Skip to content
PlanIndex Get alerts
Menu

Planning application

Land To The West Of Tower Street And St Peter's Street, South-west Of Great Union Street,and South-east Of Clarence Street Kingston Upon Hull

Awaiting decision Kingston upon Hull, City of 26/00298/FULL Full Planning Permission

Works: Demolition Major scheme

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Hybrid application for a phased development comprising 1) the demolition of certain existing buildings and preparatory works 2) full detailed planning permission for the erection of 115 dwellings (C3), 363 sq m commercial and/or community uses (E and F2b,) the construction of a new river wall and river walkway, and associated access, parking, landscaping, and other infrastructure works. 3) outline planning permission with all matters reservedfor mixed use development comprising the erection of up to 735 dwellings, up to 1930 sq metres commercial and/or community uses (E and F2b), public open space, hard and soft landscaping, and other associated infrastructure and engineering works. (EIA development)

As published by the council, reference 26/00298/FULL

Application record

Reference
26/00298/FULL
Type
Full Planning Permission
Status
Pending Consideration
Received
30 Mar 2026
Validated
30 Mar 2026
Ward
Drypool

Timeline

Dates from the published record

  1. 30 Mar 2026

    Received by Kingston upon Hull, City of

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 25 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Kingston upon Hull, City of took a median of 59 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

