsey
Consent, agreement or approval required by condition 8 (Significant Habitat Management and Monitoring Plan) and the biodiversity net gain condition to planning application 25/00607/FU
-
26/04995/COND Awaiting decision
Hough Side Road Pudsey
Consent, agreement or approval required by condition 3 (Construction Environmental Management Plan) to planning application 25/00607/FU
Documents
Plans, drawings, consultee responses and the officer's report
149 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Leeds granted permission on 20 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Hough Side Works Pudsey
Consent agreement or approval required by conditions 3 (condition survey) and 8 (proposed signage) of planning application 24/04625/FU
Granted Conditions 7 docs -
Hough Side Works Pudsey
Consent, agreement or approval required by condition 12 (Landscape and BNG Management Plan) of Planning Application 24/04625/FU
Granted Conditions 4 docs -
Land Adjacent Acres Hall Farm Acres Hall Avenue Pudsey LS28 9EJ
Certificate of Proposed Lawful Development for the siting of a static caravan
Granted Lawful development 2 docs -
Troydale View Farm Acres Hall Avenue Pudsey LS28 9EJ
Retrospective application for the creation of menage
Granted Full applications 13 docs -
South View Hough Side Lane Pudsey LS28 9JH
Two storey side link extension incorporating new entrance door; first floor rear terrace with glazed balustrade; new window and bifold door to rear at first floor, replacement windows to front and rear, alterations to ground levels to rear including new retaining wall
Granted Full applications Extension Windows or glazing 8 docs -
76 Hough Side Road Pudsey LS28 9JJ
85% historically approved · decision due ~7 Sep
Consent, agreement or approval required by conditions 3 (Samples), 4 (Provision For Contractors), 9 (Highway Condition Survey), 12 (Crossing) and 14 (Basic Protection of Trees/Hedges/Bushes) to planning application 24/02001/FU
Awaiting decision Conditions Trees
Other full applications
In Leeds
-
26/04872/FU Awaiting decision
56 - 58 Brussels Street Leeds LS9 8AB
Retrospective change of use to allow for part sui generis bar and live music venue use in the evenings
-
26/04840/FU Awaiting decision
Chapel Allerton Methodist Church Town Street Chapel Allerton Leeds LS7 4NB
Installation of photovoltaic panels and two air source heat pumps; replacement entrance doors and shutters; internal alterations to form an ancillary cafe and seating area
-
26/04780/FU Awaiting decision
11 Meadow Road Garforth Leeds LS25 2EN
Increase in size to dormer window to front; bi-fold doors to rear
-
26/03285/FU Refused
The Grove London Lane Rawdon Leeds LS19 6BR
Deconstruction of existing boundary wall and rebuilding with a bridged section to accommodate tree growth
-
26/04683/FU Awaiting decision
11 Woodbine Terrace Claremont Road Headingley Leeds LS6 4AF
Retrospective application for the Installation of ground mounted air source heat pump