Planning application
55-58 Kennington Oval London SE11 5SR
Works: Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Redevelopment of the site, involving the demolition of all existing buildings, to provide three separate blocks ranging from 6 to 8 storeys comprising large-scale purpose-built shared living (co-living) accommodation and conventional C3 residential dwellings, community space, co-living amenity and support space, and education space; accessible car parking, cycle parking, access off Kennington Oval and Ashmole Street, associated amenity, play, public realm landscaping, servicing arrangements, and all associated works.
As published by the council, reference 26/03210/FUL
Application record
- Reference
- 26/03210/FUL
- Category
- Full applications
- Status
- Awaiting decision
- Received
- 2 Nov 2026
- Validated
- 23 Nov 2026
- Ward
- Oval
- Postcode
- SE11 5SR
Comment by 16 December 2026
The council is taking comments on this application until then. Comments go to Lambeth through their own planning portal.
Site history
Applications at this address on the Lambeth register
This site has had 2 applications since 2026.
-
26/03234/EIASCR Awaiting decision
55-58 Kennington Oval London SE11 5SR
Request for a Screening Opinion pursuant to Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the redevelopment of 55-58 Kennington Oval, SE11 5SR involving the demolition of the existing buildings and construction of three residential-led buildings ranging from 6 to 8 storeys, providing 351 residential units (227 co-living studios and 124 C3 dwellings), replacement community space, education space, co-living amenity and support facilities, associated landscaping, play space, public realm works, cycle parking, blue badge parking, and biodiversity enhancements.
Timeline
Dates from the published record
-
2 Nov 2026
Received by Lambeth
-
23 Nov 2026
Validated
Checked as complete and ready for consideration.
-
25 Nov 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 18 January 2027, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Lambeth took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
hgh Consulting Ltd Agent
540 applications on PlanIndex · across 43 councils · 91% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordSecretary Of Duchy Of Cornwall Estate Applicant
2 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
The council's own list, drawings first
156 documents on file for this application
Drawings (65)
- Proposed floor plan
- Proposed floor plan
- Proposed floor plan
- Proposed floor plan
- Proposed floor plan
- Proposed floor plan
- Proposed floor plan
- Proposed floor plan
- Proposed floor plan
- Proposed floor plan
- Proposed floor plan
- Proposed floor plan
- Proposed floor plan
- Proposed floor plan
- Proposed floor plan
- Proposed floor plan
- Proposed floor plan
- Proposed elevations
- Proposed elevations
- Proposed elevations
- Proposed site elevations
- Proposed site elevations
- Proposed site sections
- Proposed section aa
- Proposed section dd
- Proposed sections cc
- Proposed section bb
- Proposed building sections
- Proposed site sections
- Proposed site plan
- Proposed site plan
- Proposed site plan
- Proposed bay studies typical bay study kennington oval
- Proposed bay studies typical bay study woodland garden
- Proposed bay studies typical bay study woodland garden
