Planning application
Wreaks End Causeway Bridge On the A595 West Broughton LA20
Works: Extension
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Listed Building Consent for the repair of a damaged 2m section of the downstream parapet wall east of centre. Remove damaged material and reconstruct using available original material. A new coping stone approximately 900mm in length to replace on damaged beyond repair. Removal of sawn cut copings to be replaced by new riven slate copings. Replace sawn cut slate copings on 2.8m downstream parapet extension constructed in September 2025 with the Broughton Moor riven slate
As published by the council, reference 2026/1864/LBC
Application record
- Reference
- 2026/1864/LBC
- Type
- Listed Building Consent
- Status
- Consultation Started
- Received
- 23 Sep 2026
- Validated
- 25 Sep 2026
- Ward
- High Furness
- Parish
- Kirkby Ireleth, Duddon
- Decision by
- Delegated
Comment by 29 October 2026
The council is taking comments on this application until then. Comments go to Lake District National Park through their own planning portal.
Timeline
Dates from the published record
-
23 Sep 2026
Received by Lake District National Park
-
25 Sep 2026
Validated
Checked as complete and ready for consideration.
-
6 Oct 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 20 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Lake District National Park took a median of 54 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Lake District National Park for determination, against a statutory target of eight weeks. Over the last year Lake District National Park decided heritage and listed building applications in a median of 77 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Other heritage and listed building applications
In Lake District National Park
-
7/2026/5464 Granted
Barrow Wife, Cartmel Fell, Grange-over-Sands, LA11 6NZ
Replacement window to SW gable
-
2026/1606/LBC Granted
64 Highgate KENDAL LA9 4TF
Listed Building Consent for alterations to the internal modern lobby screen to replace the door
-
2026/1539/LBC Granted
Clock Tower 3 Boarbank Farm Boarbank Lane Allithwaite GRANGE-OVER-SANDS LA11 7QU
Listed Building Consent for replacement external timber double doors with painted timber double doors of matching design, proportions and appearance, incorporating double glazed units
-
2026/1357/LBC Granted
The Old Bar Cavendish Street Cartmel GRANGE-OVER-SANDS LA11 6QA
Retrospective Listed Building Consent for internal alterations to the second floor accommodation, installation of timber top-hung sash windows in place of approved timber sliding sash windows on the side and rear elevations of the property, minor repositioning of an approved rooflight, and lowering of the ground floor level.
-
2026/1537/LBC Granted
White House Langwathby PENRITH CA10 1LW
Listed building consent for the replacement of two open fires with wood burning stoves and surrounds.