Planning application
Land At New Park Road London SW2 4LH
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of four buildings 4 to 6 storeys in height to provide residential units (Use Class C3) together with associated landscaping, Blue Badge car parking, cycle parking structures. Please note for consultation purposes the number of residential units to be provided is 129 units.
As published by the council, reference 25/02125/FUL
Application record
- Reference
- 25/02125/FUL
- Type
- Full Planning Permission
- Status
- Awaiting decision
- Received
- 30 Jun 2025
- Validated
- 24 Jul 2025
- Ward
- Clapham Park
- Postcode
- SW2 4LH
Timeline
Dates from the published record
-
30 Jun 2025
Received by Lambeth
-
24 Jul 2025
Validated
Checked as complete and ready for consideration.
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 18 September 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Lambeth took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Sphere25 LLP Agent, registered in Waterbeach
Active · incorporated 2018 · Waterbeach
163 applications on PlanIndex · across 21 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordMetropolitan Housing Trust Limited Applicant
Active
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
240 documents on file for this application
- INTERNAL CYCLE STORE DETAILS -
- PROPOSED SITE NORTH, SOUTH & EAST ELEVATIONS
- PROPOSED SITE SECTIONS EE & FF
- BLOCK C&D PROPOSED WEST ELEVATIONS
- PROPOSED G+0 PLAN
- BLOCK C&D PROPOSED EAST ELEVATIONS
- BLOCK D ? PROPOSED SECTION FF
- BLOCK D PROPOSED SOUTH ELEVATION
- BLOCK C PROPOSED G+0 PLAN
- EXTERNAL CYCLE STORE DETAILS 02
- PROPOSED SITE WEST ELEVATIONS
- BBLOCK D PROPOSED G+0 PLAN
- BLOCK B PROPOSED G+0 PLAN
- BLOCK A PROPOSED G+0 PLAN
- EXTERNAL CYCLE STORE DETAILS 01
- BE GREEN FULL SAP CALCULATIONS
- BE LEAN FULL SAP CALCULATIONS
- BE LEAN FULL SAP CALCULATIONS
- REVISED ENERGY STATEMENT
- REVISED CARBON EMISSION REPORTING SPREADSHEET
- BE GREEN FULL SAP CALCULATIONS
- BE GREEN FULL SAP CALCULATIONS
- BE LEAN FULL SAP CALCULATIONS
- BE LEAN FULL SAP CALCULATIONS
- BE LEAN FULL SAP CALCULATIONS
- BE GREEN FULL SAP CALCULATIONS
- BE GREEN FULL SAP CALCULATIONS
- BE LEAN FULL SAP CALCULATIONS
- BE LEAN FULL SAP CALCULATIONS
- REVISED SUSTAINABILITY STATEMENT
- BE GREEN FULL SAP CALCULATIONS
- BE GREEN FULL SAP CALCULATIONS
- BE GREEN FULL SAP CALCULATIONS
- BE LEAN FULL SAP CALCULATIONS
- BE LEAN FULL SAP CALCULATIONS
- BE GREEN FULL SAP CALCULATIONS
- BE GREEN FULL SAP CALCULATIONS
- BE LEAN FULL SAP CALCULATIONS
- BE LEAN FULL SAP CALCULATIONS
- BE GREEN FULL SAP CALCULATIONS
- BE GREEN FULL SAP CALCULATIONS
- BE LEAN FULL SAP CALCULATIONS
