Skip to content
PlanIndex Get alerts
Menu

Planning application

11 Bridge Court Morley Leeds LS27 0BD

Granted Leeds 17/00032/FU Full Planning Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey side extension

As published by the council, reference 17/00032/FU

Application record

Reference
17/00032/FU
Type
Full Planning Application
Status
Decided
Decision
Approved
Received
3 Jan 2017
Validated
3 Jan 2017
Decided
27 Feb 2017
Ward
Morley South
Parish
Morley Town Council
Decision by
Delegated Decision
Postcode
LS27 0BD

Timeline

Dates from the published record

  1. 3 Jan 2017

    Received by Leeds

  2. 27 Feb 2017

    Decision issued: Approved

  3. 3 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Leeds granted permission on 27 February 2017, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Carriers Arms Glen Road Morley Leeds LS27 9HG

    25/04884/TR Submitted 18 Aug 2025 49m away

    T1, T2 and T3 Sycamore - Crown Raising. Lift crowns to approximately 6m above ground level to clear the building and reduce contact with structure. Remove lower branches carefully to maintain balance and natural form. Crown Reduction of all remaining trees - Reduce overall crown spread by approximately 25%, targeting lateral growth to allow more light into the site and reduce shading of building and garden area. Pruning to be carried out in accordance with BS3998:2010 Tree Work Recommendations to maintain tree health and natural appearance. T4 Poplar - Fell and remove the dead and rotten poplar to ground level. Chip and remove all brush and timber from site. Inspect stump and surrounding ground for signs of fungal spread or soil disturbance. All arisings to be chipped on site and removed, unless otherwise specified. All cuts to be made to appropriate growth points to minimise risk of decay. Works to be scheduled outside main bird nesting season unless an ecological survey confirms no active nests.

    Split decision Trees 10 docs
  • 20 Glen Mount Morley Leeds LS27 9HH

    26/03745/FU Submitted 7 Jul 2026 211m away

    83% historically approved · decision due ~1 Sep

    Demolition of garage to the rear; Erection of outbuilding to the rear

    Decided Demolition
  • 12 Marshall Crescent Morley Leeds LS27 0HB

    25/06565/COND Submitted 10 Nov 2025 261m away

    Consent, agreement or approval of conditions 15 ( Feasibility Study ) and 16 ( Drainage Scheme ) to Planning Application 19/07886/FU

    Granted Conditions 7 docs
  • The Sycamore High Street Morley Leeds LS27 9AW

    23/00534/FU Submitted 27 Jan 2023 263m away

    Three additional bedsit rooms and additional car spaces to existing HMO

    Granted Full applications 11 docs
  • Quarry Court High Street Morley Leeds LS27 0BY

    25/04895/FU Submitted 18 Aug 2025 288m away

    81% historically approved · decision due ~13 Oct

    Conversion of fourth floor store to form six dwellings with associated alterations including dormer windows and rooflights to front and rear; new fourth floor window to side; regularisation of three dwellings to the second floor; creation of residents gym and bike store to ground floor, external seating area and enlarged ground floor lobby

    Awaiting decision Full applications Loft or dormer Windows or glazing 21 docs
    Several homes
  • Sprayquip House St Pauls Street Morley Leeds LS27 9EP

    26/02227/FU Submitted 20 Apr 2026 327m away

    Change of use, redevelopment and partial demolition to form 10no. bedroom HMO with parking, cycle and bin storage; Removal of existing outbuilding

    Refused Full applications Demolition 13 docs

In Leeds

  • 26/02683/FU Granted

    Burton Grange Burton Crescent Headingley Leeds LS6 4DN

    Variation of condition 1 (Approved plans) to previously approved Planning Application 26/00918/FU for the addition of two windows to the North West facing elevation (Elevation 02)

    20 May 2026 Full applications
  • 25/00110/FU Granted

    Land Rear Of 31 Back Lane New Farnley Leeds LS12 5HN

    Demolition of existing barn and replaced with a single dwelling (C3) using the same footprint and massing.

    16 Jan 2025 Full applications
  • 26/04708/FU Awaiting decision

    Howley Beck Cottage 201 Scotchman Lane Morley Leeds LS27 0PA

    Demolition of existing side extensions; construction of part single-storey, part two-storey side and rear extension; conversion of integrated garage to form habitable space; new raised terrace and steps to side

    4 Sep 2026 Full applications
  • 26/04774/FU Awaiting decision

    Former Allotments Off Bruntcliffe Road Morley Leeds LS27 0QQ

    Variation of condtion 2 (approved plans) to approved planning application 26/00905/FU (Variation of condition 2 (Approved Plans) to previously approved application 24/06291/FU (Erection of 45 residential dwellings with associated access and landscaping) to allow updated house types plans to reflect the new developer) for alterations to approved house types and rewording of supporting CEMP document to align with Plan for routes of access to site

    4 Sep 2026 Full applications
  • 26/04771/FU Awaiting decision

    61 - 69 Town Street Horsforth Leeds LS18 5BP

    Alterations associated with fit out of cafe unit, including new louvred grilles, wall mounted condensers to the rear

    3 Sep 2026 Full applications