208 documents on file for this application

  • ADDITIONAL CONSERVATION COMMENTS Correspondence · 11 Aug 2026
  • TRANSPORT ASSESSMENT Report · 24 Jul 2026
  • PLIMSOLL WAY RBT V02 Drawing · 24 Jul 2026
  • ENVIRONMENT AGENCY COMMENTS Correspondence · 15 Jun 2026
  • TPT AND WWCT JOINT COMMENTS Correspondence · 09 Jun 2026
  • EMAIL Correspondence · 05 Jun 2026
  • HISTORIC ENGLAND COMMENTS Correspondence · 02 Jun 2026
  • PRESS NOTICE Other · 01 Jun 2026
  • YORKSHIRE WATER COMMENTS Correspondence · 21 May 2026
  • E-MAIL FROM TRANS PENNINE TRAIL Correspondence · 19 May 2026
  • PUBLIC COMMENT (PA) Public Comment · 19 May 2026
  • HIGHWAYS DC COMMENTS Correspondence · 19 May 2026
  • NATIONAL HIGHWAYS COMMENTS Correspondence · 18 May 2026
  • NATIONAL HIGHWAYS HOLDING DIRECTION Correspondence · 18 May 2026
  • NATIONAL HIGHWAYS TECHNICAL NOTE Correspondence · 18 May 2026
  • E-MAIL FROM HISTORIC ENGLAND Correspondence · 11 May 2026
  • PUBLIC COMMENT Correspondence · 11 May 2026
  • CONSERVATION COMMENTS Correspondence · 11 May 2026
  • ACTIVE TRAVEL COMMENTS Correspondence · 11 May 2026
  • LEVELS PLAN PHASE 1 SHEET 1 OF 2 Drawing · 07 May 2026
  • TOPOGRAPHICAL SURVEY Drawing · 07 May 2026
  • TOPOGRAPHICAL SURVEY Drawing · 07 May 2026
  • DESIGN AND ACCESS STATEMENT PART 3 BackGround Papers · 07 May 2026
  • DESIGN AND ACCESS STATEMENT PART 4 BackGround Papers · 07 May 2026
  • DESIGN AND ACCESS STATEMENT PART 5 BackGround Papers · 07 May 2026
  • DESIGN AND ACCESS STATEMENT PART 6 BackGround Papers · 07 May 2026
  • EXISTING PLANS LOCK KEEPERS COTTAGE Drawing · 07 May 2026
  • SECTION EE Drawing · 07 May 2026
  • TOPOGRAPHICAL SURVEY Drawing · 07 May 2026
  • LEVELS PLAN PHASE 2 SHEET OF 2 Drawing · 07 May 2026
  • DESIGN AND ACCESS STATEMENT PART 1 BackGround Papers · 07 May 2026
  • DESIGN AND ACCESS STATEMENT PART 2 BackGround Papers · 07 May 2026
  • DESIGN AND ACCESS STATEMENT PART 7 BackGround Papers · 07 May 2026
  • TECHNICAL NOTE BackGround Papers · 07 May 2026
  • EXISTING PLANS BUOY SHED Drawing · 07 May 2026
  • TYPICAL E3 APARTMENTS Application Form · 07 May 2026
  • SECTION AA Drawing · 07 May 2026
  • SECTION 88 Drawing · 07 May 2026
  • SECTION CC Application Form · 07 May 2026
  • SECTION DD Drawing · 07 May 2026
  • PHASE 1 A1 Drawing · 07 May 2026
  • TYPICAL E2 RIVERFRONT Drawing · 07 May 2026
  • TYPICAL E2 TOWER STREET Drawing · 07 May 2026
  • COMMENTS FROM PUBLIC HEALTH Correspondence · 06 May 2026
  • COMMENTS FROM NATURAL ENGLAND Correspondence · 01 May 2026
  • URBAN DESIGN COMMENTS Correspondence · 01 May 2026
  • COMMENTS FROM NATURAL ENGLAND Correspondence · 01 May 2026
  • ENVIRONMENTAL PROTECTION COMMENTS Correspondence · 30 Apr 2026
  • PUBLIC COMMENT (PA) Public Comment · 29 Apr 2026
  • PERMIT TEAM COMMENTS Correspondence · 28 Apr 2026
  • PUBLIC COMMENT (PA) Public Comment · 20 Apr 2026
  • CHECKSHEET BackGround Papers · 17 Apr 2026
  • PUBLIC COMMENT (PA) Public Comment · 17 Apr 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Report · 02 Apr 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Report · 02 Apr 2026
  • PHASE 1 FOURTH FLOOR PLAN Drawing · 02 Apr 2026
  • PHASE 1 FIFTH FLOOR PLAN Drawing · 02 Apr 2026
  • PHASE 1 PROPOSED SECTION CC Drawing · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • PLANNING STATEMENT HIA FINAL Report · 02 Apr 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Report · 02 Apr 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Report · 02 Apr 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Report · 02 Apr 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Report · 02 Apr 2026
  • SITE LOCATION PLAN Drawing · 02 Apr 2026
  • EXISTING SITE SECTION SITEWIDE SECTION Drawing · 02 Apr 2026
  • EXISTING ELEVATIONS Drawing · 02 Apr 2026
  • EXISTING SITE ELEVATIONS Drawing · 02 Apr 2026
  • BLOCK PLAN Drawing · 02 Apr 2026
  • PHASE 1 FIRST FLOOR PLAN Drawing · 02 Apr 2026
  • PHASE 1 SECOND FLOOR PLAN Drawing · 02 Apr 2026
  • PHASE 1 FIFTH FLOOR PLAN Drawing · 02 Apr 2026
  • PHASE 1 PROPOSED SECTION AA Drawing · 02 Apr 2026
  • LANDSCAPE GEN ARRANGEMENT PHASE 1 SHEET 1 OF 2 Drawing · 02 Apr 2026
  • LANDSCAPE GEN ARRANGEMENT PHASE 1 SHEET 2 OF 2 Drawing · 02 Apr 2026
  • LANDSCAPE GEN ARRANGEMENT SECTIONS PHASE 1 CC DD Drawing · 02 Apr 2026
  • LANDSCAPE GEN ARRANGEMENT SECTIONS PHASE 1 EE FF Drawing · 02 Apr 2026
  • LANDSCAPE GEN ARRANGEMENT SECTIONS PHASE 1 AA BB Drawing · 02 Apr 2026
  • STATEMENT OF COMMUNITY INVOLVEMENT Report · 02 Apr 2026
  • ENERGY SUSTAINABILITY STRATEGY STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • EXISTING ELEVATIONS LOCK KEEPERS COTTAGE Drawing · 02 Apr 2026
  • BUOY SHED EXISTING GROUND FLOOR PLAN Drawing · 02 Apr 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Report · 02 Apr 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Report · 02 Apr 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Report · 02 Apr 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Report · 02 Apr 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Report · 02 Apr 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Report · 02 Apr 2026