- REVISED BE SEEN SPREADSHEET
- BE GREEN FULL SAP CALCULATIONS
- BE GREEN FULL SAP CALCULATIONS
- BE LEAN FULL SAP CALCULATIONS
- BE LEAN FULL SAP CALCULATIONS
- TECHNICAL NOTE LAMBETH BOROUGH COUNCIL TECHNICAL RESPONSE
- GROUND LEVEL TREE ASSESSMENT REDACTED
- REVISED DAYLIGHT, SUNLIGHT & OVERSHADOWING ASSESSMENT
- FULL SAP CALCULATION D.00.03_GREEN
- FULL SAP CALCULATION D.01.03_CLEAN
- FULL SAP CALCULATION A.00.01_CLEAN
- FULL SAP CALCULATION A.05.01_LEAN
- FULL SAP CALCULATION C.03.01_GREEN
- FULL SAP CALCULATION D.01.01_GREEN
- FUL SAP CALCULATION C.00.01_GREEN
- FULL SAP CALCULATION B.00.01_CLEAN
- FULL SAP CALCULATION D.01.03_LEAN
- FULL SAP CALCULATION B.00.01_GREEN
- FULL SAP CALCULATION C.01.01_CLEAN
- FULL SAP CALCULATION D.00.01_LEAN
- FULL SAP CALCULATION D.03.03_CLEAN
- FULL SAP CALCULATION B.00.01_LEAN
- UK POWER NETWORK GENERIC INDICATIVE MOBILISATION AND DELIVERY TIMELINE
- UK POWER NETWORKS NEW PARK ROAD, SW2 4HT NEW 800KVA S/STN
- FULL SAP CALCULATION D.01.03_GREEN
- FULL SAP CALCULATION D.00.01_GREEN
- FULL SAP CALCULATION D.00.03_CLEAN
- FUL SAP CALCULATION C.01.01_LEAN
- FULL SAP CALCULATION D.0.01_CLEAN
- FULL SAP CALCULATION B.05.01_LEAN
- FULL SAP CALCULATION A.05.01_GREEN
- FULL SAP CALCULATION A.01.01_GREEN
- FULL SAP CALCULATION B.05.01_CLEAN
- FULL SAP CALCULATION A.00.01_GREEN
- FUL SAP CALCULATION C.01.01_GREEN
- UK POWER NETWORKS SITE INFORMATION PACK
- FULL SAP CALCULATION C.00.01_LEAN
- FULL SAP CALCULATION A.05.01_CLEAN
- FULL SAP CALCULATION B.05.01_GREEN
- FULL SAP CALCULATION D.00.03_LEAN
- FULL SAP CALCULATION A.01.01_LEAN
- FULL SAP CALCULATION C.03.01_LEAN
- FULL SAP CALCULATION A.00.01_LEAN
- FULL SAP CALCULATION D.03.03_GREEN
- FULL SAP CALCULATION C.03.01_CLEAN
- FULL SAP CALCULATION B.01.01_CLEAN
- FULL SAP CALCULATION D.03.03_LEAN
- FULL SAP CALCULATION B.01.01_LEAN
- FULL SAP CALCULATION B.01.01_GREEN
- FULL SAP CALCULATION A.01.01_CLEAN
- FULL SAP CALCULATION D.00.01_CLEAN
- FULL SAP CALCULATION D.0.01_LEAN
- FULL SAP CALCULATION C.00.01_CLEAN
- UK POWER NETWORK LETTER DATED 05/ DECEMBER 2024
- COVER LETTER REDACTED
- BLOCK D - PROPOSED SECTION GG
- BLOCK D - PROPOSED G+1 TO G+3 PLAN
- BLOCK D - PROPOSED G+0 PLAN
- BLOCK B - PROPOSED SOUTH ELEVATION
- BLOCK A - PROPOSED ROOF PLAN
- PROPOSED LOCATION PLAN
- BLOCK D - PROPOSED SOUTH ELEVATION
- BLOCK A - PROPOSED NORTH ELEVATION
- BLOCK A - PROPOSED G+1 TO G+4 PLAN
- BLOCK D - PROPOSED ROOF PLAN
- BLOCK D- PROPOSED G+5 PLAN
- BLOCK B - PROPOSED G+5 PLAN
- BLOCK B - PROPOSED G+1 TO G+4 PLAN
- BLOCK D - PROPOSED NORTH ELEVATION
- BLOCK C - PROPOSED G+0 PLAN
- PROPOSED G+0 PLAN
- BLOCK B - PROPOSED NORTH ELEVATION
- BLOCK B - PROPOSED G+0 PLAN
