Skip to content
PlanIndex Get alerts
Menu

Planning application

Rix Road Service Station And Adjacent Storage Land Stoneferry Road Kingston Upon Hull HU7 0EG

Awaiting decision Kingston upon Hull, City of 25/01112/FULL Full Planning Permission

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of coffee shop drive thru, car wash and 12x bay EV charging hub, with associated parking, substations, widened access, landscaping and boundary treatment (Address corrected)

As published by the council, reference 25/01112/FULL

Application record

Reference
25/01112/FULL
Type
Full Planning Permission
Status
Pending Consideration
Received
1 Dec 2025
Validated
1 Dec 2025
Ward
Holderness
Postcode
HU7 0EG

Timeline

Dates from the published record

  1. 1 Dec 2025

    Received by Kingston upon Hull, City of

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 26 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Kingston upon Hull, City of took a median of 57 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Bradley Stankler Planning Agent, a planning consultancy

20 applications on PlanIndex · across 10 councils · 92% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

59 documents on file for this application

  • APPLICANTS RESPONSE Correspondence · 24 Mar 2026
  • BEERCOCKS AGENTS LETTER Correspondence · 24 Mar 2026
  • OSCARS AGENTS LETTER Correspondence · 24 Mar 2026
  • FLOOD RISK ASSESSMENT Application Form · 16 Feb 2026
  • HIGHWAYS COMMENTS Correspondence · 16 Feb 2026
  • PROPOSED STREET SCENE ELEVATIONS Drawing · 12 Feb 2026
  • LANDSCAPE PROPOSAL Drawing · 12 Feb 2026
  • EXISTING SITE PLAN Drawing · 12 Feb 2026
  • PROPOSED CAR WASH Drawing · 12 Feb 2026
  • PROPOSED SITE PLAN Drawing · 12 Feb 2026
  • SITE ENTRANCE Drawing · 05 Feb 2026
  • COMMENTS FROM PLANNING POLICY Correspondence · 05 Feb 2026
  • STREETSCENE CGI Other · 19 Jan 2026
  • PRESS NOTICE Other · 06 Jan 2026
  • HIGHWAYS DC COMMENTS Correspondence · 06 Jan 2026
  • BNG ASSESSMENT Other · 29 Dec 2025
  • HABITAT PLAN Drawing · 29 Dec 2025
  • ACCESS OFFICER COMMENTS Correspondence · 29 Dec 2025
  • BIODIVERSITY METRIC CALCULATION TOOL Other · 29 Dec 2025
  • PROPOSED STREET SCENE ELEVATIONS Drawing · 29 Dec 2025
  • ECOLOGY COMMENTS Correspondence · 29 Dec 2025
  • COUNCILLOR CALL IN CTTEE LETTER Correspondence · 19 Dec 2025
  • URBAN FORESTRY COMMENTS Correspondence · 19 Dec 2025
  • COMMENTS FROM THE FLOOD TEAM Correspondence · 19 Dec 2025
  • COMMENTS FROM HUMBER ARCHAEOLOGY Correspondence · 17 Dec 2025
  • PUBLIC HEALTH COMMENTS Correspondence · 17 Dec 2025
  • ENVIRONMENT AGENCY COMMENTS Correspondence · 03 Dec 2025
  • CHECKSHEET Officer Notes · 02 Dec 2025
  • ECOLOGY REPORT Report · 01 Dec 2025
  • STONEFERRY ROAD Application Form · 29 Nov 2025
  • A SUMMARY OF THE ATTACHMENTS IN THE PROPOSAL BackGround Papers · 29 Nov 2025
  • DESIGN AND ACCESS STATEMENT Other · 29 Nov 2025
  • THE LOCATION PLAN OS Extract · 29 Nov 2025
  • SITE/BLOCK PLAN - EXISTING Other · 29 Nov 2025
  • PROPOSED SITE PLAN Drawing · 29 Nov 2025
  • PROPOSED CAR WASH Drawing · 29 Nov 2025
  • PROPOSED DRIVE THRU GA AND ROOF PLAN Drawing · 29 Nov 2025
  • PROPOSED DRIVE THRU ELEVATIONS Drawing · 29 Nov 2025
  • PROPOSED SUBSTATION DETAILS Drawing · 29 Nov 2025
  • TIMBER KNEE RAIL DETAILS Drawing · 29 Nov 2025
  • TOWN CENTRE USES - EVIDENCE Report · 29 Nov 2025
  • FLOOD RISK AND DRAINAGE ASSESSMENT Report · 29 Nov 2025
  • FLOOD RISK ASSESSMENT Report · 29 Nov 2025
  • LAND CONTAMINATION ASSESSMENT Report · 29 Nov 2025
  • BIODIVERSITY METRIC CALCULATION TOOL Other · 29 Nov 2025
  • COMMUNITY INFRASTRUCTURE LEVY - COMPLETED FORM Other · 29 Nov 2025
  • MATERIALS SCHEDULE Other · 29 Nov 2025
  • PROPOSED EV SUBSTATION DETAILS Drawing · 29 Nov 2025
  • PROPOSED CYCLE DETAILS Drawing · 29 Nov 2025
  • LANDSCAPING DETAILS Drawing · 29 Nov 2025
  • PLANNING STATEMENT Report · 29 Nov 2025
  • PLANNING STATEMENT Report · 29 Nov 2025
  • LAND CONTAMINATION ASSESSMENT Report · 29 Nov 2025
  • LAND CONTAMINATION ASSESSMENT Report · 29 Nov 2025
  • GARNES JONES LETTER 27 NOV 25 Correspondence · 29 Nov 2025
  • NOISE IMPACT ASSESSMENT Report · 29 Nov 2025
  • BIODIVERSITY STATEMENT Other · 29 Nov 2025
  • BIODIVERSITY SURVEY AND REPORT Other · 29 Nov 2025
  • TRANSPORT ASSESSMENT Report · 29 Nov 2025

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Kingston upon Hull, City of for determination, against a statutory target of eight weeks. Over the last year Kingston upon Hull, City of decided full applications in a median of 87 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Kingston upon Hull, City of

  • 26/00072/FULL Granted

    117 Newland Park (rear) Kingston Upon Hull HU5 2DT

    Erection of a two storey detached dwelling house with new vehicle access to Chanterlands Avenue.

    27 Jan 2026 Full applications
  • 26/00323/FULL Granted

    284 Cottingham Road Kingston Upon Hull HU6 8QA

    Erection of single storey dual pitched roof rear extension 4.35m (height) x 6.7m (width) x 9.5m (length), front porch extension 1.45m (length) x 2.24m (width) x 2.39m (height) and dual pitched roof rear garage extension 12.62m (length) x 4.675m (width) x 4.13m (height). (REVISED DESCRIPTION)

    8 Apr 2026 Full applications
  • 26/00694/FULL Granted

    82 Swinderby Garth Kingston Upon Hull HU7 4NF

    Construction of a rear single-storey extension to provide an accessible bedroom and bathroom, designed to meet the current and future needs of a young family member requiring accessible accommodation.

    15 Jul 2026 Full applications
  • 26/00222/FULL Granted

    77 County Road North Kingston Upon Hull HU5 4HN

    Creation of vehicular crossover with dropped kerb and installation of car turntable to front garden

    9 Mar 2026 Full applications
  • 26/00424/FULL Granted

    TONI&GUY 36 Paragon Street Kingston Upon Hull HU1 3ND

    Change of use of ground floor and 1st floor from hairdressing salon (Use Class E) to drinking establishment (Sui Generis).

    30 Apr 2026 Full applications