Planning application
Units 1-6 Citadel Place London SE11 5EF
Works: New dwelling Demolition Several homes
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Phased redevelopment of 1-6 Citadel Place including demolition and provision of residential uses (Class C3) and flexible commercial uses at ground floor (Class E) with associated landscaping, access, car parking and other works. Reconsultation for the following amendments: -Addition of seven (7) flats -Amendments to Building C facade, material selection, and removal of some winter gardens. -Landscaping amendments
As published by the council, reference 26/00601/FUL
Application record
- Reference
- 26/00601/FUL
- Type
- Full Planning Permission
- Status
- Awaiting decision
- Received
- 25 Feb 2026
- Validated
- 25 Feb 2026
- Ward
- Vauxhall
- Postcode
- SE11 5EF
Site history
Applications at this address on the Lambeth register
This site has had 2 applications since 2025: 1 approved, 0 refused.
-
25/03336/EIASCR Granted
Units 1-6 Citadel Place London SE11 5EF
Request for a Screening Opinion in respect of an Environmental Impact Assessment (EIA) pursuant to Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations, 2017 for a proposed development comprising demolition of existing buildings and the provision of up to 600 residential units; and associated landscaping, access, car parking (accessible spaces only) and other engineering works.
Timeline
Dates from the published record
-
25 Feb 2026
Received by Lambeth
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 22 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Lambeth took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Boyer Planning Ltd Agent, a planning consultancy registered in Camberley
Active · incorporated 1990 · Camberley
241 applications on PlanIndex · across 71 councils · 89% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordLondon Square Devco 2 Ltd (London Square) And CLS Spring Applicant
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
429 documents on file for this application
- FIRST ADDENDUM
- SECOND ADDENDUM
- OVERHEATING NOTE
- GLARE ASSESSMENT
- UPDATED FIRE STATEMENT
- REVISED WIND ASSESSMENT
- DESIGN NOTE ON TERRACE WIND CONDITIONS
- LANDSCAPE ROOF PLAN
- LEVEL 8 FLOOR PLAN
- LEVEL 19 FLOOR PLAN
- LEVEL 21 FLOOR PLAN
- COURTYARD WEST ELEVATION
- JONATHAN YARD SOUTH ELEVATION
- DESIGN AND ACCESS STATEMENT ADDENDUM
- LEVEL 6 FLOOR PLAN
- LEVEL 7 FLOOR PLAN
- LEVEL 18 FLOOR PLAN
- LEVEL 20 FLOOR PLAN
- SPRING MEWS WEST ELEVATION
- JONATHAN YARD NORTH ELEVATION
- BLOCK A1 TERRACE PLAN
- LEVEL 9 FLOOR PLAN
- LEVEL 10 FLOOR PLAN
- LEVEL 15 FLOOR PLAN
- COURTYARD EAST ELEVATION
- COURTYARD SOUTH ELEVATION
- LEVEL 4 FLOOR PLAN
- LEVEL 5 FLOOR PLAN
- ROOF PLAN
- SECTION BB
- SECTION EE
- SECTION GG
- EAST ELEVATION
- SPRING MEWS EAST ELEVATION
- BLOCK A1 PODIUM PLAN
- LEVEL 3 FLOOR PLAN
- LEVEL 11 FLOOR PLAN
- LEVEL 16 FLOOR PLAN