- BLOCK A - PROPOSED G+0 PLAN
- BLOCK C - PROPOSED ROOF PLAN
- BLOCK C - PROPOSED G+1 TO G+3 PLAN
- BLOCK C - PROPOSED NORTH ELEVATION
- BLOCK C - PROPOSED SOUTH ELEVATION
- BLOCK A - PROPOSED SOUTH ELEVATION
- BLOCK D - PROPOSED G+4 PLAN
- BLOCK B - PROPOSED ROOF PLAN
- BLOCK A - PROPOSED G+5 PLAN
- BLOCK A - PROPOSED SECTION CC
- BLOCK A&B - PROPOSED SECTION AA
- PROPOSED SITE WEST ELEVATIONS
- PROPOSED G+3 PLAN
- PROPOSED G+2 PLAN
- PROPOSED G+0 PLAN
- PROPOSED SITE NORTH, SOUTH & EAST ELEVATIONS
- BLOCK C&D - PROPOSED EAST ELEVATIONS
- BLOCK A&B- PROPOSED EAST ELEVATIONS
- EXISTING SECTIONS AA & BB
- PROPOSED ROOF PLAN
- INTERNAL CYCLE STORE DETAILS
- PROPOSED G+4 PLAN
- EXISTING SITE PLAN
- EXTERNAL CYCLE STORE DETAILS 02
- BLOCK A&B - PROPOSED WEST ELEVATIONS
- BLOCK A&B - PROPOSED SECTION BB
- PROPOSED SITE SECTIONS AA & BB
- PROPOSED G+1 PLAN
- CONSTRAINS PLAN
- BLOCK A&C - PROPOSED SECTION EE
- BLOCK B - PROPOSED SECTION DD
- PROPOSED SITE SECTIONS CC & DD
- LOCATION PLAN
- LANDSCAPE PLAN
- BLOCK D - PROPOSED SECTION FF
- EXISTING WEST ELEVATION
- PROPOSED SITE SECTIONS EE & FF
- BLOCK C&D - PROPOSED WEST ELEVATIONS
- EXTERNAL CYCLE STORE DETAILS 01
- PROPOSED G+5 PLAN
- DESK STUDY, SITE INVESTIGATION & RISK ASSESSMENT REPORT PART 1 REDACTED
- HEALTH IMPACT ASSESSMENT REDACTED PART 1
- HEALTH IMPACT ASSESSMENT REDACTED PART 2
- BIODIVERSITY NET GAIN ASSESSMENT REDACTED
- DESK STUDY, SITE INVESTIGATION & RISK ASSESSMENT REPORT PART 6 REDACTED
- SOCIAL INFRASTRUCTURE IMPACT ASSESSMENT REDACTED
- UTILITIES STATEMENT REPORT PART 1 REDACTED
- UTILITIES STATEMENT REPORT PART 2 REDACTED
- FIRE STRATEGY REDACTED
- ARBORICULTURAL IMPACT ASSESSMENT REDACTED
- 'BE SEEN' REPORTING SPREADSHEET REDACTED
- EQUALITY IMPACT ASSESSMENT REDACTED
- PART16
- AIR QUALITY ASSESSMENT
- LANDSCAPE STATEMENT - PART 1
- LANDSCAPE STATEMENT - PART 3
- LANDSCAPE STATEMENT - PART 5
- ENVIRONMENTAL NOISE ASSESSMENT
- GLA CARBON EMISSION REPORTING SPREADSHEET
- UNIT SCHEDULE
- DESK STUDY, SITE INVESTIGATION & RISK ASSESSEMENT REPORT - PART 8
- TRANSPORT ASSESSMENT - PART 1
- APPLICATION FORM - WITHOUT PERSONAL DATA
- COMMUNITY INFRASTRUCTURE LEVY - COMPLETED FORM
- PART 7
- PART 9
- UTILITIES STATEMENT REPORT - PART 3
- PROPOSED SCHEME DAYLIGHT, SUNLIGHT & OVERSHADOWING ASSESSMENT - PART 2
- ARCHAEOLOGICAL DESK BASED ASSESSMENT
- STATEMENT OF COMMUNITY INVOLVEMENT
- FRAMEWORK TRAVEL PLAN - PART 1
- FRAMEWORK TRAVEL PLAN - PART 4
- PART12
- PART14
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY REPORT - PART 4
- AREA AND ACCOMMODATION SCHEDULE
- DESK STUDY, SITE INVESTIGATION & RISK ASSESSEMENT REPORT - PART 3
- PRELIMINARY ECOLOGICAL APPRAISAL REPORT