  • EXISTING SITE SECTION Drawing · 02 Apr 2026
  • PHASE 1 PROPOSED SECTION BB Drawing · 02 Apr 2026
  • PHASE 1 PROPOSED SECTION DD Drawing · 02 Apr 2026
  • PHASE 1 PROPOSED SECTION EE Drawing · 02 Apr 2026
  • PHASE 1 PROPOSED SECTION FF Drawing · 02 Apr 2026
  • PHASE 1 PROPOSED SECTION GG Drawing · 02 Apr 2026
  • PLANTING PLAN PHASE 1 SHEET 2 OF 2 Drawing · 02 Apr 2026
  • PLANTING PLAN PHASE 1 SHEET 2 OF 2 Drawing · 02 Apr 2026
  • BIODIVERSITY METRIC RESULTS Report · 02 Apr 2026
  • SBM MASTERPLAN Report · 02 Apr 2026
  • AIR QUALITY ASSESSMENT Report · 02 Apr 2026
  • BNGA MASTERPLAN LEVEL PRELIMINA RED Report · 02 Apr 2026
  • BNGA PHASE 1 Report · 02 Apr 2026
  • DEVELOPMENT SPECIFICATION FINAL Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • EXISTING PLANS LOCK KEEPERS COTTAGE Drawing · 02 Apr 2026
  • APPLICANTS PLACED PRESS NOTICE Other · 02 Apr 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Report · 02 Apr 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Report · 02 Apr 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Report · 02 Apr 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Report · 02 Apr 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Report · 02 Apr 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Report · 02 Apr 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Report · 02 Apr 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Report · 02 Apr 2026
  • EXISTING SITE PLAN Drawing · 02 Apr 2026
  • EXISTING ROOF PLAN Drawing · 02 Apr 2026
  • SCHEDULE OF FLOOR AREAS Other · 02 Apr 2026
  • PHASE 1 GROUND FLOOR PLAN Drawing · 02 Apr 2026
  • PHASE 1 THIRD FLOOR PLAN Drawing · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • ENVIRONMENTAL STATEMENT Report · 02 Apr 2026
  • BUOY SHED EXISTING ELEVATIONS Drawing · 02 Apr 2026
  • ACOUSTIC PLANNING REPORT Report · 01 Apr 2026
  • PRELIMINARY SITE INVESTIGATION REPORT Report · 01 Apr 2026
  • PRELIMINARY SITE INVESTIGATION REPORT Report · 01 Apr 2026
  • PRELIMINARY SITE INVESTIGATION REPORT Report · 01 Apr 2026
  • PRELIMINARY SITE INVESTIGATION REPORT Report · 01 Apr 2026
  • TRANSPORT ASSESSMENT Report · 01 Apr 2026
  • FRAMEWORK TRAVEL PLAN Report · 01 Apr 2026
  • DESIGN CODE Report · 01 Apr 2026
  • DESIGN CODE Report · 01 Apr 2026
  • DESIGN CODE Report · 01 Apr 2026
  • PARAMETER PLAN DEMOLITION Drawing · 01 Apr 2026
  • PARAMETER PLAN DEVELOPMENT PLOTS Drawing · 01 Apr 2026
  • PARAMETER PLAN ACCESS AND MOVEMENT Drawing · 01 Apr 2026
  • DAYLIGHT SUNLIGHT ASSESSMENT Drawing · 01 Apr 2026
  • UTILITIES STATEMENT Report · 01 Apr 2026
  • ILLUSTRATIVE LANDSCAPE MASTERPLAN Drawing · 01 Apr 2026
  • PROPOSED ELEVATIONS PLOT E1 Drawing · 01 Apr 2026
  • PROPOSED ELEVATIONS PLOT E1 Drawing · 01 Apr 2026
  • PROPOSED ELEVATIONS PLOT E2 Drawing · 01 Apr 2026
  • PROPOSED ELEVATIONS PLOT E2 Drawing · 01 Apr 2026
  • PROPOSED ELEVATIONS PLOT E2 Drawing · 01 Apr 2026
  • PROPOSED ELEVATIONS PLOT E3 Drawing · 01 Apr 2026
  • PROPOSED ELEVATIONS PLOT E3 Drawing · 01 Apr 2026
  • PROPOSED ELEVATIONS PLOT E3 Drawing · 01 Apr 2026
  • PROPOSED ELEVATIONS PLOT E3 Drawing · 01 Apr 2026
  • PROPOSED ELEVATIONS PLOT E3 Drawing · 01 Apr 2026
  • PROPOSED ELEVATIONS PLOT E3 Drawing · 01 Apr 2026
  • PARAMETER PLAN MAXIMUM BUILDING HEIGHTS Drawing · 01 Apr 2026
  • PROPOSED ELEVATIONS PLOT E2 Drawing · 01 Apr 2026
  • PROPOSED ELEVATIONS PLOT E2 Drawing · 01 Apr 2026
  • PROPOSED ELEVATIONS PLOT E2 Drawing · 01 Apr 2026
  • PROPOSED ELEVATIONS PLOT E3 Drawing · 01 Apr 2026
  • PROPOSED ELEVATIONS PLOT FF Drawing · 01 Apr 2026
  • PROPOSED ELEVATIONS PLOT FF Drawing · 01 Apr 2026
  • PROPOSED ELEVATIONS PLOT FF Drawing · 01 Apr 2026
  • PROPOSED ELEVATIONS PLOT FF Drawing · 01 Apr 2026
  • TRANSPORT ASSESSMENT Report · 01 Apr 2026
  • PARAMETER PLAN PUBLIC REALM Drawing · 01 Apr 2026
  • PARAMETER PLAN PROPOSED LAND USE LOWER FLOORS Drawing · 01 Apr 2026
  • PARAMETER PLAN PROPOSED LAND USE UPPER FLOORS Drawing · 01 Apr 2026
  • TEMPORARY SUBSTATION STRATEGY Drawing · 01 Apr 2026
  • PROPOSED ELEVATIONS PLOT E3 Drawing · 01 Apr 2026
  • PROPOSED ELEVATIONS PLOT E3 Drawing · 01 Apr 2026
  • PROPOSED ELEVATIONS PLOT E3 Drawing · 01 Apr 2026
  • PLANNING STATEMENT HIA FINAL Report · 31 Mar 2026
  • TOWER STREET CLARENCE STREET Application Form · 31 Mar 2026
  • EXISTING SITE PLAN OS Extract · 31 Mar 2026
  • SITE LOCATION PLAN OS Extract · 31 Mar 2026
  • BLOCK PLAN OS Extract · 31 Mar 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Kingston upon Hull, City of for determination, against a statutory target of eight weeks. Over the last year Kingston upon Hull, City of decided full applications in a median of 88 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Kingston upon Hull, City of

