Skip to content
PlanIndex Get alerts
Menu

Planning application

Plimsoll Ship 103 Witham Kingston Upon Hull HU9 1AT

Awaiting decision Kingston upon Hull, City of 26/00499/FULL Full Planning Permission

Works: Extension Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

1. Regularisation and change of use of upper floors to hotel / short-stay accommodation 2. External alterations involving new windows 3. Construction of rear second-floor extension, replacement rear roof structure, roof terrace, and covered seating area.

As published by the council, reference 26/00499/FULL

Application record

Reference
26/00499/FULL
Type
Full Planning Permission
Status
Pending Consideration
Received
21 May 2026
Validated
21 May 2026
Ward
Drypool
Postcode
HU9 1AT

Site history

Applications at this address on the Kingston upon Hull, City of register

This site has had 2 applications since 2019: 1 approved, 0 refused.

  • 19/01142/ADV Granted

    Plimsoll Ship 103 Witham Kingston Upon Hull HU9 1AT

    Display of neon signs

    Decided 15 Nov 2019 Advertising

Timeline

Dates from the published record

  1. 21 May 2026

    Received by Kingston upon Hull, City of

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 16 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Kingston upon Hull, City of took a median of 59 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

ADP Ltd Agent

204 applications on PlanIndex · across 40 councils · 94% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

31 documents on file for this application

  • FLOOD COMMENTS Correspondence · 21 Jul 2026
  • E-MAIL FROM FLOOD TEAM Correspondence · 14 Jul 2026
  • FLOOD RISK COMMENTS Correspondence · 07 Jul 2026
  • PROPOSED PLANS Drawing · 03 Jul 2026
  • PROPOSED ELEVATIONS Drawing · 03 Jul 2026
  • NEW BUILD FORM BackGround Papers · 22 Jun 2026
  • FLOOD RISK ASSESSMENT BackGround Papers · 22 Jun 2026
  • CONSERVATION COMMENTS Correspondence · 22 Jun 2026
  • FLOOD COMMENTS Correspondence · 18 Jun 2026
  • HIGHWAYS DC COMMENTS Correspondence · 09 Jun 2026
  • PUBLIC COMMENT (PA) Public Comment · 03 Jun 2026
  • ENVIRONMENTAL HEALTH COMMENTS Correspondence · 02 Jun 2026
  • CHECKSHEET BackGround Papers · 29 May 2026
  • APPLICATION FORM - WITHOUT PERSONAL DATA Application Form · 21 May 2026
  • A SUMMARY OF THE ATTACHMENTS IN THE PROPOSAL BackGround Papers · 21 May 2026
  • THE LOCATION PLAN OS Extract · 21 May 2026
  • SITE LOCATION GEOJSON Other · 21 May 2026
  • FLOOD RISK ASSESSMENT Report · 21 May 2026
  • DESIGN AND ACCESS STATEMENT Other · 21 May 2026
  • HERITAGE STATEMENT Report · 21 May 2026
  • PLANNING STATEMENT Report · 21 May 2026
  • BLOCK PLAN OF THE SITE Drawing · 21 May 2026
  • SITE/BLOCK PLAN - EXISTING Other · 21 May 2026
  • LAYOUT PLAN - EXISTING Other · 21 May 2026
  • ELEVATION (FRONT) - EXISTING Other · 21 May 2026
  • ELEVATION (FRONT) - PROPOSED Other · 21 May 2026
  • ELEVATION (REAR) - EXISTING Other · 21 May 2026
  • FLOOR PLAN Other · 21 May 2026
  • ELEVATION (FRONT) - PROPOSED Other · 21 May 2026
  • ELEVATION (REAR) - PROPOSED Other · 21 May 2026
  • ELEVATION (SIDE) - PROPOSED Other · 21 May 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Kingston upon Hull, City of for determination, against a statutory target of eight weeks. Over the last year Kingston upon Hull, City of decided full applications in a median of 88 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Kingston upon Hull, City of

  • 26/00964/FULL Awaiting decision

    37 Philip Larkin Close Kingston Upon Hull HU6 7FB

    Change of use of a single dwelling house into a 3 bed House in Multiple Occupation

    Received 5 Oct, published by the council 11 Oct 2026 Full applications
  • 26/00948/FULL Awaiting decision

    24-25 Bishop Lane Kingston Upon Hull HU1 1PA

    Re-roofing to No 24 - 25 Bishop Lane. The proposed roof will be a combination of pitched and flat roof, the only public realm it will be visible from is Bishop Lane. The application drawing only includes the Bishop Lane elevation because of this reason

    Received 30 Sep, published by the council 11 Oct 2026 Full applications
  • 26/00827/FULL Granted

    4 Sunbeam Road Kingston Upon Hull HU4 6DZ

    1. Erection of a single storey side extension 5.95m (length) x 2.27m (width) x 3.415m (max height) 2. Construction of new roof to existing rear extensions and new dual pitched roof conservatory to replace existing conservatory to rear 4.025m (max height) x 4.94m (width) x 3.13m (long).

    Received 22 Aug, published by the council 27 Aug 2026 Full applications
  • 26/00820/FULL Granted

    36 Constable Street Kingston Upon Hull HU3 3BL

    Erection of a part two and single storey rear extension (5.3m (length) x 5m (width) x 5.26m (max height)

    Received 20 Aug, published by the council 27 Aug 2026 Full applications
  • 26/00335/FULL Granted

    Martello Hotel 309-323 Hedon Road Kingston Upon Hull HU9 1NU

    1. Change of use from Class C1 hotel/serviced apartments, to mixed use Class C1 hotel/serviced apartments and gym (Class E) for use by guests and the public. 2. Formation of first floor roof terrace with composite decking and timber fencing, including 2 x bedrooms converted to 2 x kitchenettes. 3. Installation of 3 x new doors and cladding.

    Received 10 Apr, published by the council 21 Jul 2026 Full applications