- Proposed bay studies typical bay study ashmole street
- Proposed bay studies typical bay study central courtyard
- Proposed bay studies typical bay study community space
- Demolition site elevations
- Demolition site elevations
- Demolition site sections
- Demolition site sections
- Soft landscape roof plan general arrangement
- Demolition site plan
- Illustrative masterplan
- Site layout plan
- Landscape general arrangement plan
- Finished levels general arrangement plan
- Soft landscape terraces general arrangement
- Hard landscape general arrangement
- Soft landscape general arrangement
- Site location plan
- Existing building elevations
- Existing building elevations
- Existing building elevations
- Existing building elevations
- Existing building elevations
- Existing building elevations
- Existing site elevations
- Existing site elevations
- Existing site sections
- Existing site sections
- Existing site plan
- Existing site plan
- Existing site plan
Everything on file (156)
- BLOCK B2 CARBON DIOXIDE EMISSIONS
- BLOCK B1 CARBON DIOXIDE EMISSIONS
- PLANNING STATEMENT REV B
- GLA CIRCULAR ECONOMY ASSESSMENT TEMPLATE
- WLCA ASSESSMENT
- HEALTH IMPACT ASSESSMENT REV A
- BLOCK B3 CARBON DIOXIDE EMISSIONS
- SITE WIDE CARBON DIOXIDE EMISSIONS
- THE STATUTORY ENVIRONMENTAL METRIC
- OUTLINE CONSTRUCTION LOGISTICS PLAN REV A
- Supporting Docs
- Supporting Docs
- Supporting Docs
- Supporting Docs
- Supporting Docs
- Supporting Docs
- Supporting Docs
- LANDSCAPE GENERAL ARRANGEMENT PLAN
- FINISHED LEVELS GENERAL ARRANGEMENT PLAN
- PROPOSED B3 FLOOR PLAN - LEVEL 05
- PROPOSED B3 FLOOR PLAN - GROUND FLOOR (LEVEL 00)
- PROPOSED SITE PLAN - TYPICAL FLOOR
- PROPOSED BAY STUDIES, TYPICAL BAY STUDY - KENNINGTON OVAL B1
- PROPOSED BAY STUDIES, TYPICAL BAY STUDY - WOODLAND GARDEN B3
- EXISTING SITE PLAN - FIRST FLOOR
- DEMOLITION SITE PLAN
- DEMOLITION SITE ELEVATIONS - NORTH & WEST
- DESIGN AND ACCESS STATEMENT
- BIODIVERSITY NET GAIN ASSESSMENT
- TRAVEL PLAN
- TREE SURVEY AND ARBORICULTURAL IMPACT ASSESSMENT
- PRELIMINARY ECOLOGICAL APPRAISAL AND PRELIMINARY ROOST ASSESSMENT
- LAND CONTAMINATION ASSESSMENT
- LAND CONTAMINATION ASSESSMENT
- LAND CONTAMINATION ASSESSMENT
- LAND CONTAMINATION ASSESSMENT
- PROPOSED SITE SECTIONS 03 & 04
- PROPOSED B1 SECTION AA
- PROPOSED B1 FLOOR PLAN - ROOF (LEVEL 08)
- PROPOSED B1 FLOOR PLAN - LEVEL 05
- PROPOSED B3 ELEVATIONS
- PROPOSED BAY STUDIES, TYPICAL BAY STUDY - WOODLAND GARDEN B2
- EXISTING BUILDING ELEVATIONS - THE VICARAGE
- EXISTING BUILDING ELEVATIONS - TECH BLOCK
- DAYLIGHT, SUNLIGHT AND OVERSHADOWING REPORT
- DESIGN AND ACCESS STATEMENT
- DESIGN AND ACCESS STATEMENT
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY REPORT
- CO-LIVING OPERATIONAL MANAGEMENT PLAN
- STATEMENT OF COMMUNITY INVOLVEMENT
- STATEMENT OF COMMUNITY INVOLVEMENT
- SUSTAINABLE DESIGN AND CONSTRUCTION STATEMENT FOR PLANNING
- LAND CONTAMINATION ASSESSMENT
- EXISTING UTILITIES ASSESSMENT FOR PLANNING
- ILLUSTRATIVE MASTERPLAN
- PROPOSED B3 SECTION DD
- PROPOSED B2 FLOOR PLAN - GROUND FLOOR (LEVEL 00)
- PROPOSED B1 FLOOR PLAN - AMENITY FLOOR (LEVEL 07)
- PROPOSED B1 FLOOR PLAN - LEVELS 02, 03 & 04
- PROPOSED BAY STUDIES, TYPICAL BAY STUDY - ASHMOLE STREET B2
- EXISTING SITE SECTIONS - 01 & 02
- EXISTING BUILDING ELEVATIONS - MONTGOMERY HAL
- DESIGN AND ACCESS STATEMENT
- BAT EMERGENCE AND RE-ENTRY SURVEY
- TRANSPORT ASSESSMENT