- LEVEL 22 FLOOR PLAN
- NORTH ELEVATION
- GROUND FLOOR LANDSCAPE PLAN
- BASEMENT FLOOR PLAN
- LEVEL 17 FLOOR PLAN
- SECTION AA
- SECTION FF
- WEST ELEVATION
- COURTYARD NORTH ELEVATION
- GROUND FLOOR PLAN
- LEVEL 14 FLOOR PLAN
- SECTION CC
- LEVEL 1 FLOOR PLAN
- LEVEL 2 FLOOR PLAN
- LEVEL 12 FLOOR PLAN
- LEVEL 13 FLOOR PLAN
- SECTION DD
- SOUTH ELEVATION
- SUDS PRO-FORMA
- PRELIMINARY INVESTIGATION REPORT - PART 4
- PRELIMINARY INVESTIGATION REPORT - PART 6
- WIND MICROCLIMATE REPORT - CFD STUDY - PART 3
- REFURBISHMENT OF EXISTING OFFICES - MARKET REPORT - PART 2
- HERITAGE, TOWNSCAPE & VISUAL IMPACT ASSESSMENT - PART 3
- HERITAGE, TOWNSCAPE & VISUAL IMPACT ASSESSMENT - PART 5
- ACTIVE TRAVEL ZONE ASSESSMENT (ATZ)
- INTEREST SCHEDULE
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- STATEMENT OF COMMUNITY INVOLVEMENT
- PRELIMINARY INVESTIGATION REPORT - PART 1
- DRAINAGE ASSESSMENT REPORT - PART 2
- DRAINAGE ASSESSMENT REPORT - PART 4
- FLOOD RISK ASSESSMENT - PART 7
- HERITAGE, TOWNSCAPE & VISUAL IMPACT ASSESSMENT - PART 2
- VAUXHALL TAKE-UP AVAILABILITY TRACKER
- SUSTAINABILITY STATEMENT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- PRELIMINARY INVESTIGATION REPORT - PART 8
- PRELIMINARY INVESTIGATION REPORT - PART10
- ARBORICULTURAL IMPACT ASSESSMENT
- WIND MICROCLIMATE REPORT - CFD STUDY - PART 1
- HERITAGE, TOWNSCAPE & VISUAL IMPACT ASSESSMENT - PART 7
- TRAVEL PLAN
- PARKING MANAGEMENT PLAN
- CONTRUCTION LOGISTICS PLANS
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- PRELIMINARY INVESTIGATION REPORT - PART 3
- PRELIMINARY INVESTIGATION REPORT - PART 5
- REFURBISHMENT OF EXISTING OFFICES - MARKET REPORT - PART 1
- REFURBISHMENT OF EXISTING OFFICES - MARKET REPORT - PART 3
- HERITAGE, TOWNSCAPE & VISUAL IMPACT ASSESSMENT - PART 4
- HERITAGE, TOWNSCAPE & VISUAL IMPACT ASSESSMENT - PART 6
- OUTLINE EMPLOYMENT AND SKILLS PLAN
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- LAMBETH SOCIAL INFRASTRUCTURE IMPACT ASSESSMENT
- PRELIMINARY INVESTIGATION REPORT - PART 2
- PRELIMINARY INVESTIGATION REPORT - PART 9
- AIR QUALITY ASSESSMENT
- DRAINAGE ASSESSMENT REPORT - PART 1
- FLOOD RISK ASSESSMENT - PART 1
- HERITAGE, TOWNSCAPE & VISUAL IMPACT ASSESSMENT - PART 1
- CIRCULAR ECONOMY STATEMENT
- OPERATIONAL WASTE MANAGEMENT PLAN
- OUTLINE CONSTRUCTION LOGISTICS PLAN
- UTILITIES STRATEGY
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- NOISE IMPACT ASSESSMENT REPORT
- PRELIMINARY INVESTIGATION REPORT - PART 7
- WIND MICROCLIMATE REPORT - CFD STUDY - PART 2
- DRAINAGE ASSESSMENT REPORT - PART 3
- FLOOD RISK ASSESSMENT - PART 6
- ENERGY STATEMENT
- DELIVERY & SERVICING PLAN
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- APPLICATION FORM - WITHOUT PERSONAL DATA
- SITE WASTE MANAGEMENT PLAN
- METHOD STATEMENT
- FLOOD RISK ASSESSMENT - PART 4
- FLOOD RISK ASSESSMENT - PART 5
- BRUKL OUTPUT DOCUMENT - BE GREEN
- BRUKL OUTPUT DOCUMENT - BE LEAN