- BIODIVERSITY METRIC CALCULATION TOOL
- PART 2
- PART 8
- PART15
- LANDSCAPE STATEMENT - PART 4
- PROPOSED SCHEME DAYLIGHT, SUNLIGHT & OVERSHADOWING ASSESSMENT - PAR T1
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY REPORT - PART 2
- HERITAGE IMPACT ASSESSMENT
- DESK STUDY, SITE INVESTIGATION & RISK ASSESSEMENT REPORT - PART 7
- CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN
- FRAMEWORK TRAVEL PLAN - PART 3
- TRANSPORT ASSESSMENT - PART 7
- PART 1
- PART 10
- WHOLE LIFE CYCLE CARBON ASSESSMENT
- LANDSCAPE STATEMENT - PART 2
- PROPOSED SCHEME DAYLIGHT, SUNLIGHT & OVERSHADOWING ASSESSMENT - PART 3
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY REPORT - PART 3
- DESK STUDY, SITE INVESTIGATION & RISK ASSESSEMENT REPORT - PART 9
- DELIVERY AND SERVICING PLAN - PART 1
- FRAMEWORK TRAVEL PLAN - PART 2
- TRANSPORT ASSESSMENT - PART 2
- PLANNING STATEMENT
- PART 3
- PART 4
- CIRCULAR ECONOMY STATEMENT
- DAYLIGHT, SUNLIGHT & OVERSHADOWING ASSESSMENT
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY REPORT - PART 1
- BIODIVERSITY NET GAIN
- DESK STUDY, SITE INVESTIGATION & RISK ASSESSEMENT REPORT - PART 5
- OPERATIONAL WASTE MANAGEMENT PLAN - PART 1
- OPERATIONAL WASTE MANAGEMENT PLAN - PART 2
- TRANSPORT ASSESSMENT - PART 5
- TRANSPORT ASSESSMENT - PART 6
- PART 5
- PART 6
- ENERGY STATEMENT
- WASTE CALCULATOR FOR SITE WASTE MANAGEMENT PLANS
- DESK STUDY, SITE INVESTIGATION & RISK ASSESSEMENT REPORT - PART 4
- DELIVERY AND SERVICING PLAN - PART 2
- OPERATIONAL WASTE MANAGEMENT PLAN - PART 3
- TRANSPORT ASSESSMENT - PART 3
- TRANSPORT ASSESSMENT - PART 4
- PART11
- PART13
- SUSTAINABILITY STATEMENT
- DESK STUDY, SITE INVESTIGATION & RISK ASSESSEMENT REPORT - PART 2
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Lambeth for determination, against a statutory target of eight weeks. Over the last year Lambeth decided full applications in a median of 66 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
89 Tierney Road London SW2 4QH
Approval of details pursuant to conditions 4 (cycle parking), 5 (waste and recycling storage), 6 (water efficiency) and 7 (boundary treatments) of planning permission ref. 22/01888/FUL (Subdivision of existing single dwelling to create; 1 duplex 3-bed (6 person) unit at lower ground and ground floor levels; 1 2-bed (4 person) unit at first floor level; and 1 duplex 3-bed (4 person) unit at second and third floor levels. Erection of a single storey ground floor rear/side infill extension, construction of a bay window to ground floor level, excavation of a basement-level lightwell and installation of two obscured glazed windows to basement level.), granted 19.09.2023.