- STATEMENT OF COMMUNITY INVOLVEMENT
- BREEAM V7 NEW CONSTRUCTION COMMUNITY CENTRE PRE-ASSESSMENT REPORT
- WHOLE LIFE CARBON ASSESSMENT
- LAND CONTAMINATION ASSESSMENT
- LAND CONTAMINATION ASSESSMENT
- SOFT LANDSCAPE TERRACES GENERAL ARRANGEMENT
- SITE LOCATION PLAN
- PROPOSED B1 FLOOR PLAN - LEVEL 01
- PROPOSED B2 ELEVATIONS
- EXISTING BUILDING ELEVATIONS - HINTON WING
- DEMOLITION SITE ELEVATIONS - EAST & SOUTH
- AFFORDABLE HOUSING STATEMENT
- DESK BASED ARCHAEOLOGICAL ASSESSMENT
- TOWNSCAPE VISUAL IMPACT ASSESSMENT
- STATEMENT OF COMMUNITY INVOLVEMENT
- STATEMENT OF COMMUNITY INVOLVEMENT
- LAND CONTAMINATION ASSESSMENT
- LAND CONTAMINATION ASSESSMENT
- LAND CONTAMINATION ASSESSMENT
- LAND CONTAMINATION ASSESSMENT
- APPLICATION FORM - WITHOUT PERSONAL DATA
- PROPOSED B2 SECTIONS CC
- PROPOSED B2 SECTION BB
- PROPOSED B2 FLOOR PLAN - LEVELS 02, 03 & 04
- PROPOSED B1 FLOOR PLAN - LEVEL 06
- PROPOSED B1 ELEVATIONS
- PROPOSED SITE ELEVATIONS - NORTH & WEST
- EXISTING BUILDING ELEVATIONS - MAIN BLOCK (WEST & SOUTH)
- EXISTING BUILDING ELEVATIONS - MAIN BLOCK (NORTH AND EAST)
- INTERNAL DAYLIGHT, SUNLIGHT AND OVERSHADOWING REPORT
- DESIGN AND ACCESS STATEMENT
- NOISE IMPACT ASSESSMENT
- STATEMENT OF COMMUNITY INVOLVEMENT
- BREEAM V7 NEW CONSTRUCTION EDUCATION PRE-ASSESSMENT REPORT
- DESIGN AND ACCESS STATEMENT
- LAND CONTAMINATION ASSESSMENT
- ENERGY STATEMENT FOR PLANNING
- LAND CONTAMINATION ASSESSMENT
- HARD LANDSCAPE GENERAL ARRANGEMENT
- SOFT LANDSCAPE ROOF PLAN GENERAL ARRANGEMENT
- PROPOSED B3 FLOOR PLAN - LEVELS 01, 02, 03 & 04
- PROPOSED BUILDING SECTIONS - B2
- PROPOSED SITE PLAN - ROOF
- EXISTING SITE ELEVATIONS - EAST & SOUTH
- EXISTING SITE SECTIONS - 03 & 04
- DEMOLITION SITE SECTIONS - 01 & 02
- COMMUNITY INFRASTRUCTURE LEVY - COMPLETED FORM
- DESIGN AND ACCESS STATEMENT
- DESIGN AND ACCESS STATEMENT
- COMMUNITY SPACE MANAGEMENT PLAN
- COMMUNITY SPACE STRATEGY
- LAND CONTAMINATION ASSESSMENT
- LAND CONTAMINATION ASSESSMENT
- LAND CONTAMINATION ASSESSMENT
- LAND CONTAMINATION ASSESSMENT
- PROPOSED SITE SECTIONS 01 & 02
- PROPOSED B3 FLOOR PLAN - ROOF (LEVEL 06)
- PROPOSED B2 FLOOR PLAN - LEVEL 05
- PROPOSED B2 FLOOR PLAN - LEVEL 01
- PROPOSED BAY STUDIES, TYPICAL BAY STUDY - CENTRAL COURTYARD B1
- EXISTING SITE ELEVATIONS - NORTH & WEST
- EXISTING SITE PLAN - GROUND FLOOR
- DESIGN AND ACCESS STATEMENT
- DESIGN AND ACCESS STATEMENT
- LONDON PLAN FIRE STATEMENT
- HERITAGE STATEMENT
- PHASE 1 DESK STUDY: MONTGOMERY HAL
- HISTORICAL MAPS
- LAND CONTAMINATION ASSESSMENT
- LAND CONTAMINATION ASSESSMENT
- CIRCULAR ECONOMY ASSESSMENT
- SOFT LANDSCAPE GENERAL ARRANGEMENT
- SITE LAYOUT PLAN
- PROPOSED SITE PLAN - GROUND FLOOR
- PROPOSED B2 FLOOR PLAN - ROOF (LEVEL 06)
- PROPOSED B1 FLOOR PLAN - GROUND FLOOR (LEVEL 00)
- PROPOSED B1 FLOOR PLAN - BASEMENT (LEVEL B1)
- PROPOSED SITE ELEVATIONS - EAST & SOUTH
- PROPOSED BAY STUDIES, TYPICAL BAY STUDY - COMMUNITY SPACE B3
- EXISTING SITE PLAN - ROOF PLAN
- DEMOLITION SITE SECTIONS - 03 & 04
- AIR QUALITY ASSESSMENT
- DESIGN AND ACCESS STATEMENT
- PLANNING GATEWAY ONE FIRE STATEMENT
- OUTLINE EMPLOYMENT AND SKILLS PLAN
- STATEMENT OF COMMUNITY INVOLVEMENT
- HISTORICAL MAPPING
- LAND CONTAMINATION ASSESSMENT
- LAND CONTAMINATION ASSESSMENT
- LAND CONTAMINATION ASSESSMENT
- COVERING LETTER
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you the drawings on every job in your area. 14 days free.
