Planning application
11, 12, 13, 24 And 25 Ramilles Close, At Blenheim Gardens Estate London SW2
Works: Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Retrofit measures installed to existing dwellinghouses. Measures include replacement of windows and doors, and fabric upgrades to roof, including replacement of roof finishings, and replacement of light wells in main roof.
As published by the council, reference 26/02220/FUL
Application record
- Reference
- 26/02220/FUL
- Category
- Full applications
- Status
- Awaiting decision
- Received
- 31 Jul 2026
- Validated
- 10 Sep 2026
- Ward
- Brixton Acre Lane
Site history
Applications at this address on the Lambeth register
This site has had 2 applications since 2026.
-
26/02220/RG3 Awaiting decision
11, 12, 13, 24 And 25 Ramilles Close, At Blenheim Gardens Estate London SW2
Retrofit measures installed to existing dwellinghouses. Measures include replacement of windows and doors, and fabric upgrades to roof, including replacement of roof finishings, and replacement of light wells in main roof.
Timeline
Dates from the published record
-
31 Jul 2026
Received by Lambeth
-
10 Sep 2026
Validated
Checked as complete and ready for consideration.
-
11 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 5 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Lambeth took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Constructive Thinking Studio Ltd Agent, registered in Liverpool
Active · incorporated 2003 · Liverpool
478 applications on PlanIndex · across 9 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
- AMENDED INTERNAL AND EXTERNAL WORKS
- INTERNAL AND EXTERNAL WORKS
- AMENDED: INTERNAL AND EXTERNAL WORKS
- AMENDMENT : APPLICATION FORM - WITHOUT PERSONAL DATA
- AMENDMENT : EXTERNAL WORKS
- INTERNAL AND EXTERNAL WORKS
- AMENDMENT : DELTA SUMMARY
- OS MAP
- INTERNAL AND EXTERNAL MEASUREMENTS
- INTERNAL AND EXTERNAL WORKS
- INTERNAL AND EXTERNAL WORKS
- COMMUNITY INFRASTRUCTURE LEVY - COMPLETED FORM
- OS MAP
- APPLICATION FORM - WITHOUT PERSONAL DATA
- INTERNAL AND EXTERNAL WORKS
- INTERNAL AND EXTERNAL WORKS
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Lambeth for determination, against a statutory target of eight weeks. Over the last year Lambeth decided full applications in a median of 62 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Lambeth
-
26/02089/FUL Granted
135 Sternhold Avenue London SW2 4PF
Erection of a rear dormer extension including the addition of three roof lights to the front and a second floor single storey rear extension including the formation of a terrace (flat 3).
-
26/02082/FUL Refused
4 Fernwood Avenue London Lambeth SW16 1RD
Erection of a ground floor rear single storey extenson.
-
26/01870/FUL Granted
57 Iveley Road London SW4 0EN
Enlargement of existing side lightwell and window. Excavation of existing basement with the formation of a front lightwell - Flat 1.
-
26/01813/FUL Refused
46 - 48 Norwood High Street London SE27 9NR
Erection of mansard roof extension to both 46 and 48 Norwood.
-
26/02607/FUL Awaiting decision
21 Tremadoc Road London SW4 7NF
Change of use of existing property from a dwellinghouse (Use Class C3) to a 9 -person HMO (Sui-Generis) together with the erection of a single storey ground floor rear extension. Erection of rear dormer roof extension; dormer roof extension over existing rear outrigger; installation of 3 x rooflights to the front roof slope together with the provision of cycle and bin storage.