- WHOLE LIFE-CYCLE CARBON ASSESSMENT
- GLA- WHOLE LIFE CYCLE CARBON (WLC) ASSESSMENT TEMPLATE
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- GLA CARBON EMISSION REPORTING SPREADSHEET
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- ARCHAEOLOGICAL DESK-BASED ASSESSMENT
- TREE SURVEY
- FLOOD RISK ASSESSMENT - PART 2
- FLOOD RISK ASSESSMENT - PART 3
- TRANSPORT ASSESSMENT
- FIRE STATEMENT (LONDON PLAN & GATEWAY ONE)
- VENTILATION AND EXTRACTION STATEMENT
- FULL SAP CALCULATION PRINTOUT -
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- FULL SAP CALCULATION PRINTOUT
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- PART 7
- DAYLIGHT, SUNLIGHT & OVERSHADOWING REPORT - PART 2
- BUILDING A1 UPPER LEVELS - BAY STUDIES
- ELEVATION COURTYARD NORTH - GENERAL ARRANGEMENT
- BLOCK A AND BLOCK D TERRACES - GENERAL ARRANGEMENT SECTIONS
- BLOCK A1 TERRACE LANDSCAPE PLAN - GENERAL ARRANGEMENT PLANS
- BLOCK B AND BLOCK C TERRACES - GENERAL ARRANGEMENT SECTIONS
- LEVEL 04 - GENERAL ARRANGEMENT PLANS
- LEVEL 06 - GENERAL ARRANGEMENT PLANS
- LEVEL 21 - GENERAL ARRANGEMENT PLANS
- ROOF - GENERAL ARRANGEMENT PLANS
- EXISTING ELEVATIONS NORTH & WEST - GENERAL ARRANGEMENT
- EXISTING SITE PLAN
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- PART 6
- DAYLIGHT, SUNLIGHT & OVERSHADOWING REPORT - PART 1
- BUILDING A2 UPPER LEVELS - BAY STUDIES
- ELEVATION COURTYARD EAST - GENERAL ARRANGEMENT
- BLOCK A PODIUM LANDSCAPE PLAN - GENERAL ARRANGEMENT PLANS
- BLOCK A2 TERRACE LANDSCAPE PLANS - GENERAL ARRANGEMENT PLANS
- LEVEL 05 - GENERAL ARRANGEMENT PLANS
- LEVEL 07 - GENERAL ARRANGEMENT PLANS
- LEVEL 22 - GENERAL ARRANGEMENT PLANS
- SECTION AA - GENERAL ARRANGEMENT SECTIONS
- EXISTING ELEVATIONS - CITADEL PLACE
- EXISTING ELEVATIONS SOUTH & EAST - GENERAL ARRANGEMENT
- PROPOSED BLOCK PLAN
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- DAYLIGHT, SUNLIGHT & OVERSHADOWING REPORT - PART 3
- DAYLIGHT, SUNLIGHT & OVERSHADOWING REPORT - PART 5
- MEWS HOUSES - BAY STUDIES
- BUILDING C LOWER LEVELS - BAY STUDIES
- BLOCK B TERRACE LANDSCAPE PLAN - GENERAL ARRANGEMENT PLANS
- BLOCK D TERRACE LANDSCAPE PLAN - GENERAL ARRANGEMENT PLANS
- LEVEL 01 - GENERAL ARRANGEMENTS PLANS
- LEVEL 03 - GENERAL ARRANGEMENT PLANS
- SECTION CC - GENERAL ARRANGEMENT SECTIONS
- SECTION EE - GENERAL ARRANGEMENT SECTIONS
- DEMOLITION ELEVATION NORTH & WEST - GENERAL ARRANGEMENT
- EXISTING BASEMENT PLAN
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- PART 3
- PART 5
- ELEVATION COURTYARD WEST - GENERAL ARRANGEMENT
- ELEVATION JONATHAN YARD NORTH - GENERAL ARRANGEMENT
- ELEVATION SPRING MEWS WEST - GENERAL ARRANGEMENT
- THE STATUTORY BIODIVERSITY METRIC
- LEVEL 08 - GENERAL ARRANGEMENT PLANS
- LEVEL 10 - GENERAL ARRANGEMENT PLANS
- LEVEL 17- GENERAL ARRANGEMENT PLANS
- LEVEL 19 - GENERAL ARRANGEMENT PLANS
- PROPOSED SITE PLAN
- THE LOCATION PLAN
- APPENDICES_PART_6
