Planning application

21/03691/FUL

Pavement Outside 178 High Street New Malden KT3 4ES

Refused Kingston upon Thames Full Application

Proposal

Installation of an open access Communication Hub, following the removal of an existing communication apparatus

As published by the council, reference 21/03691/FUL

Timeline

Dates from the published record

  1. 19 Nov 2021

    Received by Kingston upon Thames

  2. 14 Jan 2022

    Decision issued: Refuse

  3. 26 Jul 2026

    Added to PlanIndex

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 21/03692/ADV Refused

    Pavement Outside 178 High Street New Malden KT3 4ES

    Installation of internally lit advertisement LCD sign integrated into proposed Communication Hub unit

    19 Nov 2021 0m away Advertising
  • 26/01374/FUL Awaiting decision

    160 High Street New Malden KT3 4ES

    Installation of extraction canopy and associated ductwork for a charcoal-fired grill, including external ducting and flue.

    25 Jun 2026 27m away Full applications
  • 26/01294/ADV Awaiting decision

    High Street, Outside No. 201 Kingston Upon Thames KT3 4BH (E 521426, N 168094)

    Installation of 2nos digital 75-inch LCD display screens, one on each side of the Street Hub unit.

    17 Jun 2026 37m away Advertising
  • 26/01293/FUL Awaiting decision

    High Street, Outside No. 201 Kingston Upon Thames KT3 4BH (E 521426 N 168094)

    Removal of an existing ST6 unit and installation of street hub 3 unit

    17 Jun 2026 37m away Full applications
  • 26/00916/CEU Awaiting decision

    181-185 High Street New Malden KT3 4BH

    Residential Use (Class C3) at 181 High Street (2nos. units at ground floor to rear of site) and 181-185 High Street (6nos. units at floors 1-3 to front of site)

    28 Apr 2026 50m away Lawful development
  • 21/02807/FUL Granted

    144 High Street New Malden KT3 4EP

    Section 73 application for the variation of Condition 1 (Approved Plans) of planning permission 20/03066/FUL (Proposed change of use from Use Class E(a) (formerly A1) Retail Supermarket to E(b) (formally A3) Restaurant and installation of extractor system to rear) to provide a better internal design including installation of water fountain

    31 Aug 2021 66m away Full applications

In Kingston upon Thames

  • 25/02103/FUL Decided

    12 Hardman Road Kingston Upon Thames KT2 6RH

    Change of use from a 6 bedroom HMO (Use Class C4) to a 7 bedroom HMO (Use Class Sui Generis) (Retrospective)

    11 Aug 2025 Full applications
  • 26/00923/FUL Granted

    Coombe Boys School College Gardens New Malden KT3 6NT

    Application under Section 73 of the Town and Country Planning Act 1990 to vary Conditions 10 (sustainable drainage scheme) and 25 (sustainability and energy conservation) for Application Reference Number: 24/01386/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.) dated 03/12/2024. Variation of wording of Conditions 10 and 25 to reflect the phased nature of the construction programme.

    29 Apr 2026 Full applications
  • 26/00907/FUL Granted

    39 Reynolds Avenue Chessington KT9 2LQ

    Installation of dropped kerb for driveway

    28 Apr 2026 Full applications
  • 26/00770/FUL Granted

    Flat 6 The Water Gardens Warren Road Kingston Upon Thames KT2 7LF

    Replacement of uPVC and aluminium windows and balcony doors on a like-for like-basis (without trickle vents) with aluminium.

    13 Apr 2026 Full applications
  • 26/00700/FUL Granted

    95 Tolworth Rise North Tolworth KT5 9EP

    Demolition of outbuildings and rear conservatory and erection of two storey side and single storey rear extension. Erection of hip to gable and rear dormer roof extension with installation of 3nos. front rooflights to facilitate loft conversion. Conversion of house into 2nos. flats.

    1 Apr 2026 Full applications