Skip to content
PlanIndex Get alerts
Menu

Planning application

63 - 69 Kingston Road New Malden KT3 3PB

Awaiting decision Kingston upon Thames 26/01693/FUL Full applications

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Repair and reinstatement of the external envelope including brickwork reconstruction, rendered band, parapet replacement, gas main enclosure and window alterations (Part retrospective)

As published by the council, reference 26/01693/FUL

Application record

Reference
26/01693/FUL
Category
Full applications
Status
Pending Consideration
Received
31 Jul 2026
Validated
19 Aug 2026
Postcode
KT3 3PB

Timeline

Dates from the published record

  1. 31 Jul 2026

    Received by Kingston upon Thames

  2. 19 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 1 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 14 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Kingston upon Thames took a median of 64 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Kingston upon Thames for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 79 - 81 Kingston Road New Malden KT3 3PB

    20/00312/FUL Submitted 7 Feb 2020 53m away

    Installation of new shopfront and division of existing restaurant into two mixed use class units for restaurants/cafe (Use Class A3) and Hot Food Takeaway (Use Class A5)

    Granted Full applications Windows or glazing 8 docs
  • 79 - 81 Kingston Road New Malden KT3 3PB

    23/01982/FUL Submitted 20 Jul 2023 53m away

    Installation of new shopfront and subdivision of existing ground floor restaurant (Use Class E) into two units.

    Withdrawn Full applications Windows or glazing 7 docs
    Several homes
  • St George Lodge 79-81 Kingston Road New Malden KT3 3PB

    23/01803/FUL Submitted 5 Jul 2023 53m away

    Erection of front gable and side dormers roof extension to provide 4 additional bedrooms to existing Bed and Breakfast

    Granted Full applications Extension Loft or dormer 13 docs
  • 7 Penrith Road New Malden KT3 3QR

    25/02182/CPU Submitted 19 Aug 2025 60m away

    Erection of an L-shaped rear dormer roof extension with 2nos. front rooflights to facilitate loft conversion

    Granted Lawful development Extension Loft or dormer 12 docs
  • 58-60 Kingston Road New Malden KT3 3LZ

    26/00839/PAMA Submitted 20 Apr 2026 60m away

    Change of use at first and second floor from office (Use Class E) to 2nos. residential flats (Use Class C3)

    Granted Outline New dwelling 17 docs
  • 9 Montem Road New Malden KT3 3QW

    21/02643/CPU Submitted 17 Aug 2021 69m away

    Erection of hip to gable and rear dormer roof extensions and installation of 3no. rooflights to front roofslope

    Granted Lawful development Extension Loft or dormer 6 docs

In Kingston upon Thames

  • 26/01858/FUL Awaiting decision

    7 Graham Gardens Surbiton KT6 6LT

    Partial demolition of dwelling and erection of 2nos. new dwellings with associated access, bins and cycle provision.

    26 Aug 2026 Full applications
  • 25/02124/FUL Withdrawn

    87A Surbiton Road Kingston Upon Thames KT1 2HW

    Demolition of an existing rear extension and central chimney, erection of two storey rear extension. Part hip to gable roof extension with rear dormer. Raising roof ridge height and addition of 3 nos front rooflights to convert existing single family dwelling/house into 3 no. self-contained flats (2 x three- bedroom and 1 x two bedroom) with associated parking, amenity space, refuse/recycling storage and cycle parking facilities

    13 Aug 2025 Full applications
  • 25/02121/FUL Withdrawn

    87 Surbiton Road Kingston Upon Thames KT1 2HW

    Demolition of an existing rear extension and central chimney, erection of two storey rear extension. Part hip to gable roof extension with rear dormer. Raising roof ridge height and addition of 3nos front rooflights to convert existing single family dwelling/house into 3 no. self-contained flats (2 x three- bedroom and 1 x two bedroom) with associated parking, amenity space, refuse/recycling storage and cycle parking facilities

    13 Aug 2025 Full applications
  • 26/01766/FUL Awaiting decision

    276 Hook Road Chessington KT9 1PF

    Demolition of detached bungalow and erection of a three storey building containing 6nos. flats

    12 Aug 2026 Full applications
  • 26/01729/FUL Awaiting decision

    39 Wittering Close Kingston Upon Thames KT2 5GA

    Change of use of land from amenity land to residential garden (Use Class C3)

    6 Aug 2026 Full applications