Skip to content
PlanIndex Get alerts
Menu

Planning application

Bourne House Scotland Lane Horsforth Leeds LS18 5SE

Granted Leeds 23/01091/COND Discharge of Conditions

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Consent, agreement or approval required by condition 3 of Planning Application 22/04540/FU

As published by the council, reference 23/01091/COND

Application record

Reference
23/01091/COND
Type
Discharge of Conditions
Status
Decided
Decision
Approved
Received
20 Feb 2023
Validated
20 Feb 2023
Decided
12 Apr 2023
Ward
Horsforth
Parish
Horsforth Town Council
Decision by
Delegated Decision
Postcode
LS18 5SE

Timeline

Dates from the published record

  1. 20 Feb 2023

    Received by Leeds

  2. 12 Apr 2023

    Decision issued: Approved

  3. 13 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Leeds granted permission on 12 April 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • The Hawthorns Scotland Lane Horsforth Leeds LS18 5SE

    26/04410/CLP Submitted 14 Aug 2026 38m away

    80% historically approved · decision due ~9 Oct

    Certificate of Proposed Lawful Development for 2x dormer windows to the side and rear

    Awaiting decision Lawful development Loft or dormer Windows or glazing
  • Oak House North Road Horsforth Leeds LS18 5HG

    25/05132/TR Submitted 1 Sep 2025 92m away

    T3 Copper Beech - To remove to ground level. Reason: evidence of Meripilus Giganteus in the base of the tree and weak foliage cover throughout the crown. Replace with std Lime 10-12 (green spire)

    Granted Trees 4 docs
  • The Meadows North Road Horsforth Leeds LS18 5HG

    26/03681/FU Submitted 30 Jun 2026 119m away

    83% historically approved · decision due ~25 Aug

    Variation of condition 2 (approved plans) to previously approved planning application 24/04691/FU (Side and rear extensions; hip to gable roof alteration, the addition of front, side and rear dormers and various fenestration changes; change of use of adopted highway to private highway (shared)) for alterations including additional roof lights, changes to the design of the dormers including the addition of pitched roofs and amended external render and stone finishes and detailing

    Awaiting decision Extension Loft or dormer +1
  • Westfield North Road Horsforth LS18 5HG

    25/04835/FU Submitted 19 Aug 2025 130m away

    Demolition of garage, conservatory, porch, rear extension, and stable block; part two storey, part single storey wraparound extension to front, side and rear including a new double garage with balcony over; balcony with glass balustrade to side at first floor; remodel of driveway to side; dormer window to rear, rooflights to front

    Decided Full applications Extension Loft or dormer +2 24 docs
    Small domestic
  • Ladybower Scotland Lane Horsforth Leeds LS18 5SF

    26/03085/FU Submitted 17 Jun 2026 152m away

    Single storey rear extension with new decking and stairs; raising of ridge height to form rooms in roof space and addition of roof lights to side; additional windows to side

    Granted Full applications Extension Loft or dormer +2 10 docs
    Small domestic
  • The Bungalow Farm Scotland Lane Horsforth Leeds LS18 5SF

    25/04938/FU Submitted 22 Aug 2025 182m away

    Demolition of existing buildings, amendment of levels and construction of new build dwelling and associated landscaping.

    Refused Full applications New dwelling Demolition 30 docs
    Domestic

In Leeds

  • 26/04807/COND Awaiting decision

    Borlocco House Church Street Boston Spa Wetherby LS23 6DN

    Consent, agreement or approval required by condition 9 (Hard and soft landscaping details) of Planning Application 23/06508/FU

    3 Sep 2026 Conditions
  • 26/04829/COND Awaiting decision

    The Swinnow Swinnow Lane Swinnow Leeds LS13 4QX

    Consent agreement or approval required by conditions 12 (phase 1), 13 (remediation strategy) and 14 (verification report) of planning application 25/01698/FU

    3 Sep 2026 Conditions
  • 26/04834/COND Awaiting decision

    150 Stoney Rock Lane Burmantofts Leeds LS9 7BL

    Consent, agreement or approval required by conditions 2 (Contaminated land report), 3 (Remediation Statement), 4 (Verification report), 6 (Landscape works) and 8 (Off-site highway works) of Planning Application 25/05008/FU

    3 Sep 2026 Conditions
  • 26/04522/COND Awaiting decision

    147 Holmsley Lane Woodlesford Leeds LS26 8SB

    Consent agreement or approval required by conditions 6 (arboricultural method statement), 7 (hard and soft landscaping) and 8 (retention of trees) of planning application 23/07276/FU

    2 Sep 2026 Conditions
  • 26/04546/COND Awaiting decision

    Old Mill Business Park Gibraltar Island Road Hunslet Leeds LS10 1RJ

    Consent, agreement or approval required by conditions 17 (Submission Study - Report - Strategy) and 24 (Lighting) of Planning Application 25/00978/FU

    Conditions