26/01437/FUL

101,103 And 105 Burlington Road New Malden KT3 4LR

Awaiting decision Kingston upon Thames Full Application

Proposal

Erection of ground floor rear extension, first-floor rear extensions at Nos. 101 and 103 Burlington Road, a part first-floor rear extension at No. 105 Burlington Road. Hip to gable roof extension with a rear dormer and installation of 3nos front rooflights at No. 101 Burlington Road. Enlargement and alterations to the existing rear dormer at No. 103 Burlington Road.

As published by the council, reference 26/01437/FUL

Timeline

Dates from the published record

  1. 1 Jul 2026

    Received by Kingston upon Thames

  2. 15 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 30 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Kingston upon Thames for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 23/01718/NMA Granted

    Burlington Junior Burlington School Burlington Road New Malden KT3 4LT

    Non-Material Amendment to Planning Permission 21/03821/KPSID (Demolition of the existing CLASP building and the erection of a new 3 storey teaching block and adjoining sports hall to facilitate a 5 FE junior school, external works to the existing outdoor school playing areas, 2 no. Multi Use Games Areas (MUGA) (including one floodlit), new junior playground area, reconfiguration of internal access, new staff car parking area and cycle parking, works to the existing Victorian Block, new pedestrian access points, a new covered link, landscaping and other associated works. The school will be subject to a Community Use Agreement.) to allow amendment in Condition 1(Approved Plan)and 19 (Detailed Drainage Design) including changes to landscape levels, a pumped SW solution, foul water pumping to the Victorian block and other associated works.

    26 Jun 2023 46m away Amendments
  • 21/03821/KPSID Granted

    Burlington Junior Burlington School Burlington Road New Malden KT3 4LT

    Demolition of the existing CLASP building and the erection of a new 3 storey teaching block and adjoining sports hall to facilitate a 5 FE junior school, external works to the existing outdoor school playing areas, 2 no. Multi Use Games Areas (MUGA) (including one floodlit), new junior playground area, reconfiguration of internal access, new staff car parking area and cycle parking, works to the existing Victorian Block, new pedestrian access points, a new covered link, landscaping and other associated works. The school will be subject to a Community Use Agreement.

    1 Dec 2021 46m away
  • 21/03881/FUL Granted

    104 Burlington Road New Malden KT3 4NT

    Change of use of existing shop unit (Class E(a)) to restaurant (Class E(b)), erection of ramp, outdoor sitting and hardstanding in the front area and installation of extract flue duct to facilitate new kitchen

    6 Dec 2021 50m away Full applications
  • 21/03155/CLC Granted

    87 (Park House) Burlington Road New Malden KT3 4QP

    Details required for Conditions 13 (Basement Impact Assessment) and 15 (Basement Ramp Details) of planning permission 17/15107/FUL (Proposed extension to the existing building at second floor and third floor at the rear and a new fourth floor to accommodate eight new flats (comprising 6 x 1 bed units and 2 x 3 bed units) together with associated works)

    1 Oct 2021 57m away Conditions
  • 21/03688/FUL Granted

    106 Burlington Road New Malden KT3 4NS

    Installation of replacement kitchen flue

    19 Nov 2021 58m away Full applications
  • 21/02708/CPU Refused

    106 Burlington Road New Malden KT3 4NS

    Replacement and upgrade of existing external kitchen flue discharge system to rear elevation

    23 Aug 2021 61m away Lawful development

In Kingston upon Thames

  • 25/02103/FUL Decided

    12 Hardman Road Kingston Upon Thames KT2 6RH

    Change of use from a 6 bedroom HMO (Use Class C4) to a 7 bedroom HMO (Use Class Sui Generis) (Retrospective)

    11 Aug 2025 Full applications
  • 26/00923/FUL Granted

    Coombe Boys School College Gardens New Malden KT3 6NT

    Application under Section 73 of the Town and Country Planning Act 1990 to vary Conditions 10 (sustainable drainage scheme) and 25 (sustainability and energy conservation) for Application Reference Number: 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.) dated 03/12/2024. Variation of wording of Conditions 10 and 25 to reflect the phased nature of the construction programme.

    29 Apr 2026 Full applications
  • 26/00907/FUL Granted

    39 Reynolds Avenue Chessington KT9 2LQ

    Installation of dropped kerb for driveway

    28 Apr 2026 Full applications
  • 26/00770/FUL Granted

    Flat 6 The Water Gardens Warren Road Kingston Upon Thames KT2 7LF

    Replacement of uPVC and aluminium windows and balcony doors on a like-for like-basis (without trickle vents) with aluminium.

    13 Apr 2026 Full applications
  • 26/00700/FUL Granted

    95 Tolworth Rise North Tolworth KT5 9EP

    Demolition of outbuildings and rear conservatory and erection of two storey side and single storey rear extension. Erection of hip to gable and rear dormer roof extension with installation of 3nos. front rooflights to facilitate loft conversion. Conversion of house into 2nos. flats.

    1 Apr 2026 Full applications