Planning application
3 Wardell Mews London SW4 0AR
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Certificate of Lawful Development (Proposed) with respect to installation of Air Source Heat Pump at roof level.
As published by the council, reference 26/03228/LDCP
Application record
- Reference
- 26/03228/LDCP
- Status
- Awaiting decision
- Received
- 12 Oct 2026
- Validated
- 4 Nov 2026
- Postcode
- SW4 0AR
Timeline
Dates from the published record
-
12 Oct 2026
Received by Lambeth
-
4 Nov 2026
Validated
Checked as complete and ready for consideration.
-
4 Nov 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 30 December 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Lambeth took a median of 56 days over the applications it decided in the last year.
What happens while it is decided
This application is with Lambeth for determination, against a statutory target of eight weeks. Over the last year Lambeth's median decision took 56 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Lambeth's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Lease Lend Cottage Hannington Road London SW4 0LZ
Demolition of existing buildings and erection of 6 two-storey dwellinghouses to the rear of the properties in Hannington Road with car parking and landscaping
Refused Full applications Demolition 6 docs -
Lease Lend Cottage Hannington Road London SW4 0LZ
Demolition of existing buildings in association with redevelopment of site to contain two x 2 storey dwellings (with basements) and associated car parking and landscaping.
Refused Heritage and listed buildings Demolition 21 docs -
Macaulay Court Macaulay Road London SW4 0QU
Back Communal Area: T1 Sycamore (x1) Crown Reduction Back to Previous Points by Reducing the trees Current Height by up to 3m and Crown Width by up to 2m. T2 Sycamore (x1) Crown Reduction Back to Previous Points by Reducing the trees Current of Height by up to 4.5m and Crown Width by up to 2.5m. T3 Bay Tree (x1) Crown Reduction by Reducing the trees Current Height by up to 3m and Crown Width by up 1m.
Granted Trees 2 docs -
Plot Between Lynwood And Macaulay Court Macaulay Road London
Erection of 3 storey building plus a basement level to provide 4 residential units (2x 2-bed and 2x 3-bed) with green roof and PV panels, together with the provision of cycle and refuse stores, landscaping and boundary treatment.
Withdrawn Full applications 35 docs -
Plot Between Lynwood House And Macaulay Court Macaulay Road London
Southeast Corner of Site opposite Macaulay Road: G1 Two Hornbeam Crown Lift to 3.5m Above Ground Level on ALL Compass Points.
Granted Trees 2 docs -
Plot Between Lynwood And Macaulay Court Macaulay Road London Lambeth SW4 0QS
Approval of details pursuant to Condition 16 (detail drawing) and 17 (materials) for planning permission 22/02604/FUL (Removal of existing swimming pool and erection of 2 storey building with habitable roof top and basement to provide 4 residential units, with refuse/recycling and cycle stores and associated hard and soft landscaping including boundary treatment) dated 20.06.2023.
Granted Conditions 4 docs