- LANDSCAPE ROOF PLAN - GENERAL ARRANGEMENT PLANS
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- PART 2
- DAYLIGHT, SUNLIGHT & OVERSHADOWING REPORT - PART 6
- BUILDING LOWER LEVELS - BAY STUDIES
- ELEVATION COURTYARD SOUTH - GENERAL ARRANGEMENT
- DOCUMENT REGISTER
- BLOCK C TERRACE LANDSCAPE PLAN - GENERLA ARRANGEMENTS PLANS
- GROUND FLOOR - GENERAL ARRANGEMENTS PLANS
- LEVEL 11 - GENERAL ARRANAGEMENT PLANS
- LEVEL 18 - GENERAL ARRANGEMENT PLANS
- SECTION BB - GENERAL ARRANGEMENT SECTIONS
- EXISTING BLOCK PLAN
- SITE DEMOLITION PLAN
- APPENDICES_PART_5
- SUMMARY FOR INPUT DATA
- EQUALITY IMPACT ASSESSMENT
- PART 4
- DAYLIGHT, SUNLIGHT & OVERSHADOWING REPORT - PART 4
- PLANNING STATEMENT
- BUILDING B UPPER LEVELS - BAY STUDIES
- ELEVATION EAST - GENERAL ARRANGEMENT
- ELEVATION WEST - GENERAL ARRANGEMENT
- URBAN GREENING FACTOR CALCULATOR
- LEVEL 02 - GENERAL ARRANGEMENT PLANS
- LEVEL 09 - GENERAL ARRANGEMENT PLANS
- LEVEL 20 - GENERAL ARRANGEMENT PLANS
- SECTION DD - GENERAL ARRANGEMENT SECTIONS
- DEMOLITION ELEVATIONS SOUTH & EAST - GENERAL ARRANGEMENT
- DOCUMENT REGISTER
- COVERING LETTER
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- SUMMARY FOR INPUT DATA
- HEALTH IMPACT ASSESSMENT
- PRELIMINARY ECOLOGICAL APPRAISAL
- DAYLIGHT, SUNLIGHT & OVERSHADOWING REPORT - PART 9
- DAYLIGHT, SUNLIGHT & OVERSHADOWING REPORT - PART10
- ELEVATION JONATHAN YARD SOUTH - GENERAL ARRANGEMENT
- ELEVATION SPRING MEWS EAST - GENERAL ARRANGEMENT
- COURTYARDS & MEWS - GENERAL ARANGEMENT SECTIONS
- GROUND FLOOR LANDSCAPE PLAN - GENERAL MANAGEMENT PLANS
- LEVEL 14 - GENERAL ARRANGEMENT PLANS
- LEVEL 15 - GENERAL ARRANGEMENT PLANS
- SECTION FF - GENERANL ARRANGEMENT SECTIONS
- DEMOLITION ELEVATIONS - CITADEL PLACE
- APPENDICES_PART_1
- APPENDICES_PART_2
- PRE-REDEVELOPMENT AUDIT
- SUMMARY FOR INPUT DATA
- BIODIVERSITY STATEMENT & DRAFT BIODIVERSITY GAIN PLAN
- PART 1
- DAYLIGHT, SUNLIGHT & OVERSHADOWING REPORT - PART 7
- DAYLIGHT, SUNLIGHT & OVERSHADOWING REPORT - PART 8
- ELEVATION NORTH - GENERAL ARRANGEMENT
- ELEVATION SOUTH - GENERAL ARRANGEMENT
- COMMUNITY INFRASTRUCTURE LEVY - COMPLETED FORM
- BASEMENT FLOOR- GENERAL MANAGEMENT PLANS
- LEVEL 12 - GENERAL ARRANGEMENT PLANS
- LEVEL 13 - GENERAL ARRANGEMENT PLANS
- LEVEL 16 - GENERAL ARRANGEMENT PLANS
- SECTION GG - GENERAL ARRANGEMENT SECTIONS
- BASEMENT DEMOLITION PLAN
- APPENDICES_PART_3
- APPENDICES_PART_4
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Lambeth for determination, against a statutory target of eight weeks. Over the last year Lambeth decided full applications in a median of 66 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
1 - 2 Citadel Place Lambeth London SE11 5EF
Phased redevelopment of 1-6 Citadel Place including demolition and provision of residential uses (Class C3) and flexible commercial uses at ground floor (Class E) with associated landscaping, access, car parking and other works.