  • 26/00964/FULL Awaiting decision

    37 Philip Larkin Close Kingston Upon Hull HU6 7FB

    Change of use of a single dwelling house into a 3 bed House in Multiple Occupation

    Received 5 Oct, published by the council 11 Oct 2026 Full applications
  • 26/00948/FULL Awaiting decision

    24-25 Bishop Lane Kingston Upon Hull HU1 1PA

    Re-roofing to No 24 - 25 Bishop Lane. The proposed roof will be a combination of pitched and flat roof, the only public realm it will be visible from is Bishop Lane. The application drawing only includes the Bishop Lane elevation because of this reason

    Received 30 Sep, published by the council 11 Oct 2026 Full applications
  • 26/00827/FULL Granted

    4 Sunbeam Road Kingston Upon Hull HU4 6DZ

    1. Erection of a single storey side extension 5.95m (length) x 2.27m (width) x 3.415m (max height) 2. Construction of new roof to existing rear extensions and new dual pitched roof conservatory to replace existing conservatory to rear 4.025m (max height) x 4.94m (width) x 3.13m (long).

    Received 22 Aug, published by the council 27 Aug 2026 Full applications
  • 26/00820/FULL Granted

    36 Constable Street Kingston Upon Hull HU3 3BL

    Erection of a part two and single storey rear extension (5.3m (length) x 5m (width) x 5.26m (max height)

    Received 20 Aug, published by the council 27 Aug 2026 Full applications
  • 26/00335/FULL Granted

    Martello Hotel 309-323 Hedon Road Kingston Upon Hull HU9 1NU

    1. Change of use from Class C1 hotel/serviced apartments, to mixed use Class C1 hotel/serviced apartments and gym (Class E) for use by guests and the public. 2. Formation of first floor roof terrace with composite decking and timber fencing, including 2 x bedrooms converted to 2 x kitchenettes. 3. Installation of 3 x new doors and cladding.

    Received 10 Apr, published by the council 21 Jul 2026 Full applications