Skip to content
PlanIndex Get alerts
Menu

Planning application

Xanadu Harewood Road Collingham Wetherby LS22 5BZ

Granted Leeds 23/00181/FU Full Planning Application

Works: Extension Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of existing car ports to front; Alterations including first floor extension with pitched roof above, lower ground floor single storey rear extension with balustrade forming terrace above

As published by the council, reference 23/00181/FU

Application record

Reference
23/00181/FU
Type
Full Planning Application
Status
Decided
Decision
Approved
Received
23 Jan 2023
Validated
23 Jan 2023
Decided
19 Apr 2023
Ward
Harewood
Parish
Collingham-with-Linton Parish Council
Decision by
Delegated Decision
Postcode
LS22 5BZ

Timeline

Dates from the published record

  1. 23 Jan 2023

    Received by Leeds

  2. 19 Apr 2023

    Decision issued: Approved

  3. 3 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

21 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • White Cottage Harewood Road Collingham Wetherby LS22 5BZ

    11/00550/COND Submitted 7 Feb 2011 18m away

    Consent, agreement or approval required by conditions 3 and 4 of Planning Application 08/00439/FU

    Granted Conditions 1 doc
  • White Cottage Harewood Road East Keswick Leeds LS22 5BZ

    08/03241/COND Submitted 22 Jun 2009 18m away

    Consent, agreement or approval required by conditions 15 and 17 of Planning Application 07/05256/FU

    Split decision Conditions
  • Alresford Harewood Road Collingham Wetherby LS22 5BZ

    26/04609/FU Submitted 26 Aug 2026 18m away

    83% historically approved · decision due ~21 Oct

    Demolition of existing side extension and outbuilding; single-storey side extension; new detached garage and outbuilding; new driveway and landscaping to front

    Awaiting decision Extension Demolition 16 docs
    Small domestic
  • Spinney Close Harewood Road Collingham Wetherby LS22 5BZ

    26/03277/COND Submitted 10 Jun 2026 18m away

    84% historically approved · decision due ~5 Aug

    Consent agreement or approval required by conditions 4 (statement of construction practice), 8 (phase II site investigation), 11 (foul drainage scheme), 12 (surface water drainage), 14 (bat and bird roosting), 16 (arboricultural method statement) and 17 (hard and soft landscaping) of planning application 25/04840/FU

    Decided Conditions
  • Langdale Harewood Road Collingham Wetherby LS22 5BZ

    26/02287/FU Submitted 30 Apr 2026 87m away

    Erection of single storey detached garage to front and extension of front hardstanding.

    Granted Full applications Extension 6 docs
    Small domestic
  • Shrewton House Harewood Road Collingham Wetherby LS22 5BY

    12/03757/COND Submitted 30 Aug 2012 91m away

    Consent, agreement or approval required by conditions 4 and 10 of Planning Application 11/05254/FU

    Granted Conditions

In Leeds

  • 26/02683/FU Granted

    Burton Grange Burton Crescent Headingley Leeds LS6 4DN

    Variation of condition 1 (Approved plans) to previously approved Planning Application 26/00918/FU for the addition of two windows to the North West facing elevation (Elevation 02)

    20 May 2026 Full applications
  • 25/00110/FU Granted

    Land Rear Of 31 Back Lane New Farnley Leeds LS12 5HN

    Demolition of existing barn and replaced with a single dwelling (C3) using the same footprint and massing.

    16 Jan 2025 Full applications
  • 26/04708/FU Awaiting decision

    Howley Beck Cottage 201 Scotchman Lane Morley Leeds LS27 0PA

    Demolition of existing side extensions; construction of part single-storey, part two-storey side and rear extension; conversion of integrated garage to form habitable space; new raised terrace and steps to side

    4 Sep 2026 Full applications
  • 26/04774/FU Awaiting decision

    Former Allotments Off Bruntcliffe Road Morley Leeds LS27 0QQ

    Variation of condtion 2 (approved plans) to approved planning application 26/00905/FU (Variation of condition 2 (Approved Plans) to previously approved application 24/06291/FU (Erection of 45 residential dwellings with associated access and landscaping) to allow updated house types plans to reflect the new developer) for alterations to approved house types and rewording of supporting CEMP document to align with Plan for routes of access to site

    4 Sep 2026 Full applications
  • 26/04771/FU Awaiting decision

    61 - 69 Town Street Horsforth Leeds LS18 5BP

    Alterations associated with fit out of cafe unit, including new louvred grilles, wall mounted condensers to the rear

    3 Sep 2026 Full applications