Decided Demolition 5 docs -
1 - 2 Citadel Place Lambeth London SE11 5EF
89% historically approved · decision due ~3 Aug
Phased redevelopment of 1-6 Citadel Place including demolition and provision of residential uses (Class C3) and flexible commercial uses at ground floor (Class E) with associated landscaping, access, car parking and other works.
Awaiting decision Demolition -
1 And 2 Citadel Place London SE11 5EF
Request for a Screening Opinion in respect of an Environmental Impact Assessment (EIA) pursuant to Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations, 2017 for a proposed development comprising demolition of existing buildings and the provision of up to 550 residential units; and associated landscaping, access, car parking (accessible spaces only) and other engineering works.
Decided Outline Demolition 2 docs -
Units 1-6 Citadel Place London SE11 5EF
Request for a Screening Opinion in respect of an Environmental Impact Assessment (EIA) pursuant to Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations, 2017 for a proposed development comprising demolition of existing buildings and the provision of up to 600 residential units; and associated landscaping, access, car parking (accessible spaces only) and other engineering works.
Granted Outline Demolition 2 docs -
1 - 2 Citadel Place Lambeth London SE11 5EF
Request for a Screening Opinion in respect of an Environmental Impact Assessment (EIA) pursuant to Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations, 2017 for a proposed development comprising demolition of existing buildings and the provision of up to 660 residential units; and associated landscaping, access, car parking (accessible spaces only) and other engineering works.
Decided Demolition 4 docs -
Arch 112 Randall Road London SE11 5JR
78% historically approved · decision due ~6 Oct
Change of use from industrial/storage (B2/B8) to commercial kitchen and delivery centre (Sui Generis) housing ten commercial delivery kitchens (retrospective).
Awaiting decision Full applications 13 docs
Other full applications
In Lambeth
-
26/03217/FUL Awaiting decision
20 Bellefields Road London Lambeth SW9 9UQ
Erection of a single storey side extension including rooflights, increased door size to the rear elevation, replacement windows on a like-for-like basis, and reinstatement of the lower ground floor side door under the entrance steps to the front elevation (to provide direct access to the outside).
-
26/03214/FUL Awaiting decision
39 Holmewood Gardens London Lambeth SW2 3NA
Erection of a rear dormer window, installation of two front roof lights and two roof lights to the rear outrigger, installation of solar panels, and installation of an external A/C unit to the rear outrigger.
-
26/03202/FUL Awaiting decision
73 Ramillies Close London Lambeth SW2 5DQ
Retrofit measures installed to existing dwellinghouses. Measures include replacement of windows and doors, and fabric upgrades to roof, including replacement of roof finishings, and replacement of light wells in main roof.
-
26/03197/FUL Awaiting decision
196-198 Flat K Brixton Road London Lambeth SW9 6AP
Replacement of a rear door with a like-for-like timber french door featuring a traditional six panel configuration (Please note: The reference number for this Listed Building Consent application is 26/03198/LB but there is also an associated application for Full Planning Permission related to these works with reference number: 26/03197/FUL)
-
26/03193/FUL Awaiting decision
Unit 9 Ellerslie Square Industrial Estate 11 Lyham Road London SW2 5DZ
Replacement of existing roof, window frames, entrance/fire exit doors and roller shutters.