What happens while it is decided
This application is with Lambeth for determination, against a statutory target of eight weeks. Over the last year Lambeth decided full applications in a median of 66 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
55-58 Kennington Oval London SE11 5SR
84% historically approved · decision due ~18 Jan
Request for a Screening Opinion pursuant to Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the redevelopment of 55-58 Kennington Oval, SE11 5SR involving the demolition of the existing buildings and construction of three residential-led buildings ranging from 6 to 8 storeys, providing 351 residential units (227 co-living studios and 124 C3 dwellings), replacement community space, education space, co-living amenity and support facilities, associated landscaping, play space, public realm works, cycle parking, blue badge parking, and biodiversity enhancements.
Awaiting decision Demolition -
The Roebuck 84 Ashmole Street London SW8 1NE
Approval of details pursuant to conditions 6 (hard and soft landscaping), 9 (Energy Strategy) and 10 (water consumption) of Planning Permission Ref: 21/00977/FUL (Erection of a first floor rear and side extension and change of use from public house (sui generis) to provide 3 self-contained dwellings (Use Class C3) with private gardens to rear.) granted on 28.02.2022 (REVISED LANDSCAPE DETAILS SUBMITTED 20/02)
-
The Roebuck 84 Ashmole Street London SW8 1NE
Approval of details pursuant to Condition 8 (Arboricultural Method Statement), 11 (communal areas and accesses), 15 (Secured by Design standards) and 16 (SuDS management and maintenance plan) of planning permission 21/00977/FUL (Erection of a first floor rear and side extension and change of use from public house (sui generis) to provide 3 self-contained dwellings (Use Class C3) with private gardens to rear) granted on 28.02.2022.
Granted Conditions Extension 10 docs -
The Roebuck 84 Ashmole Street London Lambeth SW8 1NE
Approval of details pursuant to the discharge of condition 13 (CEMP) of Planning Permission 21/00977/FUL (Erection of a first floor rear and side extension and change of use from public house (sui generis) to provide 3 self-contained dwellings (Use Class C3) with private gardens to rear.) granted on 28.02.2022
Granted Conditions Extension 4 docs -
88 Claylands Road London Lambeth SW8 1NJ
To remove 1 x Dawn Redwood tree to rear of property.
Granted Trees 2 docs -
88 Claylands Road London SW8 1NJ
To crown reduce 1 x Redwood tree to rear of property by 25%.
Granted Trees 1 doc
Other full applications
In Lambeth
-
26/02567/FUL Refused
13 Berwyn Road London Lambeth SE24 9BD
Erection of a ground floor rear and side extension with a first floor and second floor rear extension.
-
26/02824/FUL Granted
Rotary Lodge 4 Chatsworth Way London SE27 9HP
Replacement of the existing windows across all elevations with new uPVC framed double glazed windows, together with the replacement of the existing timber doors with a combination of composite and uPVC doors.
-
26/02822/FUL Granted
135 Gipsy Road London Lambeth SE27 9QT
Replacement of the existing timber windows and doors, with new uPVC framed double glazed windows and composite front entrance doors and uPVC rear doors.
-
26/02469/FUL Granted
97 Stamford Street London SE1 9NN
Replacement of the existing lead roof covering with a new lead roof covering on a like-for like basis.
-
26/03462/FUL Awaiting decision
6 Hurst Street London SE24 0EG
Erection of a mansard roof extension incorporating a rear dormer roof extension, together with the installation of three rooflights to the front roof slope.