Planning application
Coombe Boys School College Gardens New Malden KT3 6NT
Works: Demolition
Relates to 24/01386/FUL
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Application for a Non-Material Amendment to Planning Permission ref: 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.). Amendment to building elevations and wording of Condition 26.
As published by the council, reference 25/02519/NMA
Application record
- Reference
- 25/02519/NMA
- Type
- Non-Material Amendment
- Status
- Granted
- Decision
- Granted As published: Application Granted
- Received
- 26 Sep 2025
- Validated
- 26 Sep 2025
- Decided
- 16 Dec 2025
- Ward
- Motspur Park & Old Malden East
- Parish
- New And Old Malden
- Decision by
- Delegated Decision
- Postcode
- KT3 6NT
Site history
Applications at this address on the Kingston upon Thames register
This site has had 13 applications since 2024: 8 approved, 4 refused.
-
26/01040/CLC Granted
Coombe Boys School College Gardens New Malden KT3 6NT
Details required for Conditions 31 and 32 (Community Use Agreement) of planning permission 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.)
-
26/00992/CLC Granted
Coombe Boys School College Gardens New Malden KT3 6NT
Details required for Condition 23 (Secure By Design) of planning permission 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.)
-
26/00923/FUL Granted
Coombe Boys School College Gardens New Malden KT3 6NT
Application under Section 73 of the Town and Country Planning Act 1990 to vary Conditions 10 (sustainable drainage scheme) and 25 (sustainability and energy conservation) for Application Reference Number: 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.) dated 03/12/2024. Variation of wording of Conditions 10 and 25 to reflect the phased nature of the construction programme.
-
26/00766/CLC Granted
Coombe Boys School College Gardens New Malden KT3 6NT
Details required for Condition 24 (flood risk) of planning permission 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.)
-
26/00484/NMA Withdrawn
Coombe Boys School College Gardens New Malden KT3 6NT
Application for a Non-Material Amendment for proposed amendments to the wording of conditions 10 and 25 of Planning Permission ref: 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout)
-
25/03142/CLC Refused
Coombe Boys School College Gardens New Malden KT3 6NT
Details required for Condition 31 (community use agreement) of planning permission 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.)
-
25/03140/CLC Refused
Coombe Boys School College Gardens New Malden KT3 6NT
Details required for Condition 24 (flood risk) of planning permission 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.)
-
25/03141/CLC Refused
Coombe Boys School College Gardens New Malden KT3 6NT
Details required for Condition 25 (Energy Evidence) of planning permission 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.)
-
25/03139/CLC Refused
Coombe Boys School College Gardens New Malden KT3 6NT
Details required for Condition 10 (Drainage Scheme Evidence) of planning permission 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.)
-
25/03138/CLC Granted
Coombe Boys School College Gardens New Malden KT3 6NT
Details required for Condition 8 (Fire Safety) of planning permission 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.)
Timeline
Dates from the published record
-
26 Sep 2025
Received by Kingston upon Thames
-
16 Dec 2025
Decision issued: Application Granted
-
3 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
24/01386/FUL Granted
Coombe Boys School College Gardens New Malden KT3 6NT
Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Kingston upon Thames granted permission on 16 December 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Coombe Boys School College Gardens New Malden KT3 6NT
Details required for Condition 31 (community use agreement) of planning permission 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.)
Refused Conditions Demolition 2 docs -
Coombe Boys School College Gardens New Malden KT3 6NT
Details required for Condition 24 (flood risk) of planning permission 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.)
Refused Conditions Demolition 2 docs -
Coombe Boys School College Gardens New Malden KT3 6NT
Details required for Condition 25 (Energy Evidence) of planning permission 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.)
Refused Conditions Demolition 2 docs -
Coombe Boys School College Gardens New Malden KT3 6NT
Details required for Condition 10 (Drainage Scheme Evidence) of planning permission 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.)
Refused Conditions Demolition 4 docs -
Coombe Boys School College Gardens New Malden KT3 6NT
Details required for Condition 8 (Fire Safety) of planning permission 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.)
Granted Conditions Demolition 2 docs -
Coombe Boys School College Gardens New Malden KT3 6NT
Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.
Granted Full applications Demolition 22 docs
Other amendment applications
In Kingston upon Thames
-
26/02299/NMA Awaiting decision
Kingston Leisure Centre Fairfield Road Kingston Upon Thames KT1 2PY
Application for a Non-Material Amendment to Planning Permission ref: 24/02624/CREG3 (Provision of a new leisure centre comprising main pool and learner pool, fitness studios, gym, sports halls, health suite, changing facilities, cafe, soft play, enhancements to the existing play area, landscaping and public realm, cycle parking, blue badge car parking, access and associated works. Listed building consent for partial removal of Kingston Museum boundary railings and wall and changes to the Kingston Museum garden.). Amendments comprising minor landscape and public realm refinements; revisions to access, parking, cycle parking and tree planting; detailed updates to the building elevations, facade components, plant and services; and minor internal layout improvements.
-
26/02309/NMA Awaiting decision
Willow Grange 1 - 3 Adelaide Road Surbiton KT6 4TA
Application for a Non-Material Amendment to Planning Permission ref: 25/01574/FUL (Change of use from care home (Use Class C2) to a large House in Multiple Occupation (HMO) providing specialist supported accommodation for vulnerable individuals (Use Class Sui Generis), including associated external alterations, changes to fenestration, provision of refuse storage, vehicle and cycle parking, landscaping and plant). Amendment to relocate the refuse and recycling store.
-
26/02289/NMA Awaiting decision
15 Apple Market Kingston Upon Thames KT1 1JE
Application for a Non-Material Amendment to Planning Permission ref: 19/01788/FUL (Change of Use from News Agents (Use Class A1) to Cafe (Use Class A3) with associated internal alterations). Amendment relates to the extraction fan equipment specification, with no proposed alterations to the approved external duct configuration or discharge position.
-
26/02252/NMA Awaiting decision
61 Malden Way New Malden KT3 6DX
Application for a Non-Material Amendment to Planning Permission ref: 22/00495/FUL (Conversion of single family dwelling into 2no. self-contained flats (1 x three-bedroom and 1 x three-bedroom duplex) with 1no. parking space at rear Extension of existing side dormer with installation of 2no side rooflights.). Amendment to internal floor plans to reflect the as-built internal layout of both units.
-
26/02251/NMA Awaiting decision
Coombe Boys School College Gardens New Malden KT3 6NU
Non-Material Amendment to Planning Permission 26/00923/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to vary Conditions 10 for the Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure. Dated 16/01/2024).