Skip to content
PlanIndex Get alerts
Menu

Planning application

26/01293/FUL

High Street, Outside No. 201 Kingston Upon Thames KT3 4BH (E 521426 N 168094)

Awaiting decision Kingston upon Thames Full Application

Proposal

Removal of an existing ST6 unit and installation of street hub 3 unit

As published by the council, reference 26/01293/FUL

Timeline

Dates from the published record

  1. 17 Jun 2026

    Received by Kingston upon Thames

  2. 15 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 30 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Kingston upon Thames for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/01294/ADV Awaiting decision

    High Street, Outside No. 201 Kingston Upon Thames KT3 4BH (E 521426, N 168094)

    Installation of 2nos digital 75-inch LCD display screens, one on each side of the Street Hub unit.

    17 Jun 2026 0m away Advertising
  • 21/03086/TEL Refused

    Land Opposite No. 4 Kingston Road New Malden KT3 3LR

    Installation of 20m Phase 8 Monopole with wrapround cabinet at base and associated ancillary works

    23 Sep 2021 37m away Telecoms
  • 21/03691/FUL Refused

    Pavement Outside 178 High Street New Malden KT3 4ES

    Installation of an open access Communication Hub, following the removal of an existing communication apparatus

    19 Nov 2021 37m away Full applications
  • 21/03692/ADV Refused

    Pavement Outside 178 High Street New Malden KT3 4ES

    Installation of internally lit advertisement LCD sign integrated into proposed Communication Hub unit

    19 Nov 2021 37m away Advertising
  • 26/00916/CEU Awaiting decision

    181-185 High Street New Malden KT3 4BH

    Residential Use (Class C3) at 181 High Street (2nos. units at ground floor to rear of site) and 181-185 High Street (6nos. units at floors 1-3 to front of site)

    28 Apr 2026 46m away Lawful development
  • 26/01374/FUL Awaiting decision

    160 High Street New Malden KT3 4ES

    Installation of extraction canopy and associated ductwork for a charcoal-fired grill, including external ducting and flue.

    25 Jun 2026 65m away Full applications

In Kingston upon Thames

  • 25/02103/FUL Decided

    12 Hardman Road Kingston Upon Thames KT2 6RH

    Change of use from a 6 bedroom HMO (Use Class C4) to a 7 bedroom HMO (Use Class Sui Generis) (Retrospective)

    11 Aug 2025 Full applications
  • 26/00923/FUL Granted

    Coombe Boys School College Gardens New Malden KT3 6NT

    Application under Section 73 of the Town and Country Planning Act 1990 to vary Conditions 10 (sustainable drainage scheme) and 25 (sustainability and energy conservation) for Application Reference Number: 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.) dated 03/12/2024. Variation of wording of Conditions 10 and 25 to reflect the phased nature of the construction programme.

    29 Apr 2026 Full applications
  • 26/00907/FUL Granted

    39 Reynolds Avenue Chessington KT9 2LQ

    Installation of dropped kerb for driveway

    28 Apr 2026 Full applications
  • 26/00770/FUL Granted

    Flat 6 The Water Gardens Warren Road Kingston Upon Thames KT2 7LF

    Replacement of uPVC and aluminium windows and balcony doors on a like-for like-basis (without trickle vents) with aluminium.

    13 Apr 2026 Full applications
  • 26/00700/FUL Granted

    95 Tolworth Rise North Tolworth KT5 9EP

    Demolition of outbuildings and rear conservatory and erection of two storey side and single storey rear extension. Erection of hip to gable and rear dormer roof extension with installation of 3nos. front rooflights to facilitate loft conversion. Conversion of house into 2nos. flats.

    1 Apr 2026 Full applications