Granted Extension Windows or glazingSmall domestic -
Brunel House Montrell Road London SW2 4QA
Tree Preservation Order No. 456 (Clapham Park Estate) Area A1 (all trees within the estate boundary) Date Order Made: 18 December 2007 T457 (Tag No. 748) Sycamore: Fell to as close to ground level as practicable. Reason: The tree is suffering from advanced Sooty Bark Disease (Cryptostroma corticale), showing chronic dieback, widespread deadwood, and a sparse crown. It stands adjacent to the public footway and highway, presenting a high risk of branch failure.
Granted Trees 4 docs -
91 - 93 New Park Road London SW2 4AX
93% historically approved · decision due ~21 Dec
T726 Purple Plum - Create a new pollarded crown at a height of 3m - A number of limbs have failed in recent years. Cavity at main break. Close to school entrance, high pedestrian traffic. To retain the tree in some form. T19 Oak - Conduct a vertical and horizontal reduction of the crown to establish a 3m gap between the adjacent block of flats and the remaining crown of the tree. To provide light to the adjacent property. T82 Plane - Conduct a vertical and horizontal reduction of the crown to establish a 3m gap between the adjacent block of flats and the remaining crown of the tree. To provide light to the adjacent property. T147 Willow - Pollard to reduce height from 14m to 12m and radius from 12m to 8m on all sides. To maintain tree stability due to decay at base of stem and decay at 5m. T187 Plane - Reduce overextended limb on south side of crown by 3m from a radius of 10m to 7m. To maintain the integrity of this limb and balance crown. T204 Plane - Conduct a vertical and horizontal reduction of the crown to establish a 3m gap between the adjacent block of flats and the remaining crown of the tree. On the East and North side of crown. To provide light to the adjacent properties. T321 Plane - Conduct a vertical and horizontal reduction of the crown to establish a 3m gap between the adjacent block of flats and the remaining crown of the tree. To provide light to the adjacent property.
Awaiting decision Trees -
47 Tierney Road London SW2 4QH
Application for a non-material amendment following a grant of planning permission ref 19/01473/FUL (Erection of a single storey outbuilding to the rear garden) granted on 03.07.2019.
Granted Amendments 7 docsSmall domestic -
Outside 30 Streatham Place London SW2 4QY
Display of an internally illuminated single digital LCD screen as part of a Communication Hub unit.
Granted Advertising 15 docs -
25 Kirkstall Gardens London SW2 4HR
Application for prior approval for the erection of a single storey ground floor rear extension with dimensions of 4.5m (length), 3.2m (total maximum height) and 3.2m (height to the eaves).
Refused Prior approval Extension 11 docsSmall domestic
Other full applications
In Lambeth
-
26/03217/FUL Awaiting decision
20 Bellefields Road London Lambeth SW9 9UQ
Erection of a single storey side extension including rooflights, increased door size to the rear elevation, replacement windows on a like-for-like basis, and reinstatement of the lower ground floor side door under the entrance steps to the front elevation (to provide direct access to the outside).
-
26/03214/FUL Awaiting decision
39 Holmewood Gardens London Lambeth SW2 3NA
Erection of a rear dormer window, installation of two front roof lights and two roof lights to the rear outrigger, installation of solar panels, and installation of an external A/C unit to the rear outrigger.
-
26/03202/FUL Awaiting decision
73 Ramillies Close London Lambeth SW2 5DQ
Retrofit measures installed to existing dwellinghouses. Measures include replacement of windows and doors, and fabric upgrades to roof, including replacement of roof finishings, and replacement of light wells in main roof.
-
26/03197/FUL Awaiting decision
196-198 Flat K Brixton Road London Lambeth SW9 6AP
Replacement of a rear door with a like-for-like timber french door featuring a traditional six panel configuration (Please note: The reference number for this Listed Building Consent application is 26/03198/LB but there is also an associated application for Full Planning Permission related to these works with reference number: 26/03197/FUL)
-
26/03193/FUL Awaiting decision
Unit 9 Ellerslie Square Industrial Estate 11 Lyham Road London SW2 5DZ
Replacement of existing roof, window frames, entrance/fire exit doors